Search Documents

  • AIME
    Reservoir Engineering - General - Performance Analysis of a Major Steam Drive Project in the Tia Juana Field, Western Venezuela

    By H. J. de Haan, L. Schenk

    Scope for Thermal Recovery in Shell's Heavy Oil Fields in Venezuela The main heavy oil reservoirs on the East coast of Lake Maracaibo (Fig. I), known as "Bolivar Coast", initially contained so

    Jan 1, 1970

  • SME
    Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)

    By Jaime Adasme, Héctor González, Benjamín Celada

    "INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In

    Jan 1, 2016

  • SME
    New York-New Jersey?s Mass Transit Tunnel Moves Ahead

    By Arthur D. Silber

    The economic success and growth of any metropolitan region depends on mobility. Today, mobility between New Jersey and New York is threatened by a transportation system that cannot meet 21st century t

    Jan 1, 2009

  • TMS
    Hydrogen Reduction Of Metal Ions: An Electrochemical Model

    By K. Osseo-Asare

    Rate laws for the hydrogen reduction of metal ions are typically of the form: [r = -d[M(II)]/dt = k[M(II)]xPy2H] where k is an apparent rate constant, [M(II)] and PH2 represent dissolved metal

    Jan 1, 2003

  • AUSIMM
    Prospects for Gold in New Zealand

    New Zealand has been a significant producer of gold for over a century. Total recorded production is over 850 tonnes. There were three major periods of production: the first and biggest was between 18

    Jan 1, 1988

  • SME
    Canadian Companies Make Their Pitch At PDAC

    At the Prospectors and Developers Annual Convention (PDAC) in Toronto, Canada mining and exploration companies of all sizes were on hand to discuss the year that was and those that will be. The follow

    Jan 1, 2009

  • SAIMM
    Key processes in asset management for 21st century—maximizing business and ITstrategy integration

    By C. Sarkar

    Increased competition in today’s global economy has put mineral industry under excessive pressure to effectively manage production assets to generate business wealth. Capital intensive industry (CII)

    Jan 1, 2003

  • SME
    Passive Integrating Measurements Of Radon And Thoron: Methods And Field Observations

    By S. Murdock, R. L. Fleischer, H. W. Alter, J. E. Gingrich

    The use of solid state track deters allows totally passive, integrating measurements of 222Rn (radon) or of 220Rn (thoron) plus radon. A track-detecting solid is placed in a holder that is closed by a

    Jan 1, 1981

  • IOM3
    Performance monitoring of rock engineering systems using neural networks

    By J. A. Hudson, D. L. Millar

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: Rock engineering system performance monitoring using neural netw

    Apr 1, 1994

  • TMS
    Production Of Rare Earth Ferrosilicide Alloy

    By Yavuz Ali Topkaya

    Rare earth ferrosilicide is a versatile alloy mainly used to control the detrimental effects of sulfur in steel and to modify graphite structures in cast iron. The aim of this study was to determin

    Jan 1, 2006

  • AUSIMM
    The Air Comparison Pycnometer for Rapid Iron Determinations

    The Beckman Air Comparison Pycnometer is as accurate as the specific gravity bottle for the determination of the volume of fine powders, or particles, up to 50 c.c. in volume. The determination using

    Jan 1, 1963

  • AUSIMM
    Gravity and Magnetic Surveys Over Iron Formations, Middleback Ranges, South Australia

    Measurement of densities, susceptibilities, permanent magnetization, and calculation of demagnetization factors has allowed computer modelling of gravity and magnetic data over the Middleback Range ir

    Jan 1, 1975

  • SAIMM
    Annual Report and Accounts (1967)

    COUNCIL The following served on Council during the year under review: Office bearers: Prof D. D. Howat (President), Dr J. P. Hugo and P. W. J. van Rensburg (Vice-Presidents), V. C. Robinson (Immed

  • CIM
    Control of copper electrolyte impurities using the Eco-Tec APU®

    By C. J. Brown

    Controlling the level of impurities in copper refinery electrolytes is essential to achieving acceptable cathode purity. Purge of electrolyte is not an entirely satisfactory solution since the cost of

    Jan 1, 2005

  • SME-ICGCM
    Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical Modeling

    By Slawomir Bock

    One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s

    Jan 1, 2009

  • DFI
    The Deep Soil Mixing for the Galataport Project in Istanbul, Turkey.

    By Federico Pagliacci, Marco Chiarabelli, Salvatore Miranda

    The paper describes the adopted technologies and performance controls related to a special geotechnical engineering solution provided within the scope of the Galataport Project, in Istanbul, Turkey. T

    Jan 1, 2018

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • ISEE
    Possibility of Organizing and Analyzing Drilling - Blasting with a Computer Program (DelPat)

    By Cceliksirt, V Erkan

    This computer program has been developed under the field conditions for use in control of surface drilling-blasting operations. This paper outlines the relevance of fragmentation to quarrying, open pi

    Jan 1, 1998

  • SAIMM
    Rockpasses: A Guide To Excavation Methodology

    By U. Sachse

    This paper explores a systematic approach for mining decision-makers to use when faced with choosing which method to use for a specific rockpass length. The different excavation methods available in t

    Jan 1, 2005

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove