Search Documents

  • AUSIMM
    Large-Scale Mining in Aboriginal Australia: Cultural Dispositions and Economic Aspirations in Indigenous Communities

    The paper considers Aboriginal responses to large-scale mining, including Indigenous attitudes towards land access for exploration and project development. The core question, in which I have been inte

    Jan 1, 2002

  • AIME
  • NIOSH
    RI 5953 Flotation Of Titanium Minerals From The Roseland Anorthosite, Near Roseland, Nelson County, Va. ? Summary

    By V. F. Swanson

    As part of the Bureau of Mines titanium resources examination program, samples of altered rock (saprolite) and unaltered rock from the Roseland anorthosite near Roseland, Nelson County, Va., were test

    Jan 1, 1962

  • AIME
  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • AIME
    Reservoir Engineering - General - Simplified Water Influx-Pressure Calculations Above the Bubble...

    By J. D. Rice, S. C. Pitzer, C. E. Thomas

    Interpretation of pressure build-up data obtained in the conventional manner has often been difficult because of the deviation from theoretical behavior. Major causes of this deviation have been attri

  • SME
    Brightwater East?A Case History

    By Luminita Calin

    King County (Seattle, WA) is on a monumental task of building the new Brightwater System complete with a new treatment plant, three main conveyance tunnels, a new outfall into Puget Sound and other an

  • DFI
    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • SAIMM
    Development Of A Novel Three-Step SX Process To Recover Copper From An Acidic Solution (VOLUME 105)

    By R. Minango

    Solvent extraction of Cu from acidic leach, using an oxime extractant, e.g. LIX 984 or Acorga is a well-known and establishedprocess. As the process advances, Cu is extracted to the solvent and is r

    Jan 1, 2005

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • SME
    Rehabilitation of a Brick-Lined Aqueduct

    By Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick

    BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006

    Jan 1, 2007

  • SME
    Characterization Of Hydrothermally Dried Low-Rank Coals – Preprint 97-75

    By O. Noirot, H. C. Owens, P. D. Rao, D. E. Walsh, J. R. Mokka

    Over a period of seven years (1989-1996) the Mineral Industry Research Laboratory (MIRL) University of Alaska Fairbanks, has investigated the effects of temperature, residence time, and particle size

    Feb 24, 1997

  • SAIMM
    Seismic Wave Propagation To Diagnose The State Of Fracturing

    By M. W. Hildyard

    The aim of this paper is to demonstrate that active seismic measurements could have an impact in helping solve rock engineering problems experienced in the South African mining industry. The paper pre

    Jan 1, 2005

  • NIOSH
    RI 3068 Flotation Tests on Converter Slag

    By Frank S. Wartman

    "The experimental flotation work described in this paper was undertaken to test the conclusions derived from a previous microscopic and chemical study of several samples of converter slag. That study3

    Apr 1, 1931

  • SME
    Characterization Of The Berkeley Pitlake I: Surface Waters

    By M. Bennett, L. Twidwell

    Montana Tech has embarked on a coordinated series of studies to delineate the characteristics of the Berkeley Pitlake containing over 36 billion gallons of acidic, metal-contaminated water formed afte

    Jan 1, 2007

  • SAIMM
    Mineral Property Valuation In South Africa: A Basket Of Assets And Legal Rights To Consider

    By F. T. Cawood

    The distinction between real estate ownership and that of interests in the property is fundamental to the appraisal of mineral properties. This distinction affects the nature and understanding of secu

    Jan 1, 2004

  • AUSIMM
    Rock Mass Excavatability Assessment for the Proposed Open Pit Mine at Globe-Progress, Near Reefton

    The excavatability of the rock mass in a proposed open pit mine at Globe-Progress has been assessed. The rock mass was initially evaluated by determining variations in seismic velocity and by using th

    Jan 1, 1996

  • AUSIMM
    The Structure of the Rosebery Ore Deposit, Tasmania

    The pyrite-sphalerite-galena and barite orebodies at the Rosebery mine are concordant with the shale host rock and have been deformed into one system of folds with an associated axial plane cleavage.

    Jan 1, 1972

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • AIME
    Part IX - Papers - Metallothermic Reduction of Oxides in Water-Cooled Copper Furnaces

    By Fred H. Perfect

    The thermite process, now approximately 80 years old, has heretofore been practiced in ceramic vessels. This paper outlines the successful production of several million pounds of alloy produced in zua

    Jan 1, 1968