Search Documents

  • SME
    Possibilities of utilizing mineral wastes in Hungary

    By I. Gombköto, J. Bohm

    "In Europe, and therefore in Hungary opening a new mine is harder and harder. Depletion of mines, unfavourable legal and economic changes, and growing public concerns are the main reasons. Social and

    Jan 1, 2011

  • SME
    The Application Of Geotechnical Monitoring To Stability Evaluation And Mine Design

    By H. Maleki

    In this paper, long-term measurements in five underground mines are presented to demonstrate how these measurements can be applied to stability evaluations and design of underground excavations. These

    Jan 1, 2002

  • DFI
    Combined Loading Tests On Large Diameter Piles

    By A. Lyndon

    Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t

    Jan 1, 1989

  • SME
    Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine Drainage

    By M. Nehdi

    Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati

    Jan 1, 2008

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • AUSIMM
    An Example of the Use of Chemical Analyses in Evaluation of a Mineral Prospect

    A numerical method for discriminating between replacement and sedimentary processes is applied to a folded stratiform sulphide occurrence. It is shown that numerical treatment of chemical analyses fro

    Jan 1, 1973

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • SME
    Use Of High Efficiency Electrical Submersible Pumps For Large Scale Mine Dewatering

    By K. Lang

    A case study is provided that highlights the successful use of high efficiency electrical submersible pumps (ESPs) adapted from the oil and gas industry for a large scale, open pit mine dewatering

    Feb 27, 2013

  • AUSIMM
    Origin of the "Jasper Bars" of Western Australia

    The notes from which this paper has been prepared were set down at the time of the author's departure from Australia in 1935. Mr. Frank Forman, Government Geologist of Western Australia, who has

    Jan 1, 1939

  • CIM
    The Niobec Mill

    By Michel Robert

    "In 1974, Copperfields Mining Corporation and Soquem formed a new company, Niobec Inc, to bring the niobium deposit of the St-Honore carbonatite into production.St-Honore is located in the Saguenay ar

    Jan 1, 1978

  • SAIMM
    Forecasting of self heating of coal in underground workings

    By J. Cygankiewicz

    Efficient prevention of mine fires is impossible without predicting the self heating processes in the given geological and mining conditions. The respective forecasting method is presented in this pa

    Jan 1, 2003

  • AUSIMM
    The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation system

    By S J. Loach

    Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-

    Jul 24, 2017

  • SME
    Thinking Outside The Box- New Ways To Close Old Tailing Basins

    By B. Anderson, P. Churak, S. Dewar, A. Johnson, P. Eger

    Although vegetation can be successfully established on fine taconite tailings, innovative approaches are needed to reclaim the coarse tailings used for dam construction. Through a series of cooperati

    Jan 1, 2002

  • SME
    New Developments In Flow And Pipe Management Capabilities Through New Velocity Profile Measurement And Pipe Wall Wear Monitoring Instrumentation - Preprint 09-006

    New developments in the non-invasive and real-time measurement of the velocity profile of slurry flow in horizontal pipes will be described. This information can be used to determine the approach and

    Jan 1, 2009

  • SAIMM
    Environmental Considerations In The Preparation Of Bankable Feasibility Documents - Introduction

    By A. A. Smithen

    There is an increasing awareness of the importance of including an assessment of environmental liabilities in the preparation of bankable feasibility documents. This means that environmental assessmen

    Jan 1, 1999

  • SAIMM
    Longwalling At Great Depth In A Geologically Disturbed Environment - The Way Forward

    By F. Russo-Bello

    TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below

    Jan 1, 2000

  • CIM
    Flotation Kinetic Studies -Going from Laboratory to the Plant

    By Richard Klimpel

    "Over the last 15 years, there has been a number of plant scale sulfide mineral flotation tests organized by this author specifically aimed at understanding how flotation rate varies with reagent type

    Jan 1, 1997

  • IIMP
    Computer application on exploration from project generation to the consolidation of a mining projects

    By Rogerio Castejón

    The evolution on the computer in the last 10 years have caused a big change on the way the mining companies are doing exploration. The following factors have contributed to that change: the downgrade

    Aug 25, 2002

  • AIME
    Geophysics and Geochemistry - Quantitative Distribution of Major and Trace Components in Rock Masses

    By E. H. T. Whitten

    Fundamental principles of trend surface analysis are briefly reviewed. Recent analyses of several granite masses illustrate the method of estimating the quantitative regional composition and also vari

    Jan 1, 1961

  • SAIMM
    The Importance Of Both Geological Structures And Mining Induced Stress Fractures On The Hangingwall Stability In A Deep Level Gold Mine

    By G. B. Quaye

    The deep level gold mining environment is characterized by high stresses that give rise to intense mining induced fracturing of the rock mass surrounding the stopes. In a geologically disturbed region

    Jan 1, 1998