Evaluating Efficiency of Geo5 in the Analysis of Pile Foundation
By Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal
"Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail
Jan 1, 2017
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Offshore Wind Turbine Foundations - In Denmark And Belgium - Introduction
By Jørn H. Thomsen
This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI
Jan 1, 2013
-
High Mobility Grouting Prevents Historic Fountain from Sinking
By Brian M. Fraley
"Portions of the Catholic Total Abstinence Fountain in Fairmount Park in Philadelphia, Pa., were in “imminent danger,” according to a restoration services request for proposals (RFP) issued by the Cit
Jan 1, 2017
-
Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case History
By Raffaella Granata
The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an
Jan 1, 2006
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation
By David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Compressive Behaviour of Hollow Core Micropiles in Cohesive Soil
By M. Hesham El Naggar, Osama F. E. Drbe
"Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio
Jan 1, 2014
-
Stub Pier Stabilization Performance
By Swaminathan Srinivasan, Jess A. Schroeder
"Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer
Jan 1, 2017
-
Hand-Dug Underreamed Piles At Embankment Place, London
By W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Piled Foundation Design as Reflected In Codes and Standards
By Bengt H. Fellenius
"ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.
Jan 1, 2014
-
Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.
By Theo. A. M. Salet
The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a
Jan 1, 2006
-
Estimation of Shaft and Base Responses from Pile Load Test
By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran
"Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc
Jan 1, 2017
-
Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam
By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett
"A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu
Jan 1, 2017
-
Development Of Design Practice For Piles In Stiff Glacial Till
By Kenneth Gavin
Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete
Jan 1, 2009
-
Uplift Capacity Of Drilled Piers In Clay - Synopsis
By Braja M. Das
Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat
Jan 1, 1987
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored Piles
By Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
New Method for Reduction of Settlement Drilling Casings for Steel Core Piles
By Larsson Lars-Erik, Rani Isa, Martin Jönsson, Håkan Bredenberg, Mats Larsson
"IntroductionSteel Core Piles are used extensively in Scandinavian countries, where hard rock is found within reasonable depths. A steel core is cast into a drilled steel tube casing and a rock hole i
Jan 1, 2014
-
Deep Foundation Design For Liquefaction Induced Lateral Spreads
By Zia Zafir
Design of the deep foundations for the loads imposed by lateral spread include the estimate of the pressure applied by the liquefied material as well as amount of anticipated displacement. In the abs
Jan 1, 2006
-
Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data
By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam
A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice
Jan 1, 2018
-
Drilled Shaft Difficulties and a Micropile Solution
By Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were