Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rate Control Mechanism In Solid State Decarburization Of FerromanganeseBy P. J. Bhonde, R. D. Angal
Conventionally low carbon ferromanganese is manufactured globally by refining high carbon ferromanganese in liquid state. This process is an expensive and lengthy technique. Hence, the present work wa
Jan 1, 2004
-
A Case Study Application Of Linear Programming And Simulation To Mine Planning - SynopsisBy J. A. de Carvalho Junior
This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod
Jan 1, 2012
-
Economics of Buffer Blasting in Surface Mineral Mines-Minimizing Ore Waste and DilutionBy Dale S. Preece, J Paul Tidman, Stephen H. Chung
A discrete element computer program named DMC-BLAST (Distinct Motion code) has been under development since. 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employs explicit time
Jan 1, 1998
-
OFR-56-80 Characterization Of Respirable Coal Mine Dust Computer Analysis Of Scanning Electron Microscope ImagesBy Gerald G. Johnson
The use of the Scanning Electron Microscope to characterize Coal Mine Dust has been possible because of two circumstances. First, the imaging process of the SEM allows multiple signals (secondary elec
Jan 1, 1979
-
Acoustic Estimation Of The Particle Size Distributions Of Sulphide Ores In A Laboratory Ball MillThe acoustic signals emitted from a laboratory-scale ball mill were used for the estimation of the comminution of two complex sulphide ores, viz. Merensky and UG2 ores from the Bushveld Igneous Comple
Jan 1, 2000
-
Realismm, A Virtual Reality in Rational Managerial Decision MakingRational decision making is generally perceived by managers of operations to be a delicate process of committing large sums of money and putting other people's life at risk. Consequently most man
Jan 1, 1993
-
Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage PreventionBy Fritz Grübl
Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.
Jan 1, 2001
-
Ground Freezing Under the Most Adverse Conditions: Moving GroundwaterBy Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin
Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result
Jan 1, 2007
-
An Investigation on the Effect of the Ore Particle Size on the Efficiency of Sarcheshmeh Copper Mine Crushing UnitBy Mohsen Amir-Rahmat
The ore of Sarcheshmeh copper deposit that has been located in the south ?east of Iran, contains four type of rock that they have their specific hardness and strength according to their alteration typ
May 1, 2003
-
RI 8250 Splice Flexure Performance Factors in Shuttle Car Trailing CablesBy George J. Conroy
To provide data as a basis for proposed acceptance standards and procedures covering permanent splices in trailing cables, the Bureau of Mines conducted testing programs on the flexure life in flat ty
Jan 1, 1977
-
Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing ProblemBy Marcel M. Djivre
Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been
May 1, 2004
-
Co-Dependencies in Copper: Production, Price and Innovation Trends 1900–2018By Andrew Bamber
Between the early 20th Century and the present, the production of mined copper ore has increased from tens of millions of tonnes per annum to several billion tonnes per annum, an unprecedented increas
Jan 1, 2019
-
Shaft construction at the Gold Fields Wallaby mineBy J Graaf, R A. Murrell
Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate
Oct 16, 2017
-
Tunneling for the Chaloem Ratchamongkhon Line in BangkokBy S. Suwansawat, D. J. Maconochie, C. C. Chang
This paper describes the overall delivery of the tunneling for the Mass Rapid Transit Authority of Thailand’s Chaloem Ratchamongkhon Line in Bangkok and the constraints provided by the alignment. Eigh
Jan 1, 2001
-
Industrial Minerals 2004 - BariteBy P. Mills
The four top barite-producing countries in the world are China, India, Morocco and the United States. China is currently the largest exporter of barite followed by India. More than 95 percent of th
Jan 1, 2005
-
Lead Dissolution from Lead Smelter Slags using Magnesium Chloride SolutionsBy I Halikia, T Lilis
Lead smelter slags, produced during the last century in quantities ofmillions of tonnes at Lavrion, Greece, have recently been used in theconstruction of Lavrion harbour. In order to evaluate the geoc
Jan 1, 1999
-
An Analysis of Dragline Applications and Performances in Deep Stripping ConditionsBy Richard Curtis
Optimum Colliery is presently experiencing a shortfall of stripping capacity in order to meet its production requirements. Due to the long dragline procurement times, several alternative stripping met
Jan 1, 1990
-
25 Years of Base Metal ProcessingBy H. P. Jacobi
"The last 25 years have seen tremendous economic pressure placed upon the base metal processor. Industry has responded with technological innovations that have contributed to significant reductions in
Jan 1, 1987
-
Corrosion Mechanism And Kinetic Behaviour Of Refractory Materials In Contact With CaO-Al2O3-MgO-SiO2 SlagsBy V. Brabie, S. Jansson, L. Bohlin
The rate of dissolution of solid MgO-C and doloma into liquid in CaO-Al2O3-SiO2-MgO slag at different temperatures was studied under conditions of forced convection by rotating cylindrical refractory
Jan 1, 2004
-
BWARI Tunneling UnderwayBy Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005