An Analysis Of Air Cooling Prior To Reentering A Drift Containing Emplaced High-Level Nuclear WasteBy Jr. Wallace
This paper describes an analysis performed to determine the cool-down time of drifts in the prospective commercial nuclear waste repository in volcanic tuff at Yucca mountain, Nevada. Two emplacement
Jan 1, 1988
-
Flotation Machine & Circuit Design OptimizationBy V. R. Degner
Development of large mechanical flotation machines during the past fifteen years. This success was a contributing factor in recognizing the value in a systematic and rational means of optimizing the f
Jan 1, 1993
-
Design and Construction Aspects of CSO Tunnel and Pump Station SystemsBy Verya Nasri, James Sullivan, Alex Varas
"INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of
Jan 1, 2016
-
Marconaflo Borehole Mining SystemBy Eugene A. Lang, William R. Archibald
Early in 1972, Rocky Mountain Energy Company approached MARCONAFLO with a unique request for assistance. They controlled a series of scattered ore deposits in a remote section of Wyoming which had bec
Jan 1, 1976
-
Ilvipact Of Top Management Phil.dsophy On Heap Leach DesignBy R. Bruce Thorndycraft
Heap leaching should not be chosen for development of a property solely on the basis of paper studies. Management should be made to understand where the risks are in heap leaching, and management shou
Jan 1, 1998
-
Waste Transport via Conveyor at ASARCO Mission ComplexBy Robert Roggenthen
In 1994, ASARCO's Mission Complex Mine Planning Department designed a new stripping schedule to take advantage of reserve opportunities. Based upon the new stripping design, overburden removal ex
Jan 1, 1998
-
The Versatility of Tunnelling and Trenchless Methods for Sustainable Grid Construction - RETC2023By M. Peters, P. Schmäh
The development of renewable energies and a sustainable power grid are the challenges for future energy supply. Underground cables will replace the vulnerable overhead lines, because of their safety b
Jun 13, 2023
-
Total Concept’s coordinator’s point of viewBy Patricia Petty
If enthusiasm is a requirement, the coordinator of the Total Concept program is a dynamic, exciting leader with a lot of potential to keep the program a vital and progressive effort for many years. Ar
Jan 3, 1986
-
Large Underground Coal Mines Of The 1990?sBy David D. Eyer
Since the decade of the 1990s is nearly upon us, I have focused on what I see are the likely trends featured in new large underground coal mines 10 years from now. I do this from the vantage point of
Jan 1, 1988
-
Discussion – Volumetric Efficiency and the Potential for Increased Productivity in Underground Haulage Units – A Discussion of Plans and Concepts – Vol. 41, No. 12 – Leonard, J. W. and Newman, D. A.By N. Standish
Leonard and Newman (1989) describe concepts and plans of their forthcoming project designed to increase the bulk density of broken coal at various stages of its production and handling. This is an exc
Jan 1, 1990
-
Innovative Gold Heap Leaching Techniques For Special Situations ? IntroductionBy Joseph M. Keane
A number of innovative techniques exist for solving heap leaching problems in special situations. Some of these techniques have been successfully applied and others await an opportunity for applicatio
Jan 1, 1987
-
Mineral Processors Have Staying Power; Colorado MPD hits 68th yearBy Chee Theng
"Mineral processors know you can put in the best technology in the world but it won’t work optimally without the support of the operators. Conversely, you may have complete operator support but won’t
Jan 7, 2018
-
Channel Tunnel - Overview And Contractual ArrangementBy Jack K. Lemley
This paper will provide an update of the Channel Tunnel Project including a discussion of the overall legal structure and management organisation. It is important to understand the mission that TML, a
Jan 1, 1991
-
Thermo-adhesive separation of coal and minerals — A novel processBy D. PATIL, B. K. Parekh
Water is the mainstay for the beneficiation of fine-size coal and minerals, but it is also the least desirable constituent of the final product. The basic concept of the novel process described in thi
-
Removal Of Pb-Zn From Aqueous Solutions By Zeolitic TuffsBy V. Angelatou
In the present study, the possibilities of use of natural zeolitic tuffs from the Skaloma area, Rhodope prefecture, Greece, for the removal of Pb and Zn ions from aqueous solutions has been studied. T
Jan 1, 2006
-
Sustainable Development - The Way Forward For The Mining Industry - 1. IntroductionBy P. van der Veen
There are two key reasons for this presentation: - Sustainability - Improving the economic, environmental and social impact of mining. As I will discuss in my presentation we see sustainability thro
Jan 1, 2003
-
Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023By Alfredo Valdivia, Dominic Reda, Vojtech Gall
The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.
Jun 13, 2023
-
Mining Review (54eab27b-b297-46ed-8190-c22725140172)By U. S. Geological Survey Staff
"In 2017, the total estimated value of nonfuel mineral production in the United States increased by 6 percent from 2016 (Table 1). The value of metals produced domestically increased by 12 percent and
Jan 5, 2018
-
The Bowie Chabazite DepositBy Ted H. Eyde
The Bowie chabazite deposit has yielded the most mined tonnage of any natural zeolite deposit in the United States. Since 1962 the deposit has yielded about 12,000 tons of crude chabazite, with an est
Jan 1, 1987
-
Improved Strategies for TBM Performance Prediction and Project ManagementBy Priscilla P. Nelson, Yousof Abd Al-Jalil, Christopher Laughton
Prediction of excavation rates is a critical element in the pre-planning of a tunnel boring machine (TBM) project. A realistic evaluation of performance expectations is needed that reflects both the k
Jan 1, 1999