Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    Comparison of two and three‐dimensional seepage analysis in tailings dams – a case study

    By N Yarahmadi

    Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab

    Jul 1, 2021

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Hellyer tailings – complex mineralogy but higher grade than many ore bodies

    By M Barden, G Lane, B Quilliam

    NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing

    Nov 21, 2018

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    An Investigation of Current Flotation Survey Sampling

    By D Laskovski, T Nguyen

    Flotation surveying can be an extremely powerful means of determining opportunities for circuit optimisation and benchmarking. The type of survey employed depends heavily on the nature of the informat

    Jul 29, 2014

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Development of the Zafranal Geometallurgical Model

    By G Harbort

    The use of geological data for optimisation of operating plants has become a significant part of the modern process mindset. The underlying principle is to convert spatial geological data into metallu

    Sep 5, 2011

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit Mines

    By C T. Senra, A Souza

    Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor

    Jan 1, 2009

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018