Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pit Slope Management ù Planning for Your Next Failure in Open Cut Mining

    It is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge

    Jan 1, 2003

  • AUSIMM
    HellyerÆs Exploration Development

    By Viney K. G, Molinia A. B

    The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early

    Jan 1, 1988

  • AUSIMM
    Slope Stability Investigations at the Mt. Whaleback Iron Ore Mine, Western Australia

    By Trudinger JP

    Mt. Newman Mining Company Pty. Ltd.3 oper ates the Mt. Whaleback iron ore mine in the Ham- ersley Iron Ore Province of Western Australia. The present rate of production of high grade hematite iron o

    Jan 1, 1975

  • AUSIMM
    Influence of Pack Design Upon Gateroad Deformation in Soft Floor Conditions

    By Payne AR

    The high cost of gateroad repairs and maintenance in U.K. longwall coalmining is a clear indication of the failure of permanent support systems to fulfill their prime function, i.e. control of str

    Jan 1, 1986

  • AUSIMM
    Composition of Fluid Inclusions from the Hellyer and Mt. Chalmers VHMS Deposits, Australia: Implications for Source of Ore-Forming Fluids

    By Ryan CG, Both RA, Mernagh TP, Large RR, Hunns SR, Gemmell JB

    The Hellyer and Mt. Chalmers deposits are mound-style volcanic-hosted massive sulphide (VHMS) deposits in Australia. Textural, petrographic and microthermometric investigations of fluid inclusions in

    Jan 1, 1995

  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    The Application of Special Stainless Steels in the Smelting and Refining of Non Ferrous Metals

    By Bukovinsky SB

    The smelting, refining and hydrometallurgical operations practised in the winning of non-ferrous metals are associated with severe aqueous and high temperature corrosion problems.With the increasing c

    Jan 1, 1985

  • AUSIMM
    The Importance of Rock Breakage Technology to the Future of Underground Space in Australia

    Underground space can be defined as space below natural ground level which can be used as an alternative to an above ground location. While many of our above ground structures inherently involve und

    Jan 1, 1995

  • AUSIMM
    The Effect of Sulphur on the Rate of Reduction of Zinc Oxide from Slag

    By Ranklin W. J

    The mechanism and rate-limiting step of carbonaceous reduction of zinc from slags was investigated in the laboratory. Disks of graphite were rotated in ZnO-containing slags at various speeds for fix

    Jan 1, 1993

  • AUSIMM
    Full-Scale Testing of the PCF Rock Excavation Method

    A small-charge rock excavation method based upon the Penetrating Cone Fracture (PCF) technique has been demonstrated to be capable of excavating the hardest of rocks. The PCF technique involves drilli

    Jan 1, 1993

  • AUSIMM
    Analysis of Ball Mill Overload Condition at Bougainville Copper Ltd.

    It is important to prevent the overload ing of mills being operated near maximum tonnage. Changes occurring during overload differ in their usefulness as guides to control action. The Primary Ball

    Jan 1, 1978

  • AUSIMM
    Influence of Distorted Blasthole Patterns on Fragmentation as well as Roughness of, and Blast Damage behind, Remaining Bench Face in Model-scale Blasting

    By P Moser, R Ivanova, F Ouchterlony

    This paper describes model-scale bench blasts on mortar blocks with distorted drill hole patterns, done in 2013–2014 at the Montanuniversitaet Leoben. The main aim of the project is to see if the frag

    Aug 24, 2015

  • AUSIMM
    Models for Subsurface Sulphide Ore Generation: Recent Uzon Caldera Hydrothermal System in Kamchatka as Example

    This paper considers two particular empi- rical models for the processes of the generati- on of hydrochemical zoning and epithermal near- surface mineralization of mercury-antimony-arse- nic formation

    Jan 1, 1987

  • AUSIMM
    Coal - Paper No. 8 Use Of Optimal Techniques To Minimise Moisture Retension In Fine Coal Filtration

    By Sergeant G. D, Norman J. R

    The importance of reducing the moisture content of fine coal, the nature of the retained water and the means of its removal are discussed. A statistical technique, using a balanced block design, was

    Jan 1, 1969

  • AUSIMM
    Geohydrological Containment System and Microbial Water Treatment Plant for Metal-Contaminated Groundwater at Budelco

    By Buisman C. J N, Koch R. O

    Soil and groundwater beneath the Budelco zinc production plant at Budel-Dorplein (The Netherlands) are contaminated with metals and sulphate. To avoid contamination of nearby drinking water aquifers

    Jan 1, 1993

  • AUSIMM
    Tick Hill Gold Mine - Development and Operation

    The Tick Hill Gold Mine is situated approximately 110 kilometres south of Mount Isa, and 14 kilometres north of the township of The Monument. It was discovered in October 1989 by Mount Isa Mines Explo

    Jan 1, 1993

  • AUSIMM
    CSAMT Surveys, An Investigative Tool for Detailed Evaluation of Glass EarthÆs Epithermal Gold Targets in the Central Volcanic Region, North Island, New Zealand

    Controlled Source Audio Magnetotelluric (CSAMT) surveys were carried out by Glass Earth (New Zealand) Limited (Glass Earth) in 2006 - 2007 to investigate epithermal gold targets in the central North I

    Jan 1, 2007

  • AUSIMM
    Major Wear Parts in a Continous Copper Rod Plant and their Effect on Operations

    By Murphy MW, Klaric SD

    The history, operation and design of the Secor continuous rod production process is described. The effective operation of the plant is influenced by accurate monitoring and control of molten metal pro

    Jan 1, 1985

  • AUSIMM
    Feature if the New Lead Refinery at Port Pirie

    A new lead refinery with a. capacity of 230,000 tons per year com-menced operation at*Port'Plsie in October, 1959. This plant' superseded the refinery which had operated from 1933 with the a

    Jan 1, 1963

  • AUSIMM
    Impurity Removal in the Reverse Flotation of Iron Ore

    By M Ma, W J. Bruckard, C Gontijo, R Holmes

    Vale is the largest iron ore producer in the world. Since the 1970s, Vale has been using reverse cationic flotation to remove siliceous impurities from its iron ores. Whilst this flotation process has

    Aug 12, 2013