Slurry Transportation û Recent ApplicationsBy S Lush, R Polglase
McConnell Dowell is pleased to be given the opportunity to present two papers to this conference. The first is a general discussion paper on our work in the field of slurry transportation. The se
Jan 1, 1986
-
RI 3165 Re-Treatment of Fine Washed Coal from the Black Creek and Mary Lee Beds on Coal Washing TablesBy R. Q. Shotts, H. J. Hager, A. C. Richardson, G. D. Coe
"INTRODUCTION In the State of Alabama few mines produce coal clean enough to be marketed directly without being washed. This is particularly true where the coal is to be used for the production of met
Apr 1, 1932
-
The activation of magnesia in serpentine by calcination and the chemical utilization of asbestos tailings-a reviewBy R. Le Houillier, M. Nagamori, A. J. Plumpton
"Asbestos tailings are a typical serpentine, hydrated magnesium silicate, consisting primarily of antigorite and a few per cent of unrecovered fibrous chrysotile. Serpentine has unique thermal propert
Jan 1, 1980
-
A Cubanite-Rich Sulphide Ore Associated with Ultramafic Rocks Near Tumut, N.S.W.The mineral composition and microtextures of a cubanite-rich sulphide ore are described and cubanite breakdown textures are illustrated. The occurrence of cubanite in macroscopic dimensions is feature
Jan 1, 1969
-
Contributed Discussion "Instantaneous Outbursts of Coal and Gas - A Review" by Alan J. Hangraves ( Proceeding No. 285, March. 1983)By Rixon K. L
Hargraves (1983) has reviewed the phenomenon of instantaneous outbursts of coal and gas with special attention to Australian occurrences. The purpose of this discussion is to highlight some problems a
Jan 1, 1983
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Expert Mill Control At AngloGold AshantiBy W. I. van Drunick
AngloGold Ashanti Metallurgy has recently been involved in the successful installation of intelligent, expert control systems on the milling circuits. The benefits of expert systems in these highly in
Jan 1, 2005
-
Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for SafetyBy G Baiden
The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them
May 9, 2016
-
Modeling of plastic deformation and damage due to drying around a shaft in claystoneBy J. F. Shao, G. Duveau, W. Z. Chen, O. Ozanam
In this paper, we present a sensitivity study for the numerical modelling of hydromechanical coupling around a shaft in partially saturated claystone. Two representative constitutive models have been
Jan 1, 2003
-
Herramientas tecnológicas del geólogo en Mina PierinaBy Enrique Garay
Actualmente el geólogo de mina toma información rutinaria, mapea los bancos de la mina, los taladros para voladura y loguea los núcleos de perforación y fragmentos del aire reverso. Para la localizaci
Aug 25, 2002
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
New York Paper - Wire Rope and Safety in Hoisting at Butte Mines (with Discussion)By W. N. Tanner
The wire-rope hoisting conditions at the mines of the Anaconda Coppcr Mining Co. in Butte, Mont, are very severe because of the conditions under which it is necessary to operate. A study was made, in
Jan 1, 1923
-
New York Paper - Wire Rope and Safety in Hoisting at Butte Mines (with Discussion)By W. N. Tanner
The wire-rope hoisting conditions at the mines of the Anaconda Coppcr Mining Co. in Butte, Mont, are very severe because of the conditions under which it is necessary to operate. A study was made, in
Jan 1, 1923
-
Enhancing magnetite concentrate granulation by blending with hematite oreBy J Addai-Mensah, M Adam, W Skinner, J Begelhole, K Quast
Granulation of iron ore fines into robust granules is critical to successful sintering and blast furnace operations in iron and steelmaking. Iron and steelmakers desire iron ore granules with high str
Jul 24, 2017
-
Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial TillBy Cassandra A. Wetzel
Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
-
Rich Hill, Arizona: Historic Gold District, Modern Gold RushBy Erik Melchiorre, M. Katherine Crombie, Dante Lauretta, Chris Gholson
Rich Hill, also known as Weaver District No. 2, is among the most productive placer gold locations in Arizona. Located near Congress, AZ (Fig. 1), this district hosted major placer rushes in the 1860
Jan 1, 2003
-
Optimization Of Shovel Dipper-Formation Interactions In ExcavationBy S. Frimpong
Shovel excavation constitutes a significant component of production costs in any surface mining operation. This makes shovel loading an important cost center that needs to be improved to lower product
Jan 1, 2011
-
Alluvial Gold Deposits and Mining Opportunities on the West Coast, South IslandBy P M. Hancock
The West Coast contains one of the world's giant placer gold deposits with production since the 1860s totalling some six million ounces (present day value NZ$ 3.6 billion). The deposits have been
Jan 1, 1985
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Non-Linear Analysis Of Large Pile Groups For The New Wembley StadiumBy S. Hardy
The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu
Jan 1, 2006