Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997
-
Measurement Of Structural Deformation And Tilt During SubsidenceBy Revendra Awasthi
The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi
Jan 1, 1990
-
Evaluation of Instrumented Cable and Rebar Bolts as Ground Support at a Trona Mine (958ba3b7-4ed1-4b81-9815-5e4d6ebd9ea2)By Lewis A. Martin
Instrumented cable bolts developed at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health were used in conjunction with existing ground control systems to moni
Jan 1, 2001
-
Regional Joint Patterns in the Appalachian Basin: Implications for Ground Control and Origin of "Hill Seams"By Sandin Phillipson
During the course of ground control evaluations conducted by the Mine Safety and Health Administration's Roof Control Division, a number of surface and underground coal mines were visited that exhibit
Jan 1, 2010
-
Computerised Subsidence And Displacement Prediction Using Influence Function MethodsA computerised influence function approach to subsidence and horizontal displacement prediction is described, with particular emphasis being placed on the applicability of the method to irregular- sha
Jan 1, 1988
-
Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)By N. P. Kripakov
This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel
Jan 1, 1992
-
Stress And Stability In Coal Ribsides And PillarsBy A. H. PH. D Wilson
Compared to the rocks encountered in, say, metalliferous mining or tunnel drivage in igneous and metamorphic rocks, the strata associated with the coal measures are relatively soft. If excavations are
Jan 1, 1981
-
Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock BoltsBy Clare Offner
In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r
Jan 1, 2000
-
Crosshole Seismics: Applications In MiningBy Richard E. Thill
Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq
Jan 1, 1989
-
Yield Pillar Applications--Impact On Strata Control And Coal ProductionThis paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Application of Highwall Mining System at Surface Coal Mine in ThailandBy Takashi Sasaoka, Pinyo Meechumna, Hiroshi Takamoto, Pipat Laowattanabandit, Akihiro Hamanaka, Kikuo Matsui, Hideki Shimada
"The EGAT Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 million tons of lignite annually to generate 2,400 mw of electricity. The surface mine pit covers is 4 by 7 km (
Jan 1, 2010
-
Single Point And Full Scale Laboratory Testing Of Timber Chock ConstructionBy Jim Galvin
4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri
Jan 1, 2000
-
Evaluation Of Mobile Roof Support TechnologiesBy Hamid Maleki
This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l
Jan 1, 2001
-
Void Fill and Support Techniques to Stabilize Drift Excavated Through a Transition Zone Mined By a TBM at the Stillwater MineBy Josh Johnson, Stephen Tadolini, Mark Ferster, Curt Jacobs
"Stillwater Mining Company is the only U.S. producer of platinum group metals (PGMs) and the largest producer outside of South Africa and Russia. The Company controls a considerable portion of the J-M
Jan 1, 2016
-
A Critical Study of Strata Behaviour During Extraction of Pillars in a Thick Coal SeamBy S. Jayanthu
This paper presents analysis of strata behaviour with special reference to convergence and stress variation during an experimental trial of extraction of pillars with cable bolts as major support syst
Jan 1, 1998
-
Practical Stress Modeling for Mine PlanningBy Keith Heasley
As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines
Jan 1, 1998
-
A Model Of Shield-Strata Interaction And Its Implications For Active Shield Setting RequirementsBy Thomas M. Baraak
This paper evaluates factors which influence longwall support and strata interaction. The longwall system is composed of an immediate and main roof structure and three supporting foundations: 1) longw
Jan 1, 1990
-
An Approach To Identifying Geological Properties From Roof Bolter Drilling ParametersBy Gerald I. Finfinger
Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.
Jan 1, 2000
-
Development Of A Remote Reading Dual-Height Telltale System For Monitoring Mine Roof DeformationBy David Bigby
A remote reading dual height telltale system has been developed to provide mine management with early warning of impending roof failure. This system is a logical development from the visual dual heigh
Jan 1, 2001
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof ControlBy Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981