Search Documents

  • CIM
    Stabilization of Lead and Zinc Flotation Circuits at Galmoy Mine, Kilkenny, Ireland

    By Paul Laframboise, Nigel MacDonald, Mike Hallewell, Robert Thorpe

    "Galmoy Mine, owned by Arcon Mines Limited, has operated since 1997, and is one of three operating lead/zinc mines in Ireland. Changes in ore type starting in mid 2002 created challenges to metallurgi

    Jan 1, 2005

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • AUSIMM
    Effect of Temperature on Removal of Phosphorus from Australian Goethitic Iron Ores

    By B M. Washington, R R. Lovel, G J. Sparrow, M J. Fisher-White

    "Work in CSIRO with several Australian ores has shown that?by heating a high-phosphorus goethitic iron ore and then leaching with caustic or acid, the phosphorus levels in the ore can be lowered to a

    Aug 12, 2013

  • NIOSH
    RI 7083 Liquidus Temperatures Of Titaniferous Slags (In Three Parts) 2. TiO2-Al2O3-FeO-SiO2-CaO-MgO

    By Wesley T. Holmes

    This report describes the second phase of an investigation aimed at obtaining a wider knowledge of the problems involved in smelting titaniferous magnetites. Liquidus temperature measurements were mad

    Jan 1, 1968

  • AUSIMM
    Some Aspects of Tailings Disposal

    By C J. Hogan

    Increasing demand for fine grinding to improve mineral liberation and metal recovery and the need for stricter control of the environmental impact of tailings deposition poses problems for tailings di

    Jan 1, 1993

  • AIME
    Geology of the Iron-Ore Deposits of the Firmeza District, Oriente Province, Cuba

    By Max Roesler

    I. INTRODUCTION THE following article concerns the geological occurrence of the iron-ore deposits on the south coast of Cuba. The article is based on a detailed field study, made in the hope that som

    Jan 10, 1916

  • ISEE
    Transition of the Seismograph from a Tool of Litigation to a Tool of Production Efficiency

    By David S. Bowling

    The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air

    Jan 1, 1990

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • AUSIMM
    Ore Grinding Energy Minimisation by Thermal Treatment

    By Dhar B. B, Gupta R. C

    Grinding of iron ore is an essential step to utilise ore fines for pelletisation needed for DRI units. While preparing iron ore pellets for DRI production, the iron ore needs extensive grinding whic

    Jan 1, 1999

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • NIOSH
    OFR-76-77 Investigation Of The Various Factors Affecting The Response Of Passive Configuration Track Etch Dosimeters To Working Level Hour Exposure In Radon And Radon Daughter Atmospheres

    By D. B. Lovett

    The work described in this report was directed toward identifying and devising methods to minimize the previously observed variability between working level hour exposures and the alpha particle track

    Jan 1, 1976

  • AUSIMM
    Solar Drying of Laterite Ores at QNI Yabulu Refinery

    This paper discusses the history and development of the system and the benefits that are being gained for Yabulu from Solar Drying. Following the end of mining of the local Greenvale and Brolga nickel

    Jan 1, 2003

  • NIOSH
    RI 3453 Relative Air Dustiness During Cycle Of Operations At Mount Weather Testing Adit ? Introduction (df2df58f-379d-486b-93fa-fed333849f65)

    By John A. Johnson

    For the purpose of comparing the amounts of dust produced by various mining operations, samples of atmospheric dust were collected during a complete cycle of drilling, blasting and mucking at or near

    Jan 1, 1939

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • AUSIMM
    Electricity û Demand and Supply Conservation and the Environment

    Conservation and environmental issues are raising their profile with respect to both demand restraint and electricity supply options. In New Zealand, conservation pressures and energy efficiency need

    Jan 1, 1990

  • SME
    Earthquake Response Of Caverns: Empirical Correlations And Numerical Modeling

    Tunnel damage from explosion and earthquake excitation is correlated with strain and particle motions. Critical strains and motions are then correlated with focal distance, which is so small that perm

    Jan 1, 1985

  • SME
    Numerical Evaluation of Tunnel Lining in Visco?elastic creep active ground

    By Kyoosang Yoo

    The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of

    Jan 1, 2010

  • SME
    An Analysis Of Recent MSHA Accident Datafor Underground Metal Mines Using Backfill

    By J. B. Seymour

    This paper provides an overview of the current use of backfill for ground support in underground metal mines in the United States and a summary of recent accident data reported for these mines by the

    Feb 27, 2013

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Presentation #4 - Reflections On Pile Integrity Testing

    By Joram M. Amir

    Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]

    Jan 1, 2001