Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Waste Clay Ponds In Florida-Regulatory Status ReportBy S. Partney
Waste clay ponds are a necessary part of the phosphate rock beneficiation process. They are large, averaging a square mile in size; unsightly, in that they protrude 20 to 50 feet (6 -15 meters) above
Jan 1, 1998
-
Preventive Support Maintenance (PSM) as a Mitigation of Rockburst Hazard: A Case Study for The Deep Mill Level Zone MineBy M Ali, E Satriawan, M Napitupulu, A Munandar
The Deep Mill Level Zone (DMLZ) panel cave mine is one of three active caving mines at PT Freeport Indonesia’s Grasberg Underground Mining Complex. The DMLZ mine is located at a depth of approximately
Apr 26, 2022
-
Adsorption Behavior Of Gold In Ammoniacal Solutions On Activated CarbonBy K. N. Han, Q. Xu
The adsorption behavior of gold in ammoniacal solutions on activated carbon was studied. The gold adsorption capacity of the activated carbon and the recovery efficiency were examined. The parameters
Jan 1, 1997
-
Meandu Rising: The Second Life Of Tarong Coal Project's Meandu Mine - IntroductionBy J. G. Pippenger
Rio Tinto Coal Australia (RTCA) developed Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent newly constructed Tarong Power Station (TPS). In designing the mine, RTCA
Jan 1, 2011
-
Innovations In Geoscience Modelling: Practical Solutions For Environmental ProblemsBy E. A. Rychkun
Mining and environmental objectives have traditionally been in conflict. This conflict reflects a delicate balance between the need to spend money to protect the environment, and the need to save mone
Jan 1, 1993
-
Coal Fired Lime KilnsBy J. L. Thompson
The combustion of pulverized coal is a century-old practice. Many people have investigated coal dust and the residual fly ash particles that re-main after combustion. But the combustion process and fl
Jan 1, 1978
-
Coal Prospect Evaluation Using High-Resolution Reflection Seismology - A Case StudyBy Robert J. Greaves
High-resolution seismic reflection profiling can be used to evaluate detailed struc¬tural and stratigraphic features of coal pros¬pects. Since most coal prospects are relatively shallow (less than six
Jan 1, 1983
-
A Comparison Of The Methodologies Of Intake Measurement And Bioassay For Assessing Exposure To Personnel In Uranium Milling OperationsBy A. H. Leuschner, P. J. Kruger, J. Kruger
INTRODUCTION This paper deals with some practical aspects of the use and interpretation of dosimetric methods for assessing the exposure of workers to natural uranium. Consideration must be given n
Jan 1, 1981
-
Transport Of Slurries In Heterogeneous Regime ? IntroductionBy Jing G. Yen
When a solid-liquid mixture is conveyed through a pipe,' four hydrodynamic conditions may develop depending upon the properties of the transporting medium, the properties of the transported mater
Jan 1, 1969
-
Rock Mechanics Instrumentation for Determination of Stress Distribution Around Hardrock Longwall Mining Faces - IntroductionBy James J. Scott
Longwall mining has not received a great deal of attention in the United States; however, this system offers many advantages over the conventional room-and-pillar methods now being used. In order to c
Jan 1, 1964
-
Rehabilitation of Decant Structure for Coal Slurry Impoundment in OhioBy Raymond A. Povirk, David L. Bartsch, James V. Hamel
The Ohio Valley Coal Company is expand- ing its Powhatan Mine No. 6 near Alledonia, Ohio. This expansion includes a 20 rn (65 ft) height in crease for an existing 44 rn (145 ft) coal refuse - slurry i
Jan 1, 1991
-
Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022By John D. Hanifin, C. Kevin Moon, Eric C. Wang
Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera
Dec 1, 2022
-
Impervious Tunnel Linings in a Land of ShakesBy Chien-Tsun “C. T. ” Chu, Drupad B. Desai, Ron E. Redd
The 12,710-m (41,720-ft) Riverside Badlands Tunnel is located between the most active faults—San Andreas and San Jacinto—in Southern California. To accomplish the impervious final lining design and t
Jan 1, 1997
-
Modeling Mine Ventilation Networks Using Five Basic Network Elements (4939391e-0889-4962-b814-a5ef2fa07e95)By Y. J. Wang
In the mathematical analysis of electrical networks, the electrical devices are often modeled using idealized network elements such as current sources, voltage sources, and resistors. An analogous app
Jan 1, 1996
-
Technical considerations for TBM tunneling for mining projectsBy Dean Brox
Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and
Feb 1, 2014
-
Cost Engineering - Who Needs It?By A. J. MacKellar
The economic viability of any project is generally assessed on an evaluation of the total capital constructed costs along with operating costs, owner's costs and market conditions. This paper wil
Jan 1, 1975
-
Technical considerations for TBM tunneling for mining projects - SME Transactions 2013By Dean Brox
Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and
Jan 1, 2013
-
Opportunities and Challenges for Autonomous Shuttle Car Operation in Underground Coal MinesBy J. Sottile, V. Androulakis
Operators of underground coal mine shuttle cars are exposed to numerous hazards including noise, dust and musculoskeletal trauma. The repetitive nature of shuttle car operation leads to fatigue-relate
Jan 1, 2019
-
Kaolin Filter Aids: The Key To Improved Plant ProductivityBy L. E. Bowman
Efficient filtration of fine kaolin particles plays a crucial role in processing of raw kaolin to a marketable product. Oftentimes, filtration Is the rate controlling step of the whole process. As a c
Jan 1, 1993
-
Conceptual And Symbolic Modeling Of Steep Slope Contour MiningBy J. H. Gasper
The overall success of steep slope (>20°) contour mining is dependent upon many factors. The major factor is the selection of the mining method that best suits the premining site conditions both envir
Jan 1, 1991