Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Preserving the historical record of Canadian mining and metallurgy

    By Norman R. Ball

    "Many people in the mining and metallurgical industries were brought up to embrace Henry Ford's pronouncement that ""History is bunk"" but it is not generally known that the same Henry Ford creat

    Jan 1, 1999

  • CIM
    Autogenous Pyrolysis Process - An Enabling Technology for Production of Renewable Carbon for the Steel Industry

    By J. Donnelly, A. V. Deev

    Substitution of coal and coke by renewable carbon (charcoal) is a low-risk and low-capital path to 50% or more reduction in net CO2 emissions by the steel industry. However, the high cost of charcoal

    Jan 1, 2015

  • CIM
    Economic Considerations in the Production and Preparation of Coal for the Carbonization Market

    By Gerald Blackmore

    "This paper suggests that with the settlement of long-term contracts of fifteen years' duration, with prospects of extension, the coal mining industry has, for the first time, a complete commercial ju

    Jan 1, 1970

  • CIM
    The Wellington Lake Power Project

    By E. M. Stiles

    THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that

    Jan 1, 1940

  • CIM
    Workforce Demographics and Constrained Critical Resource Planning

    By Davis Myers

    OVERVIEW ?A summary of population demographics data ?Potential impact of Baby-Boomer, Generation X, Millennial demographics in the mining workforce ?Planning with constrained resources Age Cohorts

    Nov 1, 2011

  • CIM
    Design of Copper Cooling Systems for Copper Smelting and Converting Furnaces

    By I. Mc Dougall, H. Joubert, G. de Villiers

    The use of sidewall copper cooling systems to prolong furnace campaign life is becoming an accepted technology solution in the base metals industry. Tenova Pyromet has designed and installed a number

    Jan 1, 2019

  • CIM
    Stratigraphy, Mineralogy, Geochemistry, and Genesis of the Au-Rich Volcanogenic Massive Sulfide (Vms) System from the Bate Verte Peninsula, NW Newfoundland, Canada: The 1806 Zone As An Example From The Ming Mine, Rambler Camp

    By P. J. Sylvester, S. J. Piercey, S. Maloney, S. M. Brueckner, L. Pilgrim, D. Hyde, G. Ogilvie

    The 1806 zone is part of a Au-rich volcanogenic massive sulfide deposit at the Rambler Camp on the Baie \/erte Peninsula, northwestern Newfoundland, and is characterized by high Au grades (3.97 g/t),

    Jan 1, 2011

  • CIM
    Metallurgical cokes from oxidized highly caking coals

    By B. Ignasiak

    Laboratory studies suggest that improvements of coke strength brought about by pre-heating caking coals before carbonization accrue from inadvertent oxidation rather than from other low-temperature ch

    Jan 1, 1979

  • CIM
    Financing Mines, Mining Projects and Mining Companies

    Abstract: ?The paper will review the perspective of Scotia Capital on financing mines, mining projects and mining companies in today's world of major increases in commodity prices, increases in

    May 1, 2006

  • CIM
    Discrete Event Simulation of Mine Equipment Systems Combined with Reliability Analysis Based On Genetic Algorithms

    By Greg Yuriy

    This paper discusses research carried out by the Laurentian University Mining Automation Laboratory (LUMAL) in the field of discrete-event simulation of mine equipment systems and reliability assessme

    May 1, 2003

  • CIM
    Muskeg -A Review of Engineering Progress

    By R. A. Hemstock

    "Simple classification systems are now being used which will describe adequately the surface vegetation, the topography and the peat for any muskeg condition. Good progress is being made in determinin

    Jan 1, 1960

  • CIM
    Theoretical and Experimental Study on the Flexible Barrier Optimization Against Debris Flow Risk

    By F. Vagnon, A. M. Ferrero, M. Pirulli, A. Segalini

    "The topic of this study is the design of flexible fences to mitigate the risk due to debris flow phenomena by means of theoretical and experimental studies analysed in framework of the Rock Engineeri

    Jan 1, 2015

  • CIM
    An Approach to Assess and Control the Flotation of Minerals – Semiconductors

    By V. Panayotov, M. Panayotova

    "Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr

    Jan 1, 2016

  • CIM
    In-situ thermal analysis technology for aluminum foundry alloys

    To produce high quality castings, one must monitor the melt quality by evaluating such parameters as the grain refinement and silicon inoculation and modification during the production of the commerci

    Jan 1, 2004

  • CIM
    Teck Cominco's KivcetTM Furnace Operation - The First 10 Years

    By G. G. Richards, D. J. Rioux, R. L. Stephens

    Teck Cominco Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. The year 2007 marks ten years of operation of KIVCETTM flash smelting technology for the treatment

    Jan 1, 2008

  • CIM
    Mapping the Future of Occupational Health and Safety in the Nigerian Mining Sector

    By Iwueze Anaekperechi Rose

    The International Labor Organization has declared mandatory adequate provision of safe workplace and safety for all workers in all occupations including the mining sector. Early scientists like Agrico

    Aug 1, 2013

  • CIM
    The Measurement of the Sulphur Dioxide Content of Copper Converter Gases as an Aid to Converter Control

    By E. H. Dudgeon

    In order to make increased use of automation in copper smelting, it is evident that a useful first step .world be the accurate determination of the copper end point in the converter operation. After l

    Jan 1, 1966

  • CIM
    Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake

    By Peter A. Cain, John C. Folinsbee

    "A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the

    Jan 1, 1966

  • CIM
    De-Leading a Copper Concentrate

    By Peter S. Jack

    "IntroductionTHE ORES treated at the concentrator of the Britannia Mining and Smelting Company, Limited, Britannia Beach, B.C., have always contained some lead, but it was not until 1950 that the comb

    Jan 1, 1953

  • CIM
    Numerical Simulation of Percussive Drilling and its Modification in Stress Wave Propagation

    By K. Hashiba, Y. Z. Liang, K. Fukui, M. Koizumi

    "Efficiency and penetration rate during percussive rock drilling significantly affect the speed of tunneling and excavation. Many researchers and engineers have continuously engaged in the advancement

    Jan 1, 2015