Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Using Vibration Prediction to Reduce Blasting Costs and Complaints

    By Thomas Leonard, Philip R. Berger, Bryan E. Papillon

    Bardon Trimount Inc., a large producer of aggregate, crushed stone, and concrete, was experiencing significant public opposition to its five quarries in the Boston area. It was believed by the authors

    Jan 1, 1996

  • ISEE
    Strain-Based Vibration Criteria for Blasting in New York City

    By Catherine T. Aimone-Martin, Meyers Joseph A.

    A new strain-based criteria is being adopted for rock blasting in New York City (NYC). This criteria is based on several years of research involving vibration measurements of tall structures during bl

    Jan 1, 2019

  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • ISEE
    A New Generation of Drilling at the Minntac Mine

    By Don Thompson

    The Minntac Mine drills and blasts approximately 75 million long tons of taconite per year. This requires drilling one million feet of 1 6-inch diameter holes. We are in the process of replacing our o

    Jan 1, 1998

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    Explosives Notified Bodies - For Safety in Europe

    According to the Directive 93/15/EEC, given on 5th of April 1993, all the commercial explosives placed on the market and transfered in European Union and EFTA countries have to be certified and contai

    Jan 1, 2004

  • ISEE
    Improving Blast Fragmentation Prediction with New Technologies for Rock Mass Characterization

    By John Kemeny

    There are many methods used to predict blast fragmentation, including empirical and numerical models, field trials, and experience from ongoing blasting. All of these methods require an accurate measu

    Jan 1, 2004

  • ISEE
    Projectile Generator Design for Underground Coal Mine Seal Testing

    By Ethan Steward, Kyle Perry

    To test the effects of impact on mine seals, a projectile generator and two seals have been constructed. The projectile generator is a 12-inch (30.5 cm) inner diameter steel pipe with a 4-inch (10 cm)

    Feb 1, 2020

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Cycled Prill - A New Generation of High Performance High Density of ANFO Explosives

    By C James Dahn

    A new generation of high performance and high density ammonium nitrate prills have been developed. These cycled "prills" offer significant improvement in ANFO mixing time, detonation velocity performa

    Jan 1, 1980

  • ISEE
    Energy, Strength and Performance, and Their Implications in Rating Commercial Explosives

    By B Mohanty

    Several parameters such as, Energy, Strength, Brisance, Impulse, and Bubble Energy, are in common use in the explosives industry today to rate commercial explosives in terms of blasting performance. H

    Jan 1, 1981

  • ISEE
    Development, Application and Review of Ontario's Quarry Blasting Vibration Guidelines

    By Lance McAnnuff

    Whatever system is devised to control noise and ground vibration from blasting operations must present an effective compromise between the rights of the individual to be undisturbed by the actions of

    Jan 1, 2004

  • ISEE
    Safety Talk - Misfires: Don't Overlook the Safety if Flaggers

    By Larry Schneider

    In the construction field and to a lesser degree in mining, flagman are often necessary to move traffic and or pedestrians through work zones. Everyone readily recognizes that they are essential for t

    Jan 1, 2004

  • ISEE
    Use of Visualization Tools for Drill and Blast Activities

    By Carlos Alvarado, Hernan Narea, Jhon Silva, Bryan Townsend, Katherine Gil, Brayan Caceres, Felipe Pontanilla

    With the promising development of new technologies, automation in Drill and Blasting (D&B) is on the horizon. The data generated in all D&B activities, which is currently segregated, can be linked to

    Jan 21, 2025

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability

    "Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate

    Jan 1, 2017

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    ICI's ExEx2000 Blasting Systems

    By Peter Duniam, Vivian Patz

    History of the ExEx 1000 CAB system. l What we’ve learned using electronic timing. l Requirements for a second generation. EDD system. l The ExEx 2000 system - simple, versatile and cost effective

    Jan 1, 1997

  • ISEE
    Analysis of the Rock Mass by Geophysical Methods

    By France Goupil, Richard Barabe

    In 1987, a large company reopened its quarry located in a very dense urban area in Montreal-East. This reopening occurred after a long period of inactivity during which houses were built within 200 fe

    Jan 1, 1992

  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Evolution of the Avalauncher

    By John Brennan

    The Avalauncher has been an integral tool for avalanche mitigation work for close to 50 years. With their ability to place a kilogram of high explosives up to two thousand meters away, they routinely

    Jan 1, 2009