Search Documents

  • CIM
    Characterization of Reference Gold Catalysts

    By Susumu Tsubota

    Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by

    Oct 1, 2003

  • TMS
    Observations On Blister Copper Spitting

    By Melissa L. Trapani

    Keywords: Copper, Taphole, Flow Instability. ?Blister spitting? is a flow irregularity where the molten blister copper stream ? or part thereof ? sprays from the taphole exit rather than following

    Jan 1, 2005

  • SME
    Expediting the Environmental Planning Process for Small Mine Permit Applications

    By Gary J. Fletcher

    Mining and processing activities which are proposed on private land, state leases, or unpatented mining claims are governed by numerous local, state, and federal laws which identify the procedures and

    Jan 1, 1987

  • SME
    Loss Prevention In The Processing Of High Value Materials - Introduction

    By A. G. Taylor

    High value materials, such as gold, platinum and other precious metals are subject to loss through unauthorized removal from mines, smelters, refiners, and other places where such materials are proces

    Jan 1, 2012

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • AIME
    Members, Junior Members, Associates and Junior Associates Alphabetical (cfff16e3-1bfc-44dd-98ba-257a72147d3d)

    Aamot, Olav Crone, Chem. Engr., Norsk Elektrokemisk, Kongensgt. 18, Oslo, Norway. '29 Abbott, Clarence E., V.P., Charge of Raw Materials, Tennessee Coal, Iron & R. R. Co., 1242 Brown-Marx Bldg.

    Jan 1, 1937

  • AUSIMM
    Sustainable Integrated Management System æSIMSÆ

    By R Miller, D Hawcroft

    The business environment is never still and there has been enormous change in demand, technology and opportunity during the last decade. In order to succeed it is necessary for organisations to change

    Jan 1, 2000

  • CIM
    Hangingwall sloughing mechanism in open stope mining

    By J. Ran

    "Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil

    Jan 1, 2002

  • AIME
    Story of the Organization of the Federated American Engineering Societies

    By AIME AIME

    THE outstanding event of the past month has been the conference in Washington of the representatives of about seventy-five of the leading national, regional and local engineering and allied technical

    Jan 1, 1920

  • AIME
    Application Of Electron Microscope To Study Of Aluminum Alloys

    By F. Keller, A. H. Geisler

    Some of the important changes that take place in the structure of aluminum alloys are largely submicroscopic in character. This is especially true of the changes that accompany age-hardening and recry

    Jan 1, 1944

  • SME
    Technology News – Rasmussen Ridge Phosphate Mine Wins Idaho Reclamation Award

    The Rasmussen Ridge phosphate mine is owned by Agrium CPO and operated by a unit of Washington Group International. The mine, located in southeastern Idaho, received the Idaho Inter-Agency Reclamatio

    Jan 1, 2005

  • SAIMM
    Annual General Meeting of the Institute

    The Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 22nd August, 1979. Dr M. G. Atmore (President) was in the chair and declare

    Jan 1, 1979

  • AIME
    Membership (d530499b-472e-417c-853c-a6359b87c50b)

    NEW MEMBERS The following list comprises the names of those persons who became members during the period Jan. 10, 1919, to Feb. 10, 1919. ADAMS, FRANCIS SPEARMAN, Supt., Power Dept., Anaconda Copp

    Jan 3, 1919

  • AIME
    Caving Methods - An Experimental Study of Caving and Drawing Large Ore Bodies

    By F. S. McNicholas, M. S. Walker, V. C. Rogers

    During the year of 1944 and the first half of 1945, the Climax Molybdenum Co. made a study of some of the problems in block and panel caving, with the use of a scale model. The experiments dealt es

    Jan 1, 1946

  • NIOSH
    OFR-15-75 The Application Of Polymers For Rock Bonding And Reinforcement Of Coal Mine Structures ? 1. Introduction

    By R. A. V. Raff

    Although falls of roof, face and rib (or side) of coal mines were the third ranking cause of disabling accidents in 1966, the accidents from these falls resulted in the most serious injuries and accou

    Jan 1, 1973

  • AIME
    PART VI - Communications - Note on Solute Profiles in Front of Moving Grain Boundaries

    By W. C. Winegard, C. J. Beinjessner

    PREVIOUS investigations 1,2 of Fe3P described by pearson3 and schubert4 show that Fe3P has a bct unit cell having four Fe3P tetrahedra centered around each lattice point. The space group is 14, No. 82

    Jan 1, 1968

  • CIM
    Canada's coal resources and reserves: an overview

    By H. G. Rushton, A. S. Romaniuk

    "The opening chapter of this volume, by A. Ignatieff, places in perspective Canada's coal resource base as part of the world scene. This chapter will focus on the Canadian scene.Units of measurement i

    Jan 1, 1985

  • AIME
  • NIOSH
    IC 7714 Frost-Control Practices And The Prospective Use Of Atnthracite ? Summary And Conclusions

    By J. D. Clendenin

    Systematic practices for protecting crops from frost damage began in the United Metes more then 40 years ago when the Weather Bureau Fruit-Frost Warning Service was organized; however, various practic

    Jan 1, 1955

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001