Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Value Creation Through Strategic Mine Planning and Cutoff Grade OptimizationThe OptiPit® software program is developed based on expertise gained at the Colorado School of Mines (CSM) using Mixed Integer Linear Programming (MILP) techniques. This program has been developed to
Jan 1, 2007
-
Western Australia stamp batteries are operating museums of mining historyBy Richard Addison
Introduction A staccato beat rings out across the Australian bush. The stamps are at work, slowly pulverizing gold-bearing ore for a patient, grizzled prospector. This is the State Battery near Ma
Jan 7, 1986
-
Artificial neural networks to determine ventilation emissions and optimum degasification strategies for longwall minesIn longwall mining, premining prediction of methane emission rate depends on a number of geological factors, geographical factors, and operational factors. These same factors also can impact the selec
Jan 1, 2009
-
The Pit Falls Of Benchmarking And How To Avoid ThemBy K. Hanson
When done properly, benchmarking is an extremely effective tool for assessing ones performance, finding areas for improvement, and identifying strengths. However, when done improperly it can be an ex
Jan 1, 2011
-
Using Ultrasonic Anemometers To Evaluate Face Ventilation Conditions (37675a23-4c90-488d-92b2-7c8afee459e6)By J. Chilton
The fact that methane ignitions continue to occur at the mining face indicates that monitoring with machine-mounted methanometers does not always indicate the presence of high methane concentrations.
Jan 1, 2007
-
Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385By V. Rajaram
R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou
Jan 10, 1986
-
Development of a tool for assessing the environmental sustainability of mining facilitiesBy G. Gaidajis, K. Angelakoglou
The development of a tool for assessing the environmental sustainability of mining facilities is described in this study. The tool is based on the analysis of basic components of the examined system,
Jan 1, 2011
-
The Development Of Ultra Fine Grinding At KCGMIn February 2001, Kalgoorlie Consolidated Gold Mines (KCGM) commissioned its first full-scale ultra fine grinding (UFG) plant to supplement existing roaster concentrate treatment capacity. This proces
Jan 1, 2002
-
Measurements At A State Of The Art 2 X 5 Mw Dual Pinion Mill DriveBy M. Rufli
Until not so long ago most ring geared mills were operated with fix speed motors only. By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve t
Jan 1, 2011
-
Manufacturers Should Strive for Quality, Cost Effectiveness to Boost ProductivityBy A. Fred Gelding
Introduction In preparing this paper considerable time was spent attempting to find some upbeat data about the mining industry, so those of us in the field could feel somewhat better about future pro
Jan 11, 1983
-
Latest Information on Underground Construction Presented at 2006 NATBy William R. Yernberg
The 2006 North American Tunneling (NAT) Conference was held June 10-15, 2006, in Chicago, IL. The biennial conference was the first NAT conference by the newly formed Underground Construction Associat
Jan 1, 2006
-
Linear Behavior Of Rock Joints In Uniaxial Joint Compression TestsBy D. Nutakor
Rock joint stiffness is not only a poorly known parameter, but also has no established laboratory measurement procedure. This paper presents methods used to determine the normal and shear stiffnesses
Jan 1, 2008
-
Using Dynamic Anisotropy To Improve Resource EstimationBy K. Zabrusky
Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami
Feb 27, 2013
-
Construction of the West Area CSO Tunnels and Pumping StationBy Ray Hutton, Darrell Liebno, Taro Nonaka
Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont
Jan 1, 2007
-
Advances in Dry Jigging Improves Coal QualityBy Richard Weinstein, Richard Snoby
There are many advantages to upgrading coal with dry jigging technology. The most obvious is the lack of process water, which eliminates the need for fines dewatering and slurry confinement. Dry jiggi
Jan 1, 2007
-
Chip Formation In Mechanical Excavation: An Indicator Of Machine PerformanceBy J. P. H. Steele, M. U. Ozbay
As mining operations progress toward tele-mining and autonomous procedures, the need for machine performance monitoring increases. Presently, through a combination of vision, sound, and other subject
Jan 1, 2002
-
Northern Dynasty Mines’ Pebble Project: A Strategic Resource For AlaskaBy Stephen Hodgson, Ken Brouwer
September 2005, Northern Dynasty Mines announced the discovery of a new, high-grade deposit at its Pebble project in southwest Alaska. The product of insightful geological investigation, Pebble East,
Jan 1, 2007
-
Diamond Deposits of AustraliaBy W. J. Atkinson
The first recorded discovery of diamonds in Australia was in 1851 in New South Wales. Subsequent prospecting has shown alluvial occurrences of diamond to be widespread through much of the Tasman fold
Jan 1, 1995
-
What Happens In Vegas: The Apex Tunnel Geologic InvestigationBy Ann L. Backstrom
The Apex Tunnel is part of the Southern Nevada Water Authority?s proposed Clark, Lincoln, and White Pine Counties Groundwater Development Project. The project is intended to develop unused Nevada grou
-
Selection, design and construction of retaining structure to support the primary crusher relocation project at Round Mountain MineBy O. MacIntosh
The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, NV began large-scale production in 1977. During 2008 Round Mountain Gold Corp. (RMGC) relocated the primary crusher facility ap
Jan 1, 2010