Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Integrating Blastholes into Exploration Data to Improve Coal Recovery and ModellingBy H Stedman
Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c
Aug 18, 2014
-
PIMS ù The Road to Efficient, Cost-Effective Plant OperationBy D Hunter
A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i
Jan 1, 2003
-
MEMS – The Mine Event Management System: a process to assist with incident managementBy B Stewart
It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi
Apr 16, 2024
-
Sampling and Analysis Experiments with Victorian Brown CoalsVictorian brown coals occur in massive deposits, the quality of which is determined in the first instance by means of samples taken from exploratory bores. As a number of important utilisation char
Jan 1, 1976
-
Sensors and automation – a unique opportunity to leverage real-time gold recovery data through data analysis and automation in gold processingBy S Gray
Based on the 2021 Volume 5 State of PlayTM mining survey of key executives and board members in the mining sector, the key responses to ‘Which of the following technologies will have the biggest impac
Aug 24, 2022
-
Dispersion Patterns of Metals with Sedimentary Rock-Hosted Precious Metal Deposits: Exploration Guides in Arid Terrains of the United and ChileBy Percival T. J
Precious metal deposits containing fine-grained disseminated or dispersed gold-silver form by reactions between metal-bearing hydrothermal fluids and sedimentary host rocks. Host rock permeability
Jan 1, 1988
-
Chromite and Platinum-group Elements Coprecipitation by Crustal Contamination or Magma Mixing Revisited – Genetic and Exploration ImplicationsBy S A. Prevec
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Traditional models employed to genetically link associated chromite and platinum-group elem
Mar 18, 2015
-
Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value ChainBy M Noppe, I Glacken
There are many critical nodes along the mine value chain, from orebody to mineral product, and inter-disciplinary input is required to analyse the variability and uncertainty at each node in order to
Jan 1, 2002
-
Meta incident analysis – an analysis of incident and near miss reporting within a major Australian commodity portBy A Fern, A Hawkes, o, W Smith, K Mee
Serious Injury and Fatality (SIF) prevention remains a priority focus within high-risk industries sector. A major mining operation sought to strengthen their approach to the management of high-risk ac
Apr 16, 2024
-
Integrating Environmental Impact Assessment into Life-of-Mine PlanningBy J Jones, J Blunt
"The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be
Jul 10, 2012
-
Factors Affecting Ground Support at Agnew MineBy Jones TRP
The Agnew Nickel Mine has a short his-tory of mining activities. However it has experienced a large variety of ground support problems. These problems relate to geological, hydrological, geomechanical
Jan 1, 1985
-
Geology and the Engineering of Safe and Effective MinesThe correct assessment and understanding of geotechnical conditions is fundamental to mine design and, hence, successful (safe and efficient) mine planning, design and operations. However, this assess
Jan 1, 2006
-
A Strategy for Mineral Industry TrainingIn order to formulate appropriate and useful education and training policies and practices, it is crucial to firstly consider the demographic environment of our workforce-and the direction in whic
Jan 1, 1986
-
Variogram of a Continuous Flow ù A Tool for Designing Sampling IncrementsBy J Koppe, J F. Costa
A fundamental error of sampling occurs when a sample is extracted from a larger mass of ore or lot. The act of sampling requires that all particles belonging to the lot have an equal chance of being e
Jan 1, 2005
-
A New Hybrid Flotation-Microfiltration CellBy P Mavros, K A. Matis, N K. Lazaridis
A large number of techniques are in use today to limit membrane fouling, among them certainly is air bubbling (which constitutes the transport medium in flotation) as applied in wastewater treatment;
Jan 1, 2005
-
Experience With Tyres And Tyre Chains On Underground Loaders At Kng Island ScheeliteEvaluation of tyre chains has been taking place at King Island Scheelite for several years. Results indicate that tyre life has been greatly improved in all cases. Good cost sav- ings are resulting
Jan 1, 1977
-
Challenges Facing the Australian Gold IndustryIt would be a good thing when reviewing the challenges to be faced by the Australian gold industry to set the backdrop and scene for them, by briefly examining the history of this vital and dynamic in
Jan 1, 2000
-
Acid Rock Drainage Management at the Ok Tedi Mine, Papua New GuineaBy H Kundapen, J J, C Rumble, S Miller
This paper describes measures taken by Ok Tedi Mining Limited (OTML) to minimise the risk of acid rock drainage (ARD) resulting from mining operations at its Mt Fubilan porphyry copper-gold mine in th
Jan 1, 2003
-
Driving Through Broken Ground. Standard Method Adopted at Central Mine, Broken HillOwing to the 'creeps' and consequent movements in the mines, followed by the recent fire in the southern workings, the whole of the orebody above the 800 ft. level is now very much crushed
Jan 1, 1932
-
Measured Resources and Proven Reserves – Are they still Relevant?By S Juras
The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine
Aug 22, 2011