Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Cut-Off Walls For Diamond Mining In The ArcticBy Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Book news1. Book reviews Tungsten: 1982. London, Mining Journal Books Ltd, 1982. 179 pp. Reviewer: G.A. Brown The geology of industrial minerals in Canada, edited by G.R. Guillet and Wendy Martin. Canadian Ins
Jan 1, 1985
-
A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron oresBy M I. Pownceby, C M. MacRae, A Torpy
Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution
Jul 24, 2017
-
Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay WallsBy Dimitris Pachakis
In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th
Jan 1, 2011
-
Barrick?s Zaldivar Mine Gets A Dome Cover Over Its StockpileThe Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (
Jan 1, 2009
-
The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond MineBy Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison
"The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr
Jan 1, 2010
-
Mining Community Sustainability and well-being in British Columbia, CanadaBy Janis A. Shandro
The mining sector is a major economic driver for Canadian, and British Columbian communities. In parallel strong commitments have been made by industry to the well-being and sustainability of associat
May 1, 2011
-
Meeting Recruiting Challenges - Victor ProjectProject Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;
May 1, 2006
-
RI 9652 - Test Results Of Collision Warning Systems For Surface Mining Dump TrucksBy Todd M. Ruff
An average of 13 mine workers are killed each year by being run over or pinned by mobile mining equipment. At surface mines, these accidents commonly involve large dump trucks that drive over a smalle
Jan 1, 2000
-
Features of the New Lead Refinery at Port PirieA new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the
Jan 1, 1963
-
Hydrothermal activity and first characterization of hydrothermal mineralization and fluids from the Southern New Hebrides Arc (Vanuatu, SW Pacific)By Florian Häckel, Ulrich Schwarz-Schampera, Benjamin Bühring, Katja Schmidt, Dieter Garbe-Schönberg, KoschinskyM Andrea
"The Vanuatu island arc and its adjacent back-arc basins form part of the southern New Hebrides subduction system in the southwestern Pacific Ocean within a triangle defined by the Solomon Islands, Ne
Sep 1, 2014
-
Development of an On-Site Mineralogy Solution for MetallurgistsBy D van der Wal, R Dobbe, K Moeller
"Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s
Jul 15, 2013
-
RI 6438 Estimated Cost of Exploiting Enriched, Hard Manganese Ore From the Maggie Canyon Deposit, Artillery Mountains Region, Mohave County, ArizBy D. A. Elkins
Design plans and detailed cost estimates of mining and treating ore from Maggie Canyon deposit by two alternative methods which can be used in the event of a sudden need to exploit this resource are g
Jan 1, 1964
-
RI 9635 - Self-Contained Self-Rescuer Field Evaluation: Fifth-Phase ResultsBy John P. Shubilla1, Nicholas Kyriazi
A joint effort by the Pittsburgh Research Center (PRC) and the Mine Safety and Health Administration (MSHA)3was undertaken to determine how well self-contained self-rescuers (SCSR's), deployed in
Jan 4, 1996
-
Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)"The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t
Jan 1, 2005
-
Impact Of Vertical Stress On Roadway Conditions At Dartbrook MineBy Ken Mills
A program of stress change and roadway deformation monitoring was undertaken to measure the forward abutment load distribution about a retreating longwall panel at Dartbrook Mine. The results of this
Jan 1, 2000
-
Performance of Model Predictive Control on the Crushing Circuit at Sishen MineBy E K. Leeka
Process control limitations have led to suboptimal performance of the crushing section of Sishen MineÆs Jig Plant. The performance of the PID (proportional-integral-derivative) controller implemented
Aug 12, 2013
-
Analysing and Rehabilitating Rock Mass Failure in Critical Mine InfrastructureTo optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and
Nov 25, 2010
-
Annual General Meeting of the InstituteThe Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 25th August, 1976. Dr R. E. Robinson, (President) was in the chair, and decla
Jan 10, 1976