                Evaluating the Coal Bump Potential for Gateroad Design in Multiple-Seam Longwall Mining: A Case StudyBy J. Bal, V. D. Dao, W. Li
"SynopsisThis study proposes a methodology for evaluating the risk of coal bumps in multiple-seam longwall mining. Both the stress field and the total energy release (TER) during retreat were evaluate
Jan 1, 2015
 - 
                    
                A new corrosion-resistant stainless steel on the South African sceneBy J. P. Hoffman
This paper describes the metallurgical aspects and properties of a duplex austenitic-ferritic steel SAF 2205. As well as having high yield strength and hardness, SAF 2205 combines the high resistance
Jan 1, 1986
 - 
                    
                Computer-aided Use of a Screening Process ModelBy G. Ferrara
The mathematical framework of a well-established model proposed earlier by the authors for the screening process is briefly recalled. Some numerical methods for the application of the model, concernin
Jan 1, 1987
 - 
                    
                Investigating the effect of electrolyte physicochemical properties on electrodeposition and the incorporation of these effects in copper electrowinning models, C. Chibwe and M. TadieBy C. Chibwe, M. Tadie
Copper electrowinning models are useful for prediction of process performance, optimisation and improved understanding of complex phenomena such as current distribution without the expense of physical
Jan 1, 2020
 - 
                    
                A review of remote-sensing unmanned aerial vehicles in the mining industryBy M. Loots, E. Van Der Lingen, S. Grobbelaar
The increased adoption of unmanned aerial vehicles (UAVs) may improve the productivity and costeffectiveness of remote sensing in the mining industry. This review’s objective is to enable stakeholders
Jul 2, 2022
 - 
                    
                Effects processing parameters and building orientation on the microstructural and mechanical properties of AlSi10Mg parts printed by selective laser meltingBy J. van der Merwe, C. Phetolo, V. Matjeke
The mechanical properties and microstructure of AlSi10Mg alloy samples that were printed by selective laser melting (SLM) were studied to determine the effect of processing parameters and building ori
Jul 1, 2021
 - 
                    
                A quality classification of building stones from P-wave velocity and its application to stone cutting with gang saws - SynopsisBy S. Kahraman
P-wave velocity measurements were carried out on 22 large limestone blocks in a stone processing plant. In the laboratory, P-wave velocity of core samples was measured to obtain intact rock velocity.
Jan 1, 2007
 - 
                    
                Optimizing Medium-Term Operational Plans for a Group of Copper Mines (476b3df3-c089-4b00-9560-1bbd80974db2)By M. Splaine, W. Davison, D. C. Atkinson
"Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium
Jan 1, 2014
 - 
                    
                Quality control in tailings resource exploration at Havelock Mine, EswatiniBy S. Gan, E. van Niekerk, L. Birrell, D. Robbertze, L. Ncubi, B. Zhao
Quality assurance and quality control (or QAQC) plays a key role in safeguarding the level of confidence of the data generated during mineral exploration and mine development, and is also part of the
Jul 2, 2022
 - 
                    
                Towards An Integrated Approach To Tailings Management - SynopsisBy A. Chryss
Tailings management aims to dispose of tailings at the minimum cost consistent with meeting or exceeding imposed standards, including legislative obligations. This simple business objective requires m
Jan 1, 2012
 - 
                    
                Investigation of the mechanism for fireside corrosion in coal-fired boilers in South AfricaBy J. W. van der Merwe, K. G. Moloko
Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an
Jun 1, 2021
 - 
                    
                O.F.S. Branch, WelkomO.F.S. Branch, Welkom Minutes of a Committee Meeting held in the V.LP. Lounge of the Welkom Club on Tuesday, 26th June, 1973, at 5.00 p.m. Present Mr C. J. Isaac (in the Chair), Mr D. A. Smith, Mr G.
Jan 1, 1974
 - 
                    
                Germanium recovery by co-precipitation of germanium and iron in conventional zinc metallurgy - SynopsisA modified germanium recovery process in conventional zinc metallurgy, based on the understanding that ferric hydroxide has strong ability to coprecipitate germanium element, was presented. The relaxe
Jan 1, 2008
 - 
                    
                The Mixing Of Backfill In Gold MinesThe special mixing requirements for backfilling are discussed, and the problems associated with the mixing of coarse and deslimed slurries, as well as the tailings from the gold plant are outlined. Th
Jan 1, 1988
 - 
                    
                Fine grinding performance in a vertical stirring mill: steel balls versus nano-ceramic balls, N. Liao, C. Wu, J. Ye, D. Hu, and J. XuBy D. Hu, J. Xu, N. Liao, C. Wu, J. Ye
The vertical stirring mill’s fine grinding equipment is affected by the operating conditions during the grinding process. The grinding media has a great influence on the energy consumption and particl
Jan 1, 2020
 - 
                    
                Some Advances in Lognormal TheoryBy H. S. Sichel
This study deals with the development of some new theory concerning the bias which will result from the employment of the t-estimator if in fact the underlying distribution of ore values is not lognor
Jan 1, 1987
 - 
                    
                A Review of Rock Cutting for Underground Mining: Past, Present, and FutureBy D. Vogt
"Rock has been cut in the process of mining since before the invention of explosives. Today, we seek to return to cutting to reap the benefits of continuous operations for South African underground ha
Jan 1, 2016
 - 
                    
                Modelling the momentum force for bubble formation with oscillatory air supply, C. Li, A. Song, and Y. CaoBy Y. Cao, C. Li, A. Song
Bubble size plays a key role in determining flotation efficiency. Bubbles can be formed by passing air through pores. Bubble detachment from a pore is driven by lifting forces including buoyancy force
Jan 1, 2020
 - 
                    
                Influence of blasting charge distribution on the energy required for communition of rockBy T. Marin, J. E. Seccatore, M. Cardu
The most energy-intensive process in the mining industry is particle size reduction – comminution. The first phase of this process is blasting to fragment the rock from the initial Boussinesq’s halfsp
Aug 8, 2024
 - 
                    
                The Dual-Electrode DC Arc Furnace?Modelling Insights - SynopsisBy Q. G. Reynolds
The dual-electrode direct current (DC) arc furnace uses two graphite electrodes, one connected as cathode and one as anode. Such an arrangement avoids some of the design difficulties associated with t
Jan 1, 2011