Search Documents

  • SME-ICGCM
    Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland

    By Andrew P. Schissler

    The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan

    Jan 1, 2012

  • SAIMM
    An investigation of mechanisms involved in backfill-rock mass behaviour in narrow vein mining - Synopsis

    By F. P. Hassani

    Today, mine backfilling has become an integral part of mining operations, both from a local and overall ground control point of view, and as regards mining techniques and environmental considerations.

    Jan 1, 2008

  • SME
    Exploratory Shaft Design For The Salt Repository Project

    By S. A. G. Poppen, M. B. Mirza, A. I. Cooley

    The U.S. Department of Energy (DOE) is responsible for siting and constructing a licensed geologic repository for commercially generated high-level nuclear waste. Within DOE, the Office of Civilian Ra

    Jan 1, 1987

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • AUSIMM
    Determination of Porosity and its Influence on Specific Surface

    Determination of Porosity and its Influence on Specific Surface

    Sep 13, 2010

  • DFI
    Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil

    By Sangseom Jeong, Moonkyung Chung, Junyoung Ko

    "Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze

    Jan 1, 2014

  • AUSIMM
    Gold Financing and the Title to Gold: Gold Loans, Gold Coins and Goldcorp

    The principal source of funding the working capital requirements of gold miners has traditionally been equity. However in the 1980s, with a substantial increase in activity in the exploration for, and

    Jan 1, 1994

  • AUSIMM
    Optical image analysis of iron ore pellets and lumps using CSIRO software Mineral/Recognition

    By S Hapugoda, A Poliakov, E Donskoi, L Lu

    A significant amount of metallic iron in the world is produced in blast furnaces from iron ore pellets. To control the quality of pellets and to optimise pellet production, characterisation of both gr

    Jul 24, 2017

  • AUSIMM
    A Convenient Method for Survey of Stopes and Development

    THE most important part of the routine survey work on a mine is the keeping up-to-date of plans and sections showing progress of stoping and development work, and the direction of the latter for the p

    Jan 1, 1928

  • SAIMM
    Non-Linear System Identification Of An Autocatalytic Reactor Using Least Squares Support Vector Machines

    Paper written on project work carried out in partial fulfilment of B.Sc. Eng. (Extractive Metallurgy)degree The concepts behind support vector machines are very interesting both in theory and in pr

    Jan 1, 2003

  • AIME
    The Control Of Chill In Cast Iron. Considering The Elements Effective In The Manufacture Of Malleable Castings And Chilled Car Wheels

    By Grafton Thrasher

    For the proper discussion of this subject it is necessary to incorporate in this paper the substance of part of an article published by rite in Metallurgical and Chemical Engineering for January, 1915

    Jan 10, 1915

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • RMCMI
  • SAIMM
    Melting And Densification Of Electrode Paste Briquettes In Søderberg Electrodes

    By B. Larsen, S. Z. Nascimento, K. Fidje, J. P. M. Amaro, H. Gran

    Safe and good operation of Søderberg electrodes is dependent upon high quality electrode paste coupled with correct electrode operating procedures. Good electrode performance depends further on proper

    Jan 1, 2004

  • AUSIMM
    Using Mineral Maps to Rank Potential Processing Behaviour

    Using Mineral Maps to Rank Potential Processing Behaviour

    Sep 13, 2010

  • AUSIMM
    Development of Environmental Management Systems in the Mining Industry

    Various influences determine how an Environmental Management System (EMS) for a mining or petroleum project is developed and administered. These influences include the environmental and resource legis

    Jan 1, 1995

  • SAIMM
    The Performance Of Centrifugal Pumps When Pumping Ultra-Viscous Paste Slurries - Synopsis

    Significant advances have been made in the design of centrifugal slurry pumps that are used for pumping high-density viscous and paste slurries. This paper presents the results of a series of centrifu

    Jan 1, 2012

  • ISEE
    Development of a Wireless Sensor Network for Blast Monitoring and Slope Stability

    By Johnny Lyons-Baral, John Kemeny, Don Kraemer

    Ground vibrations from blasting can result in the degradation and failure of rock and soil exposures, as well as damaging neighboring houses and buildings. At the same time, vibration provides an oppo

    Jan 1, 2014

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • CIM
    The Lonmin Floatability Characterization Test Rig (FCTR) experience

    By E. V. Manlapig, K. R. Rahal, J-P Franzidis

    "The Floatability Characterisation Test Rig or FCTR is a highly instrumented, mobile flotation pilot plant built by Baker Process (now EIMCO) for the AMIRA P9 Project for use in flotation plant modell

    Jan 1, 2002