Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico
By Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
-
The Effc/Dfi Guide To Support Fluids For Deep Foundations
By Chris Harnan, Christophe Justino
The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20
May 1, 2022
-
Practice to Reduce Ground Displacement in Deep Mixing Work
By Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) technique is widely known as soil mitigation technique with small ground displacement during installation comparing with other techniques. Some projects involving sensitive struc
Jan 1, 2015
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro Project
By Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
-
Deep Foundation Advancements in Fargo
By Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Wolf Creek Dam Foundation Remediation – An Innovative Solution
By Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC
By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce
"In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa
Jan 1, 2015
-
Osterberg Cell Tests Confirm In-Situ Pier Capacity In Colorado - Introduction
By William Siegel
Kleinfelder provided foundation analysis and design for an expansion to a cement plant in Florence, Colorado. The expansion was a conversion from a horizontal wet process to a vertical dry process, a
Jan 1, 2007
-
Innovation In South East Asia - Synopsis
By Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks
By Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
Innovations In Diaphragm-Wall Construction Plant
By Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls
4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist
By Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged Toes
By Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations
The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi
Jan 1, 2004
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-Constructions
By Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & Piles
By Shahid Islam, Lucian Bogdan
"The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th
Jan 1, 2017
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis
By S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996