Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Gallery Stoping at Gold Resources Paringa Operations

    Gallery Stoping, an old but little used stoping method, has been reintroduced to workings at the Paringa South Shaft.Orebodies which are amenable to such a method are being mined in this manner with c

    Jan 1, 1985

  • AUSIMM
    Studies on Extraction of Refractory Gold and Silver Through Thiourea Leaching

    By Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R

    The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam

    Jan 1, 1992

  • AUSIMM
    New Rosebery - Discovering the Next 20 Years

    Rosebery Mine is situated on the west coast of Tasmania and is AustraliaÆs largest volcanic-hosted base and precious metals deposit (zinc, lead, copper, gold and silver). The milling operation has bee

    Jan 1, 2008

  • AUSIMM
    The Development of an Ore Reserve Methodology for the Olympic Dam Copper Uranium-Gold Deposit

    The accuracy of an ore reserve is only as good as the geologist's understanding of the deposit. The methods that are applied to resource and reserve estimation reflect that understanding. At th

    Jan 1, 1987

  • AUSIMM
    A Case For Coal Mining Research In Australia

    The Bowen Basin coal field is an important energy resource. A relatively small proportion is avail- able by open cut operations. Responsible men throughout the world have warned of the need to incr

    Jan 1, 1976

  • AUSIMM
    Managing the flotation response of pyrrhotite from Cu-Ni-PGM ores using process water of a degrading quality

    By M S. Manono, K C. Corin

    The optimisation and process developments surrounding the beneficiation of Cu-Ni-PGM ores is of fundamental importance when considering the continued rise in global demand for these precious metals. T

    Aug 24, 2022

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    Preliminary 3D geological model and structural analysis of the Neoarchean to Palaeoproterozoic Hamersley Basin, Pilbara, Western Australia

    By D McB Martin, A Piechocka, M Jessell, M Lindsay, E Ramanaidou

    The Hamersley Basin of Western Australia, approximately 500 km long by 200 km wide, is recognised globally for its rich endowment of iron ore resources. Two types of bedded iron ore mineralisation are

    Nov 8, 2021

  • AUSIMM
    Iron Sinter Process Control Using X-ray Diffraction

    By U König, N Norberg

    Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,

    Jul 13, 2015

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Studies on Alternate Routes for Extracting Copper from Chalcopyrite Concentrates

    By Jena P. K

    Smaller deposits of high grade chalcopyrite or the concentrates of low grade and complex copper bearing ores, can be subjected to extraction processes other than smelting and converting. Low tempera

    Jan 1, 1992

  • AUSIMM
    Dependence of the variance of lot average on the sampling mode and heterogeneity type of the lot

    By P Minkkinen

    "Pierre Gy showed in his early works that the results in estimating the variance of the mean value of continuous lots depends on sampling mode (random, stratified or systematic), except in the theoret

    May 9, 2017

  • AUSIMM
    The challenges of producing high purity quartz

    By D Connelly

    Quartz deposits are common in nature but the presence of quartz suitable for yielding high purity quartz is exceedingly rare. This paper describes a test work study on producing high purity quartz (HP

    Sep 1, 2024

  • AUSIMM
    Development of a Sustainability Roadmap for the Kwinana Industrial Area, Western Australia

    By M John

    The Kwinana Industrial Area (KIA) is by far the largest and most diverse industrial processing region (with supporting industries) in Western Australia. As with elsewhere in Australia (and globally),

    Jan 1, 2009

  • AUSIMM
    Further investigations into the relationship between the non-ideal behaviour of a particle-collector aggregate as determined using partial molar excess Gibbs energy and its hydrophobicity

    By K C. Corin, C T. O’Connor

    In recent years it has been shown that the concept of using partial molar excess Gibbs energy (G̅ex) to explain the behaviour of collectors in the recovery of minerals can be usefully applied to expla

    Aug 24, 2022

  • AUSIMM
    Mine Development at the Whenan Shaft, Olympic Dam Project, South Australia

    The Olympic Dam Project constitutes a major resource of Copper and Uranium and has been under intensive evaluation since the discovery in 1975.A 500 metre deep rectangular shaft has been sunk into the

    Jan 1, 1985

  • AUSIMM
    Geotechnical Challenges in Narrow Vein Mining

    By J Hadjigeorgiou

    Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o

    Mar 26, 2012

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agents

    By F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld

    The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches

    Jun 19, 2024