Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987

  • AUSIMM
    Sulphide Flotation in Cassiterite Concentration Plants

    By Selby DW, Hamill J, Cauley ID, Thomas I, Thornton AJ

    The main objective of sulphide flotation in a cassiterite concentrator is to remove sulphide minerals (pyrite, pyrrhotite and sometimes chalcopyrite) from the ore prior to gravity concentration. T

    Jan 1, 1978

  • AUSIMM
    Ionic structure analysis of relaxed surface of molten oxide slags for surface tension modelling

    By M Suzuki

    Although several models for the surface tension of molten oxide slag have been proposed, suitably accurate predictions of this property are not yet possible. The surface tension, or surface excess fre

    Aug 21, 2024

  • AUSIMM
    The Mount Morgan Gold-Copper Mine Modelling 100 Years of Mining and Exploration Date

    The 250 metric tonnes of gold and 360 000 metric tonnes of copper recovered from the Mt Morgan Mine in Central Queensland justify its fame. The mine ceased operation before the advent of three-dimensi

    Jan 1, 1993

  • AUSIMM
    Overcoming the Problem of Instantaneous Outbursts of Coal and Gas in Australian Collieries

    In Australian collieries, solutions to the outburst problem must be implemented in a highly competitive environment which has a low tolerance on negative productivity effects. Solutions are only

    Jan 1, 1987

  • AUSIMM
    The Mineralogical Identification of Refractory Gold Ores by Means of the Selective Decomposition of Minerals

    By Van Deventer J S J

    The first step in the design of a process to treat a possible economic precious metal deposit should be an examination of the mineralogy of the ore. Using this and other initial tests, the extractiv

    Jan 1, 1992

  • AUSIMM
    Reconstruction Project Pechenganickel Combine Metallurgical Operations

    By B Lindqui, M V. Knyazev, L S. Tsemekhman

    Gipronickel Institute JS that is a Research and Development Centre affiliated to the worldclass Norilsk Nickel Mining and Metallurgical Company, and Outokumpu Technologies AB (Boliden Contech AB) have

    Jan 1, 2004

  • AUSIMM
    Some Factors Influencing the Design of a Coal Preparation Plant

    Before commencing design of a coal prepar ation plant, it is essential to have detailed information of the raw coal to be treated to- gether with a clear understanding of the products required. Pred

    Jan 1, 1974

  • AUSIMM
    Slurry Loading Of Ironsand Concentrate At Taharoa

    By Gadd D. E

    Since October 1972, New Zealand Steel Mining Ltd has loaded around 10 million tonnes of ironsand concentrate from single-point mooring buoys located off-shore at Taharoa on the west coast of the No

    Jan 1, 1980

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016

  • AUSIMM
    Mining The Thick Seams Of The South Maitland Coalfield, N.S.W.

    The thick coal seams of the South Maitland field are the only ones in New South Wales which have been worked extensively to heights beyond 3.8 m (nominal "thin" seam height). Under shallow cover o

    Jan 1, 1976

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Northland Halloysite ù Past, Present and Future

    By S Marsters

    Imerys Tableware New Zealand Limited has mining rights to four deposits of halloysite, which are located about 203 km north of Auckland, New Zealand. These primary deposits were formed by the hydrothe

    Jan 1, 2002

  • AUSIMM
    Design Risk Management at Mt Leyshon Gold Mine

    The Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet

    Jan 1, 1994

  • AUSIMM
    A Proposed Copper Metallurgical Process

    The writer had the pleasure of several months' laboratory tests on a metallurgical process for copper ores devised by Mr. W. H. Corbould, Consulting Engineer, North Queensland. Mr. Corbould'

    Jan 1, 1921

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - A Tried and Tested Alternative to Trucks

    By A Cooper

    The current financial climate has given rise to fears that falling mineral prices and tight credit will force mining companies to cut back on production and new project development in a bid to cut cos

    Jan 1, 2009

  • AUSIMM
    Trends in Geophysics

    Geophysics is playing an increasingly important role in the exploration industry. In the soft rock scene the application of seismic techniques is basically mandatory prior to any drilling program. Sim

    Jan 1, 2000

  • AUSIMM
    Geostatistical Analysis Of 18cc Stope Blcok, C.S.A. Mine, Cobar, N.S.W.

    By Leach B. G

    A geostatistical study was made of diamond drill hole intersections within 18CC stope block at the C.S.A. Mine, Cobar, N.S.W. The stope block is located in 18CC orebody which is a massive sulphide

    Jan 1, 1979