Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Uranium Exploration in Australia

    Uranium minerals were found in Australia as early as 1869, but it was not until the 1940's that a search specifically for uranium was begun. Instrument types and techniques used in early explora

    Jan 1, 1970

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016

  • AUSIMM
    Incorporation of ore sorting into a proposed greenfields tin mining and processing project in Morocco

    By A N. Parry

    In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm

    Nov 10, 2020

  • AUSIMM
    Effect Of Ore Pulp On The Adsorption Rate Of Gold Cyanide On Activated Carbon

    By Linge H. G

    The effect of the presence of ore pulp on the adsorption rate of gold on activated carbon has been studied. A substantial reduction in the rate occurs when the pulp is present. The reduction in ra

    Jan 1, 1987

  • AUSIMM
    Pilot Plant Scale Leaching of Zinc From Angouran Plant Flotation Thickener Overflow Using Sulfuric Acid

    By S Moradi

    The thickener overflow of zinc concentrate, obtained from flotation process in the Angouran plant located in Iran, contains a large quantity of slimes which were transferred to the tailing ponds. Thes

    Jan 1, 2004

  • AUSIMM
    The Exploration for and Economic Appraisal of Asbestos

    Asbestos is a commercial term applied to fibrous varieties of several minerals, the properties of which are not generally appreciated by the majority of geologists. A thorough knowledge of these pro

    Jan 1, 1971

  • AUSIMM
    Challenges in achieving zero harm – lessons from past incidents in mining

    By K M. Cook, D Clark

    Fatality prevention and zero harm are key focus areas for resource companies. However, they remain an ongoing challenge for high hazard industries, including the mining sector. As one example the late

    Apr 16, 2024

  • AUSIMM
    Linking the Values of Water to Sustainability

    The value of water is defined by its marginal utility. Challenges arise where the marginal utility is difficult to estimate. Therefore, when two or more interested parties wish to access water and the

    Jan 1, 2006

  • AUSIMM
    The Evaluation Of Borehole Data In Relation To Open-Pit Coal Mine Design

    Proper technical appraisal of a coal deposit and the determination of optimum open- pit mine design can only be made after detailed examination of a number of interrelated geographical and geologica

    Jan 1, 1977

  • AUSIMM
    Australian LPG Through the Eighties

    Australia has been a major exporter of LPG since production from the Bass Strait fields commenced in 1970. Export levels have been maintained through the seventies, the bulk of material being deliv

    Jan 1, 1982

  • AUSIMM
    The Design, Installation, and Management of Computer-Based Process Control Systems in the Metalliferous Industries

    The sudden. explosion of relatively inexpensive digital process control computers has accelerated interest in the possibilities of economic savings by their use. In particular the metalliferous in

    Jan 1, 1977

  • AUSIMM
    Backfill for Bench Stoping Operations

    By K Kuganathan

    This paper describes a new methodology that can be applied to compare several bench extraction strategies requiring backfill. The method is applicable at the planning or operational stages and can be

    Jan 1, 1998

  • AUSIMM
    CanadaÆs Program for Innovations in Mining Technology in the 21st Century

    The Canadian mining industry was in turmoil in the early 1980s. The post-war era based on reconstruction faded away after the high demands for minerals in the 1950s and 1960s. Also, the industry ha

    Jan 1, 1988

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Coal Pillar Design Issues in Longwall Mining

    Coal pillar design has been based on generalised formulae of the strength of the coal in a pillar and experience in localised situations. Stress measurements above and in coal pillars indicate that th

    Jan 1, 1998

  • AUSIMM
    Electrochemical Polarisation ù Technologies and Services

    By S Totsuka, P Ortiz, E Prokkola

    Electrochemical polarisation techniques can be successively applied to maintain clean surfaces in process environments. The applications are the result of extensive knowledge of the electrochemical na

    Jan 1, 2004

  • AUSIMM
    The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines Limited

    In the- past, at Great Boulder Gold Mines Ltd,, ,' s.. number of attempts ' ha'tre been made to remove water ' `solublo copper and' iron sa'lt's from calcined pyri

    Jan 1, 1964

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Contract Mining Lihir Gold Mine

    Lihir Gold Mine is situated in a dormant volcanic caldera on a small island off PNG. Not æextinctÆ but dormant. Current ground temperatures are up to 150 degrees Celsius with active geysers in the wor

    Jan 1, 1999