A Cut And Cover In Stiff Clay In Eurre-France - Synopsis
By R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis
By E. R. Wang
This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi
Jan 1, 2010
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History
By Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Man - Organisation - Technology - Proposals For Optimising Preventive Work
By Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
Single Pile Settlement Prediction And Analysis For Driven Piles
By David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
Experience Gained At The Application Of Atlas Piles In Poland
By Kazimierz Gwizdala
In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering
Jan 1, 2006
-
Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building Damage
By K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami
Jan 1, 2014
-
Effect Of Vertical Heterogeneity In Soil Strength On Pile Bearing Capacity Prediction From CPT Data
By Amaneh E. Kenarsari
Among the different sources of uncertainty in pile bearing capacity prediction including inherent heterogeneity, measurement and model uncertainties, the inherent heterogeneity of soil properties is o
Jan 1, 2011
-
Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia
By James J. Neate
The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install
Jan 1, 1988
-
Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts
By Cheng Lin
The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a
Jan 1, 2009
-
Simbat : High Strain Dynamic Test Of Piles
By Dominique Vié
Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera
Jan 1, 2002
-
Real Time Validation of Driven Cast In-Situ Piles
By Derek Egan
"Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid
Jan 1, 2014
-
Design Strategy For Deep Slurry Stabilized Bored Piles In Compression
By Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002
-
Apportioning Risks On An Urban Deep Foundation Project
By Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
Construction Productivity Advancement Research Program (CPAR)
By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal
Jan 1, 2007
-
Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects
By K. Viking
This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and
Jan 1, 2013
-
Machine Foundation Repair
By Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003
-
Numerical Analyses Of Pile Load Testing And Pile Base Grouting
By Wen-Chieh Cheng
Two bored piles with base grouting are loaded axially and the results are used to compare with numerical analyses. One compressive pile with a diameter of 2 meters is drilled through clay deposit and
Jan 1, 2006
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure
By L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989