Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating HighlightsBy K. Meyer
"INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.
Jan 1, 1989
-
An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 mBy Wendy L. Naysmith
This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to
Oct 1, 2010
-
Predictive Control and Real Time Optimization in the Minerals IndustryBy Quin Dennis
Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el
Nov 1, 2011
-
Residual Effects of Lognormality in Concentrator DataBy Norman O. Lotter, André R. Laplante
"The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim
Jan 1, 2005
-
Experimental and Thermodynamic Modelling Study of the Effects of Al2O3, CaO and MgO Impurities on Gas/Slag/Matte/Spinel Equilibria In The “Cu2O”-“FeO”-SiO2-S-Al2O3-CaO-MgO SystemBy T. Hidayat, D. Shishin, S. Sineva, M. Shevchenko
The effects of the slagging components Al2O3, CaO and MgO on the thermodynamics and phase equilibria of the gas/slag/matte system with major elements “Cu2O”-“FeO”-SiO2-S are characterised using an int
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG MillBy Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Molybdenite Flotation by Controlling Pulp PotentialBy M. Kolahdoozan, H. Noori
"Molybdenite flotation at the Sarcheshmeh Copper Complex has been studied as a function of pulp potential controlled using two types of sodium sulfide (mineral and chemical origin). Air and either pla
Jan 1, 2006
-
An Expert System Supervisor of a Flotation CircuitBy A. L. Mular, R. P. Edwards
"The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits
Jan 1, 1991
-
Comparison of Uranium Solvent Extraction Strip OptionsBy Deon van Tonder, Chuck Edwards
"Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco
Jan 1, 2013
-
Principal Components Analysis of ToF-SIMS Data: Application to Mineral Recognition, Surface Reaction and Separation by FlotationBy Brian Hart, Roger St. C. Smart, James Francis, Mark Biesinger
"There are a number of challenges involved with the surface analyses of different mineral phases from process streams in a flotation facility. The first of course is to collect samples that are repres
Jan 1, 2007
-
Optimization of Pellet Plant Process Parameters Using Six Sigma MethodologyBy Andrea McGlynn
Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%
May 1, 2011
-
Removal of Organic Carbon with a Jameson Cell at Red Dog MineBy Todd Smith, Brigitte Lacouture, Greg Anderson, David Lin
"The lead and zinc flotation circuits at Red Dog Mine are preceded by a preflotation circuit which recovers naturally-floating organic carbon contained in the ore. Organic carbon is a potential contam
Jan 1, 2008
-
The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground VoidsSafe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such
May 1, 2007
-
Process Improvements at Placer Dome Campbell MineBy K. Norris
"The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p
Jan 1, 1992
-
Visualization of Fine Bubbles and Their Role in Fine Particle FlotationBy Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui
"High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve
Jan 1, 2006
-
Biological Sulphide Production for Process and Environmental ApplicationsBy Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil
"The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be
Jan 1, 2006
-
Water Management Design for Cigar Lake Uranium MineBy Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
Pavoncelli Tunnel Case StudyThis paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L
May 1, 2009
-
Improving Raisebore Stability Assessments and RiskBy B. M. Coombes
The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past
May 1, 2011