Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Nickel-Copper Smelter at Falconbridge

    By J. R. Gill

    Introduction The property and plant of the Falconbridge Nickel Mines, Limited, is situated about 13 miles northeast from Sudbury, in Falconbridge township, near the eastern extremity of the southern

    Jan 1, 1932

  • CIM
    The Efficiency of Various Digestion Procedures on the Extraction of Metals From Rocks and Rock-Forming Minerals

    By J. R. Foster

    Investigations into the effect of a variety of acid digestions on common rock-forming minerals demonstrated a considerable variation in the proportion of the total metal extracted. A similar situation

    Jan 1, 1973

  • CIM
    Impurities of Secondary Zinc Oxides as Limiting Factors for the Primary Industry

    By C. Pichler, C. Benigni, J. Antrekowitsch

    "The recycling of steel mill dust results in zinc oxides which are sold to the primary industry in or-der to recover zinc in its metallic form. Due to the contained impurities - chlorine and fluorine

    Jan 1, 2017

  • CIM
    Cadia Expansion – From Open Pit to Block Cave and Beyond (4a1cbd75-8ba9-4485-8c66-2de027979f5e)

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    Impact-Induced Damage on Foliated Ore Pass Walls

    By K. Esmaieli

    ABSTRACT We conducted a series of numerical experiments to investigate the influence of rock mass foliation on impact-induced damage on ore pass walls. The 2D Particle Flow Code was used to simulate t

    Jan 1, 2014

  • CIM
    The Hollinger Assay Office

    By W. R. Dodge

    THE growth and development of the assay department of the Hollinger Consolidated Gold Mines, Limited, is a similar story to that of the mine itself. As the mine developed and enlarged, so also increa

    Jan 1, 1931

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Automated Laser Scanner 2D Positioning and Orienting by Method of Triangulateration for Underground Mine Surveying

    By Julian V. Simela

    Conventional methods of underground surveying use theodolites/total stations and 3D laser scanners to obtain information about the underground environment. Current methods of geo-referencing these ins

    Aug 1, 2013

  • CIM
    Improving Mineral Project Performance

    By Frederick Biery

    Outline ? Project Challenges ? Results from 100 recent projects ? What factors are driving the best and worst projects ? A look at recent mining projects ? Conclusions

    May 1, 2009

  • CIM
    Géologie des Mines de Chrysotile de la région de Thetford Mines, Québec

    By Gilles Bonin

    Structures and serpentinization patterns in the Thetford Mines peridotites are important characteristics indicating the necessary geological conditions which led to the development of chrysotile orebo

    Jan 1, 2001

  • CIM
    Open Pit Production Planning using Controlled Pushbacks and Aggregates

    Open pit production planning is a procedure consisting of multiple stages. Although all the planning stages rely on the geostatistical block models, long- to short-term plans each require their approp

    Aug 1, 2013

  • CIM
    Bankable Feasibility Studies ( and other terms)

    By Reinis Sipols

    AGENDA ? Introduction ? Definitions and Key features ? PEA - Preliminary Economic Assessments ? PFS ? Preliminary Fesibility Studies ? FS ? Feasibility Studies ? Costs and Risks ? Cash Flow, Ec

    May 1, 2013

  • CIM
    Noranda Process Reactor at Xstrata Copper- Impact of Minor Slag Components (CaO, Al2O3, MgO, ZnO) on the Optimum %Fe/SiO2 in Slag and Operating Temperature

    By P. Coursol

    The Noranda Reactor Process (NRP) has been in operation now for more than 30 years and this mature process has attained a high level of performance. The NRP at the Home Smelter of Xstrata Copper treat

    Jan 1, 2007

  • CIM
    Further Potassium-Argon Age Dating at Copper Mountain, B.C.

    By V. A. G. Preto, W. H. White, J. E. Harakal

    Potassium-argon age dating performed recently on intrusive rocks from Copper Mountain indicates that the satellite Smelter Lakes and Voigt stocks have radio-metric ages which are indistinguishable fro

    Jan 1, 1971

  • CIM
    Alternative to Improve the Traditional Chinese Copper Smelter

    By S. Demetrio

    China has a traditional segment of Copper Smelters with its own Chinese technology, typically small in size from 20.000 to 50.000 tCu/a, and they are responsible for the processing and production of m

    Jan 1, 2007

  • CIM
    Development of a New Correlation Based on Grain Size Distribution to Estimate Sandstone Reservoir Uniaxial Compressive Strength

    By A. L. Nunes, J. R. E. Garcia, G. Silva, U. Prasad, C. Rabe

    "Drilling through the Guayabal shales, a gray calcareous shale, and the C1 to C100 formations, a well-cemented calcareous-sandstone in Corralillo field, Mexico, is a challenge due to severe wellbore i

    Jan 1, 2015

  • CIM
    Laboratory Study of the Effect of Well Orientation, Completion Design, and Rock Fabric on Near-Wellbore Hydraulic Fracture Geometry in Shales

    By J. Desroches, J. Burghardt, N. Whitney, B. Lecampion, A. Surdi, M. Houston, S. Stanchits

    There is accepted evidence that multistage fracturing of horizontal wells in shale reservoirs results in significant production variation from perforation cluster to perforation cluster. In fact, only

    Jan 1, 2015

  • CIM
    Selective Comminution and Magnetic Separation of Rare-Earth Ore from Dong Pao, Vietnam

    By Mayumi Ito

    Mineral processing of rare-earth ore from the Dong Pao deposit, Vietnam, was investigated. The ore contained bastnaesite, (REE (rare earth element)) CO3F, as the valuable mineral and barite, quartz, a

    Aug 1, 2013

  • CIM
    An Unusally High Thermal Efficiency Power Plant for the Cantung Mine

    By C S. Walker

    This paper analyzes the physical, operational and economic site conditions which were conducive to the design of a diesel-electric power plant wherein the over-all use of the thermal energy of the fue

    Jan 1, 1965

  • CIM
    A review of the first 25 years of mobile machine automation in underground hard rock mines

    By Malcolm Scoble, Nick Vagenas, Greg Baiden

    Recent advances in underground communications technology have demonstrated the feasibility of teleoperation and automation in underground metal mines. One major challenge lies in the automation of und

    Jan 1, 1997