Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Solvent Extraction of Copper Using Microstructured Droplet Generator

    By R. Sharma, I. Miskovic, S. Miskovic

    Solvent extraction (SX) is a widely used method for the extraction of copper from pregnant leach solutions or other ionic solutions in hydrometallurgical applications. About 17% of total refined coppe

    Jan 1, 2019

  • CIM
    Early Evaluation of Ground Conditions Ahead of Tunnel Face by Inclination Monitoring During Excavation

    By K. Sakai, M. Miyaue, T. Aoki, T. Tani, S. Tanaka, N. Kudo

    In the planning stage of a tunnel, due to limited technology in the geological survey and the financial restriction, tunnel supports are often designed from unsatisfactory information, and the tunnel

    Jan 1, 2015

  • CIM
    Advocate Mines Limited asbestos deposit

    By M. J. Collins

    The Advocate Mines Limited asbestos property is 6 km north of Baie Ve rte on the northeast coast of Newfoundland. Mining began in the early 1960s and was concluded in 1981. The chrysotile asbestos dep

    Jan 1, 1984

  • CIM
    Process Improvements at Falconbridge Dominicana

    By D. Ortiz, J. R. Frias, E. D. Mast, J. J. Fañas

    Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processi

    Jan 1, 2005

  • CIM
    Inspection and rehabilitation of the Daly-Judge Tunnel, Park City, Utah

    The Daly-Judge Tunnel, begun in 1887 to drain mine workings, is now a source of potable water for the Municipality of Park City. The water is exceptionally clean; however, when roof falls occur, suspe

    Jan 1, 2006

  • CIM
    Targeted Mineralogy in Informing Compositing and Detailed Analysis for Geometallurgy: A Cu Porphyry Case Study

    By T. C. Chudy, C. C. Hamilton, G. R. Lane

    The selection and provision of mineralogical services to assist in developing a GeoMetallurgical program for a Cu Porphyry Mine in South America is covered in this paper and presentation. The objectiv

    Jan 1, 2019

  • CIM
    A Study of Image-Based Element Condition Index for Bridge Inspection

    By R. S. Adhikari

    This paper presents an innovative computer vision method for condition assessments of bridges with multiple defects in bridge elements using digital images. This work utilizes 3D model of existing bri

    Aug 1, 2013

  • CIM
    Contribution of the Mining Industry: A Positive Message to Canadians

    By Paul Stothart

    Context ? Industry is active in urban, rural, and remote regions ? Faces a range of environmental challenges and ?social license? issues ? There are also Aboriginal and northern issues ? Also very

    May 1, 2008

  • CIM
    Standardization of Geological & Geomechanical Assessment at Underground Coal Mines in Canada

    By S. Forgeron

    Presentation ? Introduction ? Canadian Underground Coal Mines ? Standardization of Geological Assessment ? Geomechanics Base-line Studies of Canadian Coal Mines ? Cape Breton Development Corpora

    May 1, 2001

  • CIM
    The Effect of Fixed Work on Incentive Rates

    By Douglas A. Sloan

    AN INCENTIVE or bonus system of payment is commonly used for mine labour. The incentive rates are usually based on the variable units of production, such as dollars per foot of drift advance or cents

    Jan 1, 1958

  • CIM
    Sulphur potential of the Wabamun Group, Alberta

    By Victor F. Hollister

    Elemental sulphur occurs as aformational sedimentary deposit in Upper Devonian Wabamun evaporites near Coronation, Alberta. The deposit developed in a stratigraphic jacies-change lrap; it is assumed t

    Jan 1, 1984

  • CIM
    Scale Model Study of Time Domain Electromagnetic Response of Tabular Conductors

    By A. Becker, C. Gauvreau, L. S. Collett

    "A scale model was designed to simulate the airborne Barringer INPUT time domain electromagnetic system. The amplitude of the response to a vertical conductive dyke varies considerably with the conduc

    Jan 1, 1972

  • CIM
    5 ¼ -Mile Single-Flight Conveyor

    By R. Walker

    This paper deals with the selection and design of a belt conveyor handling steam coal between a mine and a barge loading terminal, and extending for some 5 ¼ miles over some of the most rugged terrain

    Jan 1, 1971

  • CIM
    Proximity Detection

    By Lucas van Latum

    A Model for Safety Swiss cheese metaphor of safety layers Image »Multiple layers with independent, often transient failure modes »For a loss to occur, all layers must fail independently and simult

    May 1, 2011

  • CIM
    A Risk-Based Approach to Plant Design

    By Mike Fontaine

    The success of a project is defined by meeting the financial performance objectives of the business case within a stipulated timeframe. Early in design, little information is normally available; the u

    Jan 1, 2015

  • CIM
    Diamond Processing a Review and Comparison of Technology Worldwide

    By Mark Stephenson, Paul Henharen

    "The objective in the mineral processing of primary ores is to liberate and effectively recover each individual economically viable diamond with minimal reduction in its potential value.There are thre

    Jan 1, 1994

  • CIM
    Failure Mechanism of Pea Gravel within the Annular Gap of a Shield-TBM Driven Tunnel

    By M. R. Henzinger, W. Schubert

    "The quality of the backfill applied at a shield driven tunnel is of significant importance failure of the lining. The used material also affects the interplay between support and excavation behaviour

    Jan 1, 2015

  • CIM
    Sulphide Precipitation and Ion Exchange Technologies for Cost Effective Removal of Selected Metals in Wastewater

    By A. Consigny

    New "clean technologies" to treat mining and metallurgical effluents containing dissolved metals have been successfully applied at mine sites in North America and Asia, treating water flows up to 24,0

    Jan 1, 2011

  • CIM
    Methods of Breaking and Handling Ore at East Geduld

    By A. S. Knight

    THE breaking and handling of ore is obviously the most important consideration when the layout of a new mine is contemplated. The problem must be attacked with due regard to the claim area of the prop

    Jan 1, 1942

  • CIM
    A Method of Determining Recoverable Iron in Mixed Magnetite-Hematite Orebodies

    By P. E. Cavanagh

    "The Davis tube test has been used for many years as a laboratory method for determining the magnetic iron re-coverable from a magnetite iron orebody. This paper de-scribes a method for determining th

    Jan 1, 1968