Search Documents

  • TMS
    Carbon-thermal Reduction Process for making Al-Si Alloys from Al2O3-SiO2 Containing Industrial Wastes

    By Jilai Xue

    Industrial wastes containing 30-50 wt.% Al2O3 and 40-60 wt.% SiO2 may serve as an alternative resource for producing Al-Si alloys. Various raw materials such as used refractory materials from metallur

    Jan 1, 2010

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • SME
    Mineralogical And Microscopic Evaluation Of Coarse Taconite Tailings From Minnesota Taconite Operations

    By Lawrence M. Zanko

    Eighteen coarse taconite tailings samples were collected in 2000-2001 from five western Mesabi Range taconite (iron ore) operations located in northern Minnesota, i.e., EVTAC, Hibbing Taconite (Hibtac

    Jan 1, 2007

  • AUSIMM
    Structural Setting of the Empire Vein System of the Golden Cross Deposit, New Zealand

    By M J. Begbie, K B. Sporle

    The Golden Cross low sulfidation epithermal deposit produced approximately 750,000 ounces of Au from two ore zones: the underground Empire Vein System and the open pit stockwork. The Empire Vein Syste

    Jan 1, 1998

  • AUSIMM
    The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR

    By A Hoyle, P Walker, D Bennett

    The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent

    Sep 7, 2015

  • NIOSH
    RI 4436 Investigation Of Boiling Springs Manganese-Iron Deposits Cumberland County, Pa.

    By S. E. Burton

    The White Rock area of the Boiling Springs manganese-iron deposits comprises about 3,200 acres of land in Monroe Township, Cumberland County, Pa. (See fig. 1.) This property was brought to the: atte

    Jan 1, 1949

  • IOM3
    Spanish roofing slate deposits

    By M. Lombardero, J. Garcia-Guinea, J. Taboada, B. W. Roberts

    The structural, textural and mineralogical properties of the slate formations of NW Spain make it the most important district in the world for quarrying roofing slates. Over the past 10 years the intr

    Jun 19, 1905

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • AUSIMM
    Some Notes on Dry Crushing.

    The sphere of operations of dry crushing has been so much enlarged of late years that the following notes with reference to its advantages and limitations, and also some practical results in connectio

  • NIOSH
    Visualization Of Multi-Digit Manipulation Mechanics - Introduction

    By Shouchen Dun, Zong-Ming Li

    Manipulation of hand-held objects in 3D space is a complex task. Understanding how individual digits interact with a hand-held object provides helpful information for hand tool designers, researchers,

    Jan 6, 2006

  • SME
    Weinbach Soft Ground Tunnel: Lessons Learned

    By Raymond W. Henn, Kent A. Pease, Glen J. Rorison

    The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to

    Jan 1, 2001

  • SME
    Reducing Emissions Through The Use Of A Fuel Borne Combustion Catalyst

    By R. Curtis

    To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a

    Feb 27, 2013

  • AUSIMM
    Copper Mineralization in the Lachlan Geosyncline, New South Wales

    Copper ores are widespread through the Lachlan Geosyncline in New South Wales, but the size of the orebodies is generally small. The largest deposits occur in the Cobar district where an iron-rich cop

    Jan 1, 1970

  • SAIMM
    Numerical simulation of multiphase flow in a Vanyukov furnace

    By Y. M. Chen, H. L. Zhang, W. U. Bing, C. Q. Zhou

    Multiphase flow in the widely used Vanyukov furnace was numerically studied. An unsteady three-dimensional and three-phase flow model was firstly built using the computational fluid dynamics (CFD) sof

    Jan 1, 2015

  • DFI
    A Need To Reevaluate Attitudes In Engineering And Construction

    By d&apos, E. Appolonia

    A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Con­tractors, engineers, suppliers and equipment developers

    Jan 1, 1985

  • AUSIMM
    Presidential Address (8fa799da-72ad-450c-992f-fd16f30a89df)

    This evening I intend to explain the position of the gold mining industry in the light of post war trends and events.I propose initially to comment on gold production throughout the World and then pro

    Jan 1, 1964

  • SME
    Tailings Dam Failure at Omai in Guyana

    By Steven G. Vick

    Effects of the August 1995 failure of the Omai tailings dam in Guyana continue to be felt throughout the mining industry. This article is taken from the final report of the independent body of expert

    Jan 1, 1996

  • CIM
    Pneumatic Flotation Technology an Interesting Experience in the Chilean Mining Industry

    By Flavio Rojos-Tapia, Samuel Sánchez-Pino, Marcelo Fernández-García, Samuel Sánchez-Baquedano, Rainer M. Imhof

    "Pneumatic flotation was introduced to the Chilean copper mining industry in 1993 by Ingeniería de Minerales S.A., being implementation in 1994/95. The technology is based on the designs and developme

    Jan 1, 2003

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018