Search Documents

  • IIMP
    Proceso de OSMOSIS inversa en MYSRL como una nueva alternativa en el tratamiento de efluentes

    By Miguel Pimentel

    El presente trabajo describe el proceso implementado por la minera Yanacocha para el tratamiento de las aguas de exceso a través de la Tecnología de Membranas (EMS- Engineered Membranes System) o proc

    Sep 12, 2005

  • SAIMM
    Copper Recovery Using Leach/Solvent Extraction/Electrowinning Technology: Forty Years Of Innovation, 2.2 Million Tonnes Of Copper Annually

    By G. A. Kordosky

    The concept of selectively extracting copper from a low-grade dump leach solution followed by stripping the copper into an acid solution from which electrowon copper cathodes could be produced occurre

    Jan 1, 2002

  • SME
    Continuous Surface Mining Equipment: How to Achieve Success

    By Edward DeLilla

    For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to increase productivity, lower operating costs and minimize

    Jan 1, 1994

  • AUSIMM
    Research into Alluvial Gold Recovery in Alaska and the Yukon Territory

    Alluvial gold mining is thriving in the Yukon Territory and Alaska. The scale of many operations is similar to those in New Zealand but there is greater government support for research and test work.

    Jan 1, 1989

  • NIOSH
    Fatal And Nonfatal Injuries: MSHA Data

    This chapter presents an overview of fatal and nonfatal injuries reported to MSHA during 1986-1995. Reportable injuries follow the criteria for reporting specified in 30 CFR 50. These criteria are lis

    Jan 5, 2000

  • AIME
    Iron and Steel Division - Reduction Kinetics of Magnetite in Hydrogen at High Pressures

    By W. M. McKewan

    Magnetite pellets were reduced in flowing hydrogen at pressures up to 40 atm over a temperature range of 350° to 500°C. The rate of weight loss of oxygen per unit area of the reaction surface was foun

    Jan 1, 1962

  • NIOSH
    RI 7173 A Petrofabric Study Of Tectonic And Mining-Induced Deformations In A Deep Mine

    By Elbridge W. Gresseth

    Rock deformational structures in a deep mine were analyzed by petrofabric techniques to learn (1) the relative magnitude and direction of the principal stresses involved in tectonic deformations prior

    Jan 1, 1968

  • AUSIMM
    Disparate Tectonic Settings for Mineralisation in an Active Arc, Eastern Papua New Guinea and the Solomon Islands

    By C Spandler, S W. Richards G Rosenbaum, R J. Holm

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The recent and active magmatic arcs of eastern Papua New Guinea (PNG) and the Solomon Island

    Mar 18, 2015

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • AIME
  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • AUSIMM
    North Island Epithermal Gold: Processes of Mineralisation

    By J V. Lawless

    Mineralisation processes in epithermal deposits in the North Island of New Zealand are best illustrated by considering the two most productive deposits: Waihi and the Thames Bonanza Zone (TBZ), which

    Jan 1, 1997

  • DFI
    Economic Foundation Design For Tall Buildings

    By Frances Badelow

    This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o

    Jan 1, 2006

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • SAIMM
    Comparison Of Globoid And Cylindrical Shearer Drums? Loading Performance

    By M. Ayhan

    Drums of a modern longwall shearer are manufactured to include various constructional features conveying extracted material onto the face conveyor as efficiently as possible. Designing a drum with a c

    Jan 1, 2006

  • AIME
    Proceedings of the Ninety-Third Meeting, Toronto, Canada, July, 1907

    By WILLETT G. MILLERS

    GENERAL RECEPTION COMMITTEE.-Willett G. Miller, Chairman; F. G. B. Alan, Hon. Frank Cochrane, Eugene Coste, Thomas W. Gibson, Cyril W. Knight, J. C. Murray, 0. N. Scott, Alan Sullivan, J. B. Tyrrell,

    Sep 1, 1907

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • AIME
    Part IX – September 1969 – Papers - Microstructure and Flow Stress of Aluminum and Dispersion-Strengthened Aluminum Aluminum-Oxide Products Drawn at Room Temperature

    By Niels Hansen

    The substructure formed by drawing at room temperature in aluminum (99.5 and 99.998 pct purity) and in recrystallized aluminum aluminum-oxide products containing from 0.2 to 4.7 wt pct of aluminum -ox

    Jan 1, 1970

  • NIOSH
    OFR-52-81 Wallrock Reactions To Mining Beyond A Preconditioned Zone At The Star Mine, Burke, Idaho

    By Wilson Blake

    Rock preconditioning in advance of mining was shown to be an effective means of rock-burst control based on the results of a field demonstration carried out on the 7700 level of the Hecla Mining Compa

    Jan 1, 1980

  • SME
    Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System

    By Jean-Pierre Nossereau, Allen J. Hulshizer

    The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in

    Jan 1, 1981