Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist InstallationThe hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista
Jan 1, 2005
-
Review of Trailings Dam Design and Construction Techniques in North AmericaThere are many factors influencing the way in which a mining company disposes of tailings. Some of the more important factors include physical and chemical properties of tailings, cost, availabilit
Jan 1, 1989
-
Elaine Dorothy Cu-Au (REE-U) Skarn DepositBy P Sha
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia
Mar 18, 2015
-
Platinum Mining and Sustainability - Understanding the Environmental Costs of Future TechnologiesBy G M. Mudd
The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain
Jan 1, 2009
-
Parameters Affecting the Shield Support Efficiency in Longwall MiningBy Hsiung SM, Jiang YM
The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of
Jan 1, 1988
-
Modern By-Product Coke Oven PracticeAlthough forty-seven years have passed since the by-product coke oven made its successful commercial appearance, it is only during the past fifteen or twenty years that this system of coal carbonisati
Jan 1, 1928
-
Re-opening of Old Mines: The Intrinsic Value of Undergorund Drilling and Drifting in Mine PlanningBy Frith RT, M D. Goodz
Drilling has been accepted as a major exploration tool. However its use in mine planning and development has been overlooked.This need for drillhole data was highlighted during the redevelopment boom
Jan 1, 1990
-
Application of the ISAMILL (A Horizontal Stirred Mill) to the Lead-Zinc Concentrator (Mount Isa Mines Ltd) and the Mining CycleBy B Cronin, M Gao, M F. Young
Fine grinding technology has become extremely important for Mount Isa Mines Limited in the last decade for flowsheet development for the McArthur River deposit and in rejuvenating the Lead-Zinc Concen
Jan 1, 1998
-
Coke Reactions and Structural Changes in the High Temperature Region of Australian Blast FurnacesBy Coin CDA
From a study of coke samples obtained from the tuyere level of four Australian Blast Furnaces, the nature of in-furnace coke degradation has been investigated. At the periphery of the raceway is a
Jan 1, 1981
-
Smelting Practice at Olympic DamThe Olympic Dam smelter utilises Outokumpu Oy, flash smelting technology to produce blister copper direct from high grade copper concentrate.This paper describes the unit processes involved, including
Jan 1, 1993
-
Meeting Reporting Requirements for Very Low Concentration Ore ReservesOre reserve estimates form a basis for strategic mine planning at Argyle Diamonds open pit and alluvial operations. Most ore reserve statements are mainly concerned with resource tonnage and grade.
Jan 1, 1990
-
Concentration of Gold from Carbon-contaminated Residue Dumps in the Kalgoorlie AreaBy OÆNeil G. R
The gold adsorption capacity of ash-char and ion exchange resin Zerolit F.F. (I.P.) was evaluated by obtaining Freundlich isotherms in the presence of selected variables. It was found that the pres
Jan 1, 1979
-
Tools for the Development of Metallurgical ProcessesBy Gray N. B
The need to improve existing metallurgical processes and to develop new processes to meet the economic challenges that lie ahead requires the application of the tools of process analysis viz. mathemat
Jan 1, 1985
-
Wall Control BlastingBy D P. Blair
There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential
Aug 24, 2015
-
The Initiation of Bulk Explosives by PrimersNumerical simulation by a finite element computer code has bee* used to identify key stages in the initiation of confined bulk explosive by cast primers. The simulations have been verified by compar
Jan 1, 1990
-
Development of the Primary Ventilation System at Mount Isa: I. Mining ConsiderationsDuring the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the
Jan 1, 1967
-
Matte Fuming of Tin from Sulfide Concentrates Containing Tin and CopperRecovery of tin and copper from concen trates containing cassiterite, stannite and chalcopyrite was studied in laboratory-scale tests designed to simulate continuous operation of the matte fuming p
Jan 1, 1980
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
The Growing importance of Gold in Eastern AustraliaThe 1980's have produced an outstanding revival of the Australian gold industry. In contrast to some previous mining booms, the economic aspects of the growth in gold production are soundly
Jan 1, 1987
-
On-Stream Analysis and Sensors for Mineral ProcessingBy Mathew P. J
The CSIRO Division of Mineral and Process Engineering in Melbourne has been developing on-stream analysis sensors based on neutron and gamma radiation for better control of quality and process opera
Jan 1, 1991