Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Piles In Peat Under Artesian Pressure: A Case Study ? Synopsis

    By K. Y. C. Chung

    A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga

    Jan 1, 2010

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • DFI
    Peak And Post-Peak Shear Strength Of Cement-Bentonite

    By Paul J. Axtell

    Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t

    Jan 1, 2010

  • DFI
    Theoretical And Experimental Investigation On Underwater Ground Anchors

    By Leonello Sciacca

    Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas

    Jan 1, 2011

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Preserving The Foundations Of Some Of Boston?s Oldest Buildings

    By Michael J. Atwood

    Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood

    Jan 1, 2011

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • DFI
    Development of New Shaft Resistance Models for Piles Driven in the Puget Sound Lowlands

    By Armin W. Stuedlein, Youssef Bougataya

    Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci

    Jan 1, 2018

  • DFI
    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • DFI
    Automated Installation Monitoring For Augercast And Driven Piles

    By Garland Likins

    Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat

    Jan 1, 1999

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2004

  • DFI
    FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors

    By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady

    Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e

    Jan 1, 2018

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    New Technology of Force Monitoring of Post-Tensioning Ground Anchors

    By Shahid Islam, Lucian Bogdan

    There is a rapid expansion of world’s infrastructure and simultaneously existing infrastructure is aging. The maintenance of infrastructures has been of particular concern to the engineering community

    Jan 1, 2018

  • DFI
    Static And Dynamic Approaches For Bearing Capacity Evaluation Of Driven Piles In Two Dry Docks Project

    By N. Shariatmadari

    Two dry docks are currently under construction on the northern banks of the Persian Gulf by Iran Shipyard and Offshore Industries Co. (ISOICO). The construction of these dry docks forms a huge civil o

    Jan 1, 2007

  • DFI
    United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication

    By Giovanni A. Bonita

    The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir

    Jan 1, 2006

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test

    By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles

    "This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te

    Jan 1, 2017