Search Documents

  • AIME
    Erskine Ramsay

    ONE DAY IN the mid-1880s, in a suburb 0f Pittsburgh, Pennsylvania, there dismounted from a train the two foremost leaders of the day in the coal and steel industries-Andrew Carnegie and H. C. Frick. T

    Jan 1, 1953

  • SME
    Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

    By John F. MacDonald

    This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp

    Jan 1, 1985

  • CIM
    Dynamic Testing of Friction Rock Stabilisers

    A rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens

    May 1, 2009

  • AUSIMM
    Australian Innovations in High Pressure Grinding Rolls and Large Grinding Mill Manufacture

    By E J. Hofmann, J E. Hofmann, A J. Hofmann-Fritz

    "With its Head Quarters in Perth, global heavy engineering company Hofmann Engineering is one of the largest family owned engineering companies in Australia. The company has pioneered a number of new

    Jul 15, 2013

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • AUSIMM
    Slag-Metal Equilibria in Tin Smelting

    The distribution of tin and iron between slag and metal phases at about 1150°C was studied in pot scale experiments. The distribution coefficient k = (Sn/Fe) In metal X (Fe/Sn) in slag was found

    Jan 1, 1966

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000

  • IOM3
    Effects of drum vibration on performance of coal shearers

    By B. Tiryaki, O. Z. Hekimoglu

    Shearer drums are a critical component in the overall performance of coal shearers, with the cutting performance depending very much on the disposition of cutter tools on the drums (the tool-lacing ar

    Jun 19, 1905

  • CIM
    A Review of Advanced Control Applications in Mineral Processing

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "This paper provides a critical review of the development and application of advanced controls in mineral processing at the industrial level. These algorithms can be sub-divided into four broad catego

    Jan 1, 1992

  • TMS
    Aluminum Smelter Waste Heat Recovery Plant (Heat Exchangers Fouling and Corrosion-a Detailed Investigation)

    By Reza Kamali, Mohsen Bashiri, Hadi Fanisalek

    "Nomenclature: A: area (m2), C: heat capacity (WIK), cp: specific heat (J/Kg K), d: internal tube diameter (in), F: correction factor for multi-pass and crossflow heat exchanger, h: convective heat tr

    Jan 1, 2012

  • SAIMM
    A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop Colliery

    By R. Lombard

    "Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po

    Jan 1, 2015

  • DFI
    Low Strain Integrity Testing Of Deep Foundations ? Introduction

    By Jay A. Berger

    Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me

    Jan 1, 1990

  • AUSIMM
    Industrial Minerals Potential in New South Wales

    Despite a long history of production of industrial minerals and rocks, New South Wales still offers significant opportunities for exploration for and development of these minerals. Exploration for

    Jan 1, 1989

  • TMS
    Classification and Rating of Inclusions in a High Carbon Steel

    By M. Faraji

    Inclusions formed in a high-carbon, manganese-silicon killed plain steel (Fe-0.77C wt%) were studied. Various techniques were used to characterise the inclusions, and the latter were classified accord

    Jan 1, 2010

  • AUSIMM
    Grasberg Block Cave Haulage Project – Design and Construction Update

    By B Mead, N D. Pascoe

    The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00

    May 9, 2016

  • AUSIMM
    Silicon Manufacture in Western Australia Using Local Raw Materials

    By Bibby P. A, Leupen R. A

    A 24,300 tonnes per year state of the art Silicon smelter is being constructed for Barrack Silicon Pty Ltd at Kemerton, 20 kilometres north of the City of Bunbury in Western Australia. The plant is

    Jan 1, 1989

  • AUSIMM
    The Effects of Environment on Bacterial Leaching Rates

    Further evidence is presented as to the widespread occurrence of Thiobacillus ferrooxidans in nature in association with sulphide minerals. Leaching rates are discussed in terms of the effect of envir

    Jan 1, 1968

  • SME
    Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice

    By Horst Pöchhacker

    The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin

    Jan 1, 1976

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008