Search Documents

  • AIME
    Institute of Metals Division - The Gadolinium-Nickel System

    By E. V. Kleber, V. F. Novy, R. C. Vickery

    The constitutional diagram has been determined for the system gadolinium-nickel. Nine intermetallic compounds have been found at compositions corresponding to the following gadolinium-nickel ratios: 3

    Jan 1, 1962

  • SME
    Performance Monitoring Of A Block Cave Mine Using Signal Processing And Waveform Analysis Of GPS Data

    By D. Rutledge

    Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active min

    Jan 1, 2008

  • AIME
    Arsenical Bearing Metals

    By Harold Roast

    THE object of this investigation was to compare the arsenical antimony-lead alloy with some of the regular bearing-metal alloys. With this end in view, the following tests were made: 1. Chemical anal

    Jan 2, 1922

  • NIOSH
    OFR-83-80 Modelling And Data Analysis Of 50 To 5000 KHz Radio Wave Propagation In Coal Mines

    By Robert L. Lagace

    [Suuple Iheorctrccil models are I'M lllolalcd to cltaraclerl/c medium frequency (MF) radio vase pi opaiation in undcrgiounli room arid pillar coal mines fur the purpose of predleiln the most lavo

    Jan 1, 1980

  • SME
    State Summaries ? Arizona

    By N. Niemuth

    Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea

    Jan 1, 2008

  • CIM
    The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in Exploration

    By Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier

    "Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de

    Jan 1, 2000

  • AUSIMM
    Frother-Depressant Interactions in Two and Three Phase Systems

    Frother-Depressant Interactions in Two and Three Phase Systems

    Sep 13, 2010

  • NIOSH
    OFR-47(1)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 1. Executive Summary

    By Mohan K. Wali

    This report, the first in a series of 13 reports, provides a summary of 11 major topics on which individual reports have been prepared. These major topics are: (a) Nature of coal mine spoils, topsoils

    Jan 1, 1982

  • NIOSH
    RI 3440 Reclamation Of Stripped Coal Land

    By Albert L. Toenges

    A phase in strip mining of bituminous coal is the overturning of the surface of the land. The ;purpose of this report is to acquaint the operators and others interested in stripping with the work that

    Jan 1, 1939

  • AUSIMM
    Use of a Crane Mounted Auger for Presink Construction at Fosterville Gold Mine

    By P Jones

    Fosterville Gold Mine is an underground operation located approximately 20 km northeast of Bendigo and 170 km north of Melbourne. Fosterville is the most productive gold mine in Victoria, producing ov

    Mar 21, 2011

  • SME-ICGCM
    Geomechanical and Weathering Properties of Weak Roof Shales in Coal Mines

    By Hakan Gurgenli

    Many coal seams have weak shale immediate roofs that cause ground control problems. Therefore, it is important to know the properties of these shales so that preventive measures can be developed in a

    Jan 1, 2006

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • SME
    International Project Management: Challenges For a Junior Mining Company

    By Andrew Kaczmarek

    The mining industry is enjoying a much needed and long awaited increase in demand for natural resources. However, consolidations in the mining and mining service industries, along with a generational

    Jan 1, 2006

  • IOM3
    Nature of gold mineralization at Mule Canyon, Lander County, Nevada, USA

    By T. J. Serenko

    The epithermal deposit is hosted by Tertiary volcanic rocks that lie between mid-Miocene normal faults of the Northern Nevada Rift. Petrographic, laser-ablation and metallurgical observations suggeste

    Aug 1, 1995

  • AUSIMM
    Mapping of Structural Discontinuities in the Otago Schist as Potential Exploration Targets: Preliminary Results

    By D Craw, I M. Turnbull, R J. Norris, N Mortimer

    The Otago Schist is being subdivided on a regional scale into structurally, metamorphically and lithologically distinct blocks. Differences between blocks are subtle, and difficult to map in the field

    Jan 1, 1999

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "Mfire" Mine Fire And Ventilation Simulator - Mfire Users Manual Version 2.20 August 1995 ? Introduction

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • NIOSH
    U. S. Bureau Of Mines Training Workshop On The " MFIRE " Mine Fire And Ventilation Simulator - MFIRE Users Manual Version 2.20 August 1995 – 1.0 Introduction

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • NIOSH
    RI 7198 Earth Pressure At Rest And One-Dimensional Compression In Mine Hydraulic Backfills

    By David E. Nicholson

    The Bureau of Mines has constructed a special compression chamber for developing stress-strain relationships of mine backfill and simulating the high compressive ground pressures encountered in underg

    Jan 1, 1968

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986

  • NIOSH
    U.S. Bureau Of Mines Training Workshop On The "MFIRE" Mine Fire And Ventilation Simulator ? 1.0 Introduction

    By Linneas W. Laage

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995