Search Documents

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • SME
    Bleeder Entry Evaluation Using Condition Mapping and Numerical Modeling

    One of the most common critical areas of longwall mining in terms of ground stability are the gateroad and bleeder entries. These critical entries provide much-needed safe access for miners and allow

    Jan 7, 2020

  • IMPC
    Bioremediation Of Pb (II) Ions From Aqueous Solution Using Pseudomonas aeruginosa

    By S. Vimalnath

    The bioremediation capability of Pseudomonas aeruginosa cells was investigated for the biosorption of lead ions from aqueous solution. The various parameters such as pH, kinetics, biomass loading and

    Sep 1, 2012

  • AIME
    Technical Notes - Textures in Cold Rolled Copper and 70-30 Alpha Brass

    By W. R. Hibbard

    T has been proposed1 on the basis of slip and flow I- that the ideal deformation texture of cold rolled face-centered cubic metals is (110) [112]. As pointed out recently by Brick,' this theory d

    Jan 1, 1951

  • ISEE
    Particles Size Distribution by Static Loading and Fragmentation Using Explosive

    By V. A. Akinbinua

    This work is intended to examine the relationship between rock fragments produced during compression tests using a soft testing machine, e.g. hydraulic press (the machine used in this work is Amlser r

    Jan 1, 2014

  • SME
    GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?

    By Antonio De Biase

    In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t

  • DFI
  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • NIOSH
    Experimental - Laboratory Procedures - Reconstructed Soil Samples

    Most laboratory sealant studies were carried out in 2.0 inch I.D. Plexiglas tubes of 9.0 inches height containing 4.0 to 4.5 inches reconstructed soil from an 0-8 or 8-16 inch soil horizon at the Lans

    Jan 1, 1972

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • SME
    Carbon Neutral, Energy Efficient Method For Gas Production From Methane Hydrates

    By T. Yegulalp, M. Castaldi

    As global energy demands increase, there will be a critical need to employ fuels that have minimal environmental impacts. While hydrogen is considered the ultimate fuel for that purpose, hydrocarbon

    Jan 1, 2007

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • SME
    Hobson And Rosedale Tunnels?New Technology In Auckland

    By Harry Asche

    The last 12 months has seen the construction of the first Earth Pressure Balance (EPB) TBM excavated tunnel in New Zealand on the Project Hobson sewer storage tunnel for Watercare Services Limited, wi

  • AUSIMM
    Tube bundle integrity testing methodologies

    By L Forrester

    The tube bundle system is an integral part of an underground coalmine’s gas monitoring system. The maintenance of these systems is vital to ensure the quality of the data produced. Integrity testing o

    Aug 28, 2017

  • SAIMM
    Evaluation Of Elastic Deformation Energy In Stone Cutting Of Portuguese Marbles With A Diamond Saw ? Synopsis

    By P. Falcão Neves

    A detailed analysis of the geomechanical behaviour in rock cutting with a diamond saw is provided to obtain a better understanding of the mechanisms involved in the process. The energy of elastic def

    Jan 1, 2012

  • NIOSH
    Numerical Models And Hardware Dummies For Simulating Whole-Body Vibration Of Human - An Overview - Introduction

    By Horst Peter Wölfel

    The goal of biodynamic models is to simulate the vibration behaviour of the human body. In combination with experimental studies biodynamical models can be a powerful tool for the analysis of the effe

    Jan 6, 2006

  • SME
    Analysis Of Recirculation In Booster Fan Systems Using CFD

    By J. M. Wempen

    Booster fans, large underground fans, can increase the volumetric efficiency of ventilation systems by helping to balance the pressure and quantity distribution throughout a mine, reducing leakage and

    Feb 27, 2013

  • CIM
    Reduction of Arsenic Releasing In Aqueous Environment by Scorodite Encapsulation

    By S. D. F. Rocha1, L. Katsarou, G. P. Demopoulos

    "Crystalline scorodite (FeAsO4·2H2O) has been pointed out as the most stable compound to immobilize arsenic for disposal due to its good stability performance according to EPA’s TCLP test. However, in

    Jan 1, 2012

  • SME
    Murray Basin heavy mineral strandline deposit mineralogy

    By A. W. Popp

    After forty years of exploration and development, the heavy mineral sand deposits of the Murray Basin are on the eve of substantial exploitation by Iluka Resources Limited, Southern Titanium NL and RZ

    Jan 1, 2005