Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Diesel Locomotive Transportation Underground

    By F. Doxey

    Introduction Numerous papers have been written dealing with the construction and functions of, and the environmental conditions created by, Diesel locomotives. Therefore, it is not my intention to at

    Jan 1, 1951

  • CIM
    Recovery of Iron Ore Ultra-Fines from Tailings by Using Wet High Intensity Magnetic Separation – Jones ® WHIMS

    By Y. Wong

    The quality and quantity of secondary deposits, which include tailings streams and tailings dams, are increasing around the globe. The tailings are already mined, available and liberated to such an ex

    Jan 1, 2016

  • CIM
    Mineralogical Study of Arsenic-Bearing Species in Copper Roaster Calcines to Aid Process Development

    By J. Oliveira, A. R. Barnes, R. Pandher

    Sub-stoichiometric roasting of arsenic-bearing copper ores is a well established practice. However, ores containing calcium commonly prove challenging where very low arsenic levels are desired, but th

    Jan 1, 2014

  • CIM
    Uncertainty surrounds deduction of environmental costs

    By Robert B. Parsons

    "Income tax legislation is not keeping pace with federal and provincial environmental legislation. There is a vast array of new environmental regulations at various stages of implementation across the

    Jan 1, 1991

  • CIM
    Separation and Purification of Rare Earth Metals Using Molecular Recognition Technology

    By R. L. Bruening, N. E. Izatt, S. R. Izatt

    "Rare earth elements (REE) are essential and unique components of many high-technology products without which functioning of modern society would be greatly impaired. Commercial deposits of REE are li

    Jan 1, 2012

  • CIM
    Design and Optimisation of a New Hydrometallurgical Processing Route for Copper Recycling Using Process Simulation

    By A. de Ville d’Avray, G. Guezennec, P. Wavrer, E. Braak

    The aim of the European CEReS project was to develop an innovative copper recycling route based on the coprocessing of coal production waste by bioleaching and printed circuit boards (PCBs) from Waste

    Jan 1, 2019

  • CIM
    Soft-sensors and numerical filters in mineral processing

    By R. Spring

    "Soft-sensors are a computer software alternative to inadequate hardware instrumentation. Filters are averaging methods that reduce the noise in any sensor's signal. This paper introduces these t

    Jan 1, 1992

  • CIM
    The Anode Department of the Noranda Smelter

    By W. B. Boggs

    Part 1 Originally, the copper produced at the Noranda ?smelter was shipped in the form of blister bars to the Laurel Hill refinery of the Nichols Copper Co., New York. In 1930 a refinery was built at

    Jan 1, 1932

  • CIM
    Determination of Bottom Hole Pressure in a Flowing Gas Well

    By Frank W. Cole, Sharanjit S. Dhillonn

    A new method has been developed for calculating flowing bottom hole pressure in a gas well, using as a basis the general energy equation. Fundamentally, the method shows that a plot of flowing pressur

    Jan 1, 1960

  • CIM
    Agglomeration heap leaching of precious metals

    By J. A. Eisele, D. L. Pool

    "The Bureau of Mines has developed a particle agglomeration technique to improve the flow of leaching solution through heaps of low-grade gold-silver ores which contain clays. Benchscale experiments a

    Jan 1, 1987

  • CIM
    The exothermic behavior of intermetallic reactions in the assimilation of manganese additions in liquid aluminum

    By K. Sun

    The exothermic behavior of the intermetallic reactions inside an Al-Mn metallic powder compact and its assimilation fundamentals in molten aluminum were examined. In this study cylindrical compacts we

    Jan 1, 2004

  • CIM
    A Lining Design Method Consistent With NATM for Deep Shafts

    By Xiao min Zhou, Yan Xu, Hongzhen Liang, Xiaonan He

    "With the increase of shaft excavation depth, the thickness of the shaft lining increases sharply. It is difficult to reduce thickness of lining effectively by improving high-strength concrete perform

    Jan 1, 2019

  • CIM
    Concentrate Leach Plant Startup, Operation and Optimization at the Phelps Dodge Bagdad Mine in Arizona

    By John C. Wilmot, Robert E. Brewer, Royce J. Smith

    In March 2003, Phelps Dodge started up an innovative pressure leach facility for processing copper concentrates at the Bagdad mine in Arizona. This paper describes the development of the concentrate l

    Jan 1, 2004

  • CIM
    Fire in No. II South, No. 26 Colliery, Glace Bay

    By W. Leblanc, J. Phalen

    This paper tells the story of a serious mine fire on a mechanized longwall face in a submarine coal mine at Glace Bay, Nova Scotia. The story gives, in chronological order, a technical account of the

    Jan 1, 1976

  • CIM
    Dust Research 1n West Germany

    By T S. Cochrane

    This paper is based on observations made during a recent visit by the writer to three of the dust research laboratories .in West Germany, each .of which is mainly concerned with studymg the compositio

    Jan 1, 1964

  • CIM
    An Electrochemical Study of the Dissolution of Chalcopyrite in Ammonia-Ammonium Sulphate Solutions

    By M. J. Nicol, T. Moyo

    Ammoniacal solutions are an effective lixiviant for the oxidative dissolution of some mineral sulphides. A detailed study of the anodic dissolution of chalcopyrite in ammonium sulphate-ammonium hydrox

    Jan 1, 2014

  • CIM
    Dam construction and utility corridor relocation in pit at Syncrude Canada Ltd.

    By Robert Cameron, Colin Ashton, John MacNeil, Leo Piciacchia

    "The in pit dam construction and utilities relocation, known as the East Mine Corridor Relocation (EMCR) project, was developed to extend the life of the east side of the Base Mine pit by two veal&apo

    Jan 1, 1995

  • CIM
    MDS Analysis of Film Stability and Bubble Attachment at Selected Mineral Surfaces

    By J. Jin, J. D. Miller

    "Bubble attachment at hydrophobic surfaces is of critical importance in the flotation recovery of mineral resources and fundamental experimental results have been reported in the literature describing

    Jan 1, 2016

  • CIM
    Advancing the New Afton Copper-Gold Project

    By Kevin Ross

    Feasibility Study Team Processing / Engineering?Hatch, Vancouver Mining / Reserves?Australian Mine Consultants, Brisbane Geology / Resources?Roscoe Postle Associates, Vancouver Environmental / Per

    May 1, 2006

  • CIM
    Shear Strength Assessment of a Footwall Slab Using Finite Element Modelling

    By Navid Bahrani

    Overview ? Case history of footwall slab failure ? Procedure used to build a finite element model ?? Pre- and post- mining topography ?? Slab geometry ?? Excavation stages ?? Input parameters ?

    May 1, 2008