Search Documents

  • SME
    An In-Depth Study of City of Niagara Falls Raw Water Intake Tunnel Ventilation Dealing With Large Quantities of Hydrogen Sulfide

    By Richard R. Radel, Jack Barry

    Contract required excavating 2,000 If of 14' horseshoe tunnel in rock, a 95' deep work shaft on shore, and a 50' deep intake shaft located in the middle of the Niagara River just above

    Jan 1, 1997

  • CIM
    The Submarine Coalfield of Sydney, N.S.

    By Sydney C. Mifflen

    COAL MINING, with its some 15,000 employees, is directly responsible for the livelihood of one-fifth of the population of the Province of Nova Scotia and indirectly so for that of possibly another fif

    Jan 1, 1941

  • CIM
    Drill Maintenance Process Improvements: Brunswick Mine

    By Steven Doyle

    Presentation Outline ?Introduction to Brunswick Mine ?Mining Needs and Drilling Trends ?Maintenance Program ?Back to Basics ?Results ?Additional benefits Introduction Xstrata Zinc Brunswick

    Nov 1, 2011

  • SME-ICGCM
    Main Gate Roof Support Design and Management During Longwall Retreat in the Australian Coal Industry

    By Rob Thomas

    Main gate roof control during longwall retreat is subject to a significant increase in horizontal stress and risk. The implementation and management of an appropriate roof support design is as a resul

    Jan 1, 2006

  • NIOSH
    OFR-23(1)-76 A Technical And Economic Study Of Candidate Underground Mining Systems For Deep, Thick Oil Shale Deposits - Phase 1 Report

    The investigations reported herein comprise preliminary studies to evaluate large scale mining systems adaptable to the thicker oil shale deposits in the deeper central portion of the Piceance Creek B

    Jan 1, 1975

  • ABM
    Simulação Física E Matemática Da Penetração De De Gás Na Perna De Subida De Um Modelo Físico De Desgaseificador Rh

    By Bernardo Martins Braga

    O desgaseificador RH é um reator de refino secundário bem estabelecido. Nesse equipamento, gás inerte é usado para promover a circulação de aço entre a panela de aciaria e uma câmara de vácuo. A predi

    Aug 17, 2017

  • SME
    Gravity Separation Development At Boddington Gold Mine

    By Steven Hart, Graeme Hill

    Boddington Gold Mine is situated 130km South-east of Perth, WA. The operation is managed by Worsley Alumina Pty Ltd. The Direct Leach plant was commissioned in mid 1986 at a rate of 3 million tonnes p

    Jan 1, 1995

  • TMS
    High Temperature Experimental Investigations and Thermodynamic Modelling in the FeTiO3-TiO2 Ternary Slag System

    By Leiv Kolbeinsen, Stian Seim, In-ho Jung

    "The current work presents new experimental data in the iron-unsaturated region of the FeTiO3-Ti2O3-TiO2 slag system. The samples are prepared by melting pure reactants in a high frequency induction f

    Jan 1, 2012

  • SME
    Separation and recovery of cobalt and nickel from sulfate solutions of Indian Ocean nodules using Cyanex 272

    By B. R. Reddy, P. V. R. Bhaskara Sarma

    A process for the separation and recovery of cobalt and nickel was optimized for a sulfate leach solution of Indian Ocean sea nodules containing 80 g/m3 cobalt and 730 g/m3 nickel using the sodium sal

    Jan 1, 2002

  • SME
    The State Of The Cement Industry And Import Penetration In The United States ? Introduction

    By Frank C. Stevens

    Many changes have taken place in the "World Cement Market" since Joseph Aspdin discovered portland cement in the early 1800's. At the turn of the century, production of cement world wide was a fe

    Jan 1, 1987

  • SME
    Equipment Maintenance – Tips on Maximizing Mining-Equipment Engine Life

    By Reginald Dias

    Mining equipment life may be extended through preventive maintenance and the proper application of quality lubricants. There are several practices mine operators should consider implementing to prese

    Jan 1, 2004

  • SME
    Inability to communicate : How technical professionals cut short their management careers

    By H. Richard Eisenbeis, Donna M. Watkins

    Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort

    Jan 8, 1987

  • SME
    Optimization of Millennium Chemical’s Paraiba Guaju Mine

    By K. G. Correia

    The replacement of the dry mining method at Guajú Mine by the dredging method was a means of ensuring its feasibility by maintaining the production levels. Dry mining increased the cost of the deposit

    Jan 1, 2005

  • AIME
    Papers - Seismic Methods - Certain Field Problems in Reflection Seismology (With Discussion)

    By W. E. Pugh

    The object of the following is to discuss a few of the problems encountered in the practical field application of reflection seismology. Very little has been published on this phase of the work and it

    Jan 1, 1934

  • NIOSH
    RI 7193 Determination Of Incombustible Content Of Mine Dust By Nuclear Method

    By Joseph W. Martin

    The Bureau of Mines investigated the backscattering of low-energy gamma rays as a method for rapidly determining the incombustible content of coal mine dust. In this method, 60-kev gamma rays from ame

    Jan 1, 1968

  • AIME
  • AIME
    Modern Mining Methods-- Longwall, Shortwall (dcb68740-95a4-4eda-84c1-0f718876c42b)

    By Kenneth P. Katen

    INTRODUCTION Though the use of continuous mining machines consolidated the operations of cutting, drilling, blasting, and loading in one machine that would theoretically provide uninterrupted prod

    Jan 1, 1981

  • SME
    Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? Introduction

    By J. Astier

    The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o

    Jan 1, 1974

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • NIOSH
    The Mineral Industry Of Alabama (29387deb-7e98-427f-9201-6527ef73890e)

    By James R. Boyle

    The value of Alabama's nonfuel mineral production in 1982 was $299.4 million, a decrease of $14.4 million from that of 1981; the decrease continued a downward trend that started in 1980. Output o

    Jan 1, 1984