Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Confidence Levels In Estimates
Traditionally, capital costs of major resource development projects have been estimated as a single amount to which a percentage accuracy has been assigned based on the method of preparation of the es
Jan 1, 1990
-
Hydrocyclone Classification Studies of a Complex Nickel Ore
By Nageswararao K
A series of tests was carried out on one of the rock-pebble milling circuits treating complex nickel ores at Kambalda Nickel Operations of Western Mining Corporation. A mathematical model to describe
Jan 1, 1981
-
Emerging Relationships Between Mineralised Plutonic Terranes in New Zealand And Eastern Australia
By J Ramezani, K Faure, N Mortimer
Western New Zealand can be regarded as a rifted continuation of eastern Australia. Detailed studies of units previously considered to have trans-Tasman correlations are being undertaken within the FRS
Jan 1, 2007
-
Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW
By Secis R
Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&
Jan 1, 1997
-
Indicator and Quartz Reefs
During the past Two years in reef gold mining, "indicators" have received great attention at the hands at the Victorian gold seekers. Many years ago, what was caned the" indicator lode,
-
Environmental Costs (and benefits) of Planning and Developing Mines and Quarries
The consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n
Jan 1, 1990
-
Wacker Sampling as an Effective Gold Exploration Tool in the Reefton Goldfield, Greenland Group, West Coast, New Zealand
By M E. Dunphy, P Silversmith
The Reefton Goldfield, both historically and potentially, represents a significant gold producing camp in the Westland province of New Zealand. Some two million ounces of gold have been produced from
Jan 1, 1997
-
Comparison of Grinding and Liberation Processes for Stalky Biomass Materials as a Prerequisite for Production of Energy Pellets with High Calorific Value
Comparison of Grinding and Liberation Processes for Stalky Biomass Materials as a Prerequisite for Production of Energy Pellets with High Calorific Value Pelletising biomass, especially straw and sta
Sep 13, 2010
-
Paper No. 129. Description of The Reduction Plant And Processes of Reduction of Wyalong Ores.
he Wyalong goldfields were discovered in September, 1893, Messrs. Neeld and Sons, owners of the principal mine, being the pioneer prospectors. During the earliest days of the field the ore was sent to
Jan 1, 1903
-
Spectrophotometric Determination of Z-200 (Isopropyl Ethylthionocarbamate) in Flotation Liquors
The ultraviolet spectrum of isopropyl ethylthionocarbamate (the principal constituent of Dow flotation collector Z-200) in water and of Z-200 itself in water was found to have an absorption peak at 24
Jan 1, 1969
-
Reverberatory Smelting Plant, Mount Morgan
During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States
Jan 1, 1939
-
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The
Dec 6, 2010
-
Software Tools for Open Pit Trucking Studies
Ledcap Pty Ltd has developed two software tools for assisting in the determination of life-of-mine (LOM) trucking requirements. The first tool generates haul paths and the second calculates truck trav
Dec 6, 2010
-
Laboratory-Scale Magnetohydrostatic Separator for High Resolution Density Analysis of Plastic and Other Wastes
Laboratory-Scale Magnetohydrostatic Separator for High Resolution Density Analysis of Plastic and Other Wastes Recycling and reuse of different plastic wastes is still a current problem to solve for
Sep 13, 2010
-
Underground Dams
The limit of pressure to which an underground dam may with safety be subjected, is a question that-as far as the writer knows has not received the same attention from authorities on engineering constr
Jan 1, 1901
-
Metana Minerals N.L. 1970-1990: An Emerging Diversified Miner
Metana Minerals commenced life in 1970 and graduated to a mining company in 1981 with the opening of a small alluvial tin-tantalite mine at Wodgina (W.A.) The present board of directors assumed cont
Jan 1, 1989
-
Fissure Vein Structures and Brecciation in the Upper Levels of the Broken Hills Epithermal Au/Ag Deposit, Hauraki Goldfield, New Zealand
By J L. Mauk
Broken Hills is an adularia-sericite epithermal Au-Ag deposit, hosted in flow-banded rhyolites and overlying rhyolitic pyroclastic rocks in the eastern Hauraki Goldfield. The 7.1 Ma deposit was
Jan 1, 2005
-
An Example of the Use of Chemical Analyses in Evaluation of a Mineral Prospect
A numerical method for discriminating between replacement and sedimentary processes is applied to a folded stratiform sulphide occurrence. It is shown that numerical treatment of chemical analyses fro
Jan 1, 1973
-
Geological Controls on the Formation of Gold Rich Porphyry-Type Deposits
The geological features of the destructive plate margins of the southwest Pacific favour the formation of porphyry type deposits. The major controlling factor favouring the formation of gold-rich depo
Jan 1, 1995
-
Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite
Electrochemistry Measurement, Using Chena Analyser, to Investigate Selective Separation of Pentlandite and Pyrrhotite
Sep 13, 2010