Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Three Dimensional Shape Measuring by Scanning of Ultrasonic Range Finder

    By Higuchi K

    For the mechanisation or automation of mining, recognition of the shape of mined cavities is basic information. A three dimensional shape measuring system, developed and tested, includes an ultrasonic

    Jan 1, 1991

  • AUSIMM
    Horizontal Overburn Blast at Ulan Coal Mines

    By Tucker A. J

    An overburden blast utilising horizontal blast holes was successfully attempted at the Ulan Coal Mines during December 1991. The blast reduced operational problems and costs and improved dragline prod

    Jan 1, 1992

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    Selective Mining Techniques - Telfer

    The Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini

    Jan 1, 1986

  • AUSIMM
    Sedimentological Evaluation of Placer Deposits

    Measurable physical characteristics of placer deposits include both fluvial sedimentological features and their related heavy mineral suite. These two important identifiable factors are interrelat

    Jan 1, 1986

  • AUSIMM
    Mining in Fiji

    The nation of Fiji is located the South Pacific on the æRim of FireÆ some four hours flying time from the eastern sea board of Australia. It is a tourist destination situated on the main route from Au

    Jan 1, 2004

  • AUSIMM
    Application of a Bulk Mineral Analyser to Copper Ore Analysis at Mount Isa from 1976 to 1981

    By Purvis A. H, Greenwood-Smith R, Sowerby B. D

    A nuclear technique for the determination of copper and nickel in bulk samples and drill core has been developed at Lucas Heights andfield-tested at Mount Isa. The technique, which is highly specific

    Jan 1, 1984

  • AUSIMM
    Resource Saving Technology of Comminution

    By Yeliseyev AK, Shestakov AM

    Comminution is the most power-intensive process in the technology for ferrous quartzite concentration. That is why improving comminution efficiency leads to the most appreciable economic effect on

    Jan 1, 1993

  • AUSIMM
    Petrochemical Variations of Island Arc's Andesites (Kurile Island Arc)

    The problem of comparison of island arc's andesites in terms of petrochemical data is exa- mined. It is definitely established that only two main factors exist controlling the petroche- mical v

    Jan 1, 1987

  • AUSIMM
    Soft Ground Tunnelling in Melbourne - Investigation and Design of the Melbourne Main Reliever

    By M Dixon, T OÆShannessy

    Melbourne Water (MW) is responsible for a section of existing gravity trunk sewer servicing the Melbourne central business district, Docklands, Port Melbourne and other adjacent areas, known as the Me

    Jan 1, 2008

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Structure of the Integrated Mine Control System at Kemi Chrome Mine

    By Toivanen R-M, Leinonen O, Pekkarinen H

    This paper presents developments in designing an integrated mine control system at Kemi mine. The aim of this paper is to present the general structure of the system and to outline some features of

    Jan 1, 1998

  • AUSIMM
    An On-Line Conveyor Burden Measurement System Using Computer Imaging Techniques

    By Tyson G. R

    A novel system has been developed using computer imaging techniques to make on-line measurements of material on a moving conveyor. Meas- urements of the mass or volume of conveyor materials are impor

    Jan 1, 1989

  • AUSIMM
    Arsenic Removal from Copper Electrolytes by Solvent Extraction

    By Armstrong RW, Middlin B

    The development, design, construction and operation of the new Solvent Extraction/BCA process plant at Copper Refineries Pty. Ltd., Townsville is described.The process offers substantial savings in el

    Jan 1, 1985

  • AUSIMM
    The Development of the In Stream Analysis System as used at Z.C. Mines

    By Freeman NV

    The concept of an in stream analysis probe was developed at The Zinc Corporation (now Z.C. Mines) in the late 1960's and commercialised quite rapidly, by Phillips and then AMDEL, as an alternat

    Jan 1, 1988

  • AUSIMM
    The Reduction of Zinc Oxide

    By Hayes P. C

    The reduction of small, dense zinc oxide (ZnO) samples in CO/CO2, and CO/N2 gas mixtures has been investigated at temperatures between 900 and 1100¦C. The microstructural characterisation of the rea

    Jan 1, 1991

  • AUSIMM
    The Cornish Miner in South Australia

    The appearance of the Cornish miner in South Australia was, in the simplest terms, the result of resource development economics. In Cornwall in the middle of the 19th century tin and copper mining

    Jan 1, 1987

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed

    Jan 1, 1995

  • AUSIMM
    Cunning Solutions to Process Improvement

    By T J. Napier-Munn

    This paper proceeds from the premise that process improvement is a key part of the mineral engineer’s role, and one in which he/she can make a significant contribution to shareholder value. It present

    Sep 1, 2014