Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Continuous Elution of Gold from Activated CarbonBy Francois J. E. Scholtz, Raymond J. Davidson, Peter Greenhalgh, R. Paul Riley
A 1 t/d continuous elution pilot plan is being operated by General Mining at their Grootvlei Gold Mine using the technology developed at the Anglo American Research Laboratories. Flowsheet design and
Jan 1, 1990
-
Requirements for Effluent Treatment at the Waihi Gold MineBy David E. Peterson, F. Merz
The Waihi Gold Mining Company Limited, Martha Hill Project was the first major hard rock mining operation following the resurgence of the mining industry in New Zealand. Because of its location adjoin
Jan 1, 1991
-
Innovation and Its Management: A Production Manager's PerspectiveBy Bruce Cavender
Production managers look to innovative practices and equipment to reduce operating costs and improve efficiency. These innovations apply to both technical and social aspects of production operations a
Jan 1, 1998
-
Continuous Mining and Transport Methods for Large Open Cast MinesBy Sepp A. Kutschera
are gaining increased interest for overburden removal and ore production at large open cast mines. The application of bucket wheel excavators is still tied to soft unconsolidated rocks and soils, wh
Jan 1, 1992
-
What Can Hazardous Waste and Mining Waste Personnel Learn From Each Other?By Jim V. Rouse
The decision to hold parallel conferences dealing with hazardous waste and mining waste grew out of the conviction that there were advantages to having personnel serving the two groups talk to each ot
Jan 1, 1991
-
ONE-STEP LEACHING OF GOLD, PGM's AND BASE METALS FROM VARIOUS ORES AND CONCENTRATESBy C. A. Fleming, C. J. Ferron, P. T. O'Kane, D. B. Dreisinger
The platinum group metals (PGM's) are typically recovered by flotation, smelting of the flotation concentrate to matte, and matte leaching. Concentrates too low grade to be processed economically by t
Jan 1, 2000
-
Metallurgical Testwork To Define The Design Criteria For The Electrowinning System For Kcgm Fimiston Stage Ii Gold Room, Including Initial Commissioning And Operational ExperienceBy Peter Mason, Chris Walker, Mike Costello
The Phase I electrowinning system at KCGM's Fimiston Operation utilised the well proven technology of electrowinning precious metal values onto steel wool followed by calcining and direct smelting to
Jan 1, 1996
-
Integrating Milling With Heap Leaching At Barneys Canyon For Treatment Of Mixed-oxide OresBy John W. Greene
ennec?tt's Bameys Canyon Mine personnel developed an mnovahve process to extract gold from a small (1.8 million tons) sulfide ore zone in an oxidized ore body located at the Bameys Canyon Mine. This a
Jan 1, 1996
-
World Gold Surveys - Carbon TechnologyBy G. D. Ritson
Gold surveys were sent to 21 gold operations around the world. Eleven different surveys were sent, each targeting a different unit operation used commonly in gold processing. On a monthly basis the i
Jan 1, 1998
-
Managing A Mining Operation Requires Actionable Production IntelligenceBy John MacDonald
An unstable economy has shown businesses what the mining industry has known for decades ? a successful business location today may not succeed in the future. Unexpected expenses, natural events and wo
Jan 1, 2013
-
Asset Maintenance Readiness By Metso Outotec - SME Annual Meeting 2022By E. Gutierrez, P. Gillies
Asset Maintenance Readiness (AMR) provides a tailored reliability and maintenance strategy specific to operational needs. AMR delivers reliability and maintenance foundations for the plant and equipme
Mar 2, 2022
-
Gravity Concentration At Montana TunnelsBy Steve Lloyd, Mary Anne Antonioli, Byron Darnton
Pegasus Gold Corporations' Montana Tunnels mine began operation in March 1987. The process plant at startup consisted of a bulk flotation circuit followed by leaching of the reground bulk concentrate
Jan 1, 1996
-
Turnkey ProjectsBy Michael Mccorkle
The Turnkey Project contracting approach is a very viable project delivery system for many mine and mill owners. Generally speaking, the Turnkey Project approach makes sense when the owner knows what
Jan 1, 1998
-
Micro-Distillation Apparatus for the Distillation of Total CyanideBy Joe D. Allison, Tom D. Baugh
The analysis for total cyanides (CN, or the cyanide due to the combination of free, weakly associated and refractory cyanide complexes) is required by most regulatory agencies for determination of eff
Jan 1, 1990
-
Process Selection, Design And Commissioning Of The Rawas Gold Project, IndonesiaBy David Lunt, Paul Messenger, Peter Allen
The Rawas Gold Project in Indonesia has a high silver ore with a ratio of approximately 25:1 Ag/Au. Four process flowsheets were considered during the development phase, ie. full Merrill Crowe, CIP,
Jan 1, 1998
-
Flotation Of Auriferous Sulfides Using Santa Fe's N Tec Flotation TechnologyBy Gary L. Simmons
Many large (refractory) sulfide gold resources exist in Nevada and other parts of the world that are not amenable to conventional flotation concentration using air as the flotation gas medium. Over th
Jan 1, 1997
-
The Need for Mechanization of Cable Handling Behind Continuous MinersBy B. Stewart, J. R. Warneke
The productivity of underground mines has increased dramatically since the introduction of continuous miners. A variety of new hazards have developed as a result. In the spring of 2004, Mine Health
Jan 1, 2006
-
Identifying risk factors from MSHA accidents and injury data using logistic regressionBy Andrea Brickey, JUDITH BUABA, RICHARD AMOAKO
This study applies a machine-learning technique known as multiclass logistic regression on a 10-year injury dataset from the U.S. Mine Safety and Health Administration (MSHA) to determine miners’ susc
-
Industrial Minerals: Handling And TransportationBy J. Rothschild
I would like to thank the Society of Mining Engineers for inviting me as well as the other distinguished panelists to spend a morning reviewing and discussing the handling and shipping of industrial m
Jan 1, 1989
-
Pre - Leach Rinsing of Zortman OresBy Terry M. Hertel
Zortman Mining has spent approximately three years evaluating the metallurgy of the sulfide ores from the mining area of the possible expansion project. As the test program proceeded, an interesting s
Jan 1, 1992