Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast- Induced Structural and Crack Response of a Brick Residential Structure Near an Aggregate Quarry

    By Charles Dowding, Cathrine Aimone-Martin

    This article summarizes an investigation of the structural response of a brick façade home in New Mexico. The subject Ricter residence was located some 1100 to 1400 ft away from an aggregate quarry, a

    Jan 1, 2005

  • ISEE
    Impact of Blasting on Resource Recovery, Mining Profit, Safety, and the Environment

    By Z X. Zhang

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    The Large Chamber Test for Toxic Fumes Analysis of Permissible Explosives

    By Dennis J. Viscusi, James H. III Rowland, Lon D. Santis, Mark H. Weslowski

    This paper describes the procedure for analysis of toxic fumes from the detonation of high explosives using the Large Chamber at the U.S. Bureau of Mines (USBM), Pittsburgh Research Center (PRC). This

    Jan 1, 1995

  • ISEE
    Specialized Blend and Delivery Equipment Optimize Emulsion/ANFO Applications

    By Thomas F. Mechtenberg, Michael S. Powell

    In the past several years many coal operators and stone producers have reduced drilling and blasting cost by utilizing Bulk Emulsion/ANFO blends. For many operators the cost of equipment to handle ble

    Jan 1, 1990

  • ISEE
    Blast Control for the Hydroelectric Project "El Cajón" in the State of Nayarit in Mexico

    By David Yanez

    The hydroelectric project "El Cajón" is currently under construction in the state of Nayarit, on the Santiago River, in western Mexico. This project is comprised of a Concrete Face Rockfill Dam (CFRD)

    Jan 1, 2006

  • ISEE
    Unlocking the Wealth From Benefit Sharing in Drill and Blast

    By Lawrie Logan, Mike Wiggin

    This paper will be in two parts, a discussion of the benefits available from benefit sharing as a concept followed by an examination of how this approach was applied at Mesa J Mine and what improvemen

    Jan 1, 2001

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    Borehole Deviation Study in a Long-Hole Stope

    By Paul Miller, Rene Laprade

    Does a 76 mm Ø hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initia

    Jan 1, 1998

  • ISEE
    Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion Explosives

    By M Lemieux, R Mason

    The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d

    Jan 1, 1989

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    A full-field solution to predict vibrations in the presence of a free surface

    By J. A. Sanchidrián, P. Segarra, S. Gómez

    Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac

    Jan 1, 2024

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996

  • ISEE
    The Effect of Discontinuity Orientation on the Success of Pre-Split Blasting

    Previous approaches to pre-split blasting theory have tended to concentrate on the mathematics of dynamic stress wave interaction, whilst only recognizing some interaction with quasi-static stresses i

    Jan 1, 1984

  • ISEE
    Detection of Geological Features using Aerial Image Analysis and Machine Learning

    By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja

    Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst

    Feb 1, 2020

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of Kentucky

    By Jhon Silva-Castro, Russell Lamont

    Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra

    Jan 1, 2017

  • ISEE
    Bulk Explosives Test Work at Duvha Opencast

    By T Davids, O J. Jordaan, M D. J Bonneau

    As in most other parts of the world, the surface coal mining industry in South Africa is introducing emulsion explosives as the primary bulk blasting agent for use in wet borehole conditions where AN/

    Jan 1, 1987

  • ISEE
    Derivation of Fracture Intensity from Measured Fragmentation

    Prediction of fragmentation in Taconite Mining is an important aid to blasting engineers. A simple theory relates the intensity of radial fracture per unit length to distance from the borehole, from w

    Jan 1, 1996

  • ISEE
    Drilling and Blasting Optimization

    By Jorge Flores, Benjamin Cebrian

    Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a

    Jan 1, 2015

  • ISEE
    Field Investigations into Blast Design Parameters of Highly Jointed Rockmass of Overburden: A Case Study of Large Opencast Coalmine (India)

    By V R. Sastry, D P. Singh, N R. Thote

    Rock parameters which are uncontrollable impose restrictions on the procurement of desirable fragmentation. Blast design parameters which are controllable prove to be important tool in blasting operat

    Jan 1, 1995