Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Aspects of Pneumatically Applied Concrete Final Tunnel Linings - Recent Experience at the East Side Access (ESA) Project in New YorkBy Alfredo Valdivia, Jesus Schabib, Vojtech Gall, William Cao, Curt Cicileo, Andrew J. Thompson
"The East Side Access Project (ESA) involves the construction of geometrically complex underground structures including a large number of caverns and bifurcations. Initially conceived as dual lined st
Jan 1, 2016
-
Sampling Of Trace Elements: In The Environment, Ores And Products, And High Purity Materials ? IntroductionBy Francis F. Pitard
The presence of elements, minerals, or chemical compounds in materials at very low concentrations is becoming a constantly increasing concern for several segments of the Industry. Some trace elements
Jan 1, 1986
-
Innovative Research On Bulk Density Of Coal For Application To Transportation SystemsBy J. W. Leonard
By using physical and chemical method to increase the bulk density of newly mined coal, the productivity of a mine can be significantly increased. Greater amounts of coal can be placed in fixed volume
Jan 1, 1992
-
Engineering Geology of Barrick Goldstrike Mines’ Betze PitBy Michael R. Smith
Barrick Goldstrike Mines Inc.’s Betze open pit is located at the north end of the Carlin Trend, in Eureka County, NV. Ten open pit gold mines exist on the trend, which strikes northwesterly, through
Jan 1, 1994
-
Column Flotation Development At Los Bronces Concentrator Of Compania Disputada De Las Condes -ChileBy F. Villanueva Araya
Compania Minera Disputada de las Condes (CMD), an Exxon Affiliate stewarded by Exxon Coal and Minerals Company, operates two' copper mines and concentrators in Chile. Pilot plant studies were ini
Jan 1, 1990
-
Alaskan CoalsBy Cleland N. Conwell
Intermittent coal mining has been conducted in Alaska for over a century. The first report of coal in Alaska was by the Veechy expedition of 1826 and 1827. Whaling ships used coal from Corwin Bluff ne
Jan 1, 1972
-
Uranium In Situ Leaching: Its Advantages, Practice, Problems, And Computer SimulationBy Bill A. Hancock
In Situ leaching for the recovery of uranium from low grade sandstone deposits is one of the newest technological advances in the mineral industry. It is rapidly developing into a commercially feasibl
Jan 1, 1977
-
Risk in Ultimate Pit Selection - Mining, Metallurgy & Exploration (2024)By Edward Holloway
The basis for the selection of the ultimate pit for an open pit mining operation is generally opaque. Some form of value-based analysis will generally guide the final decision; however, the value will
Feb 21, 2024
-
Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam InjectionBy P. Marcheselli, Jean-Yves Peron
A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac
Jan 1, 1995
-
Soft Ground Tunneling Under a Major Provincial Highway in Ontario: Sheppard East LRT, TorontoBy Verya Nasri, Kevin Akbarpour, Hiva Mahdavi
"The Sheppard East Light Rail Transit (SELRT) project comprises approximately 13 km of new light rail, which will be constructed along Sheppard Avenue East in Toronto. There is a 380 metre long sectio
Jan 1, 2016
-
Characteristics of Drawing Body Shape in LTCC: Theoretical Model and Experimental ValidationBy Weijie Wei, Jinwang Zhang, Jiachen Wang, Yang Li
"Longwall top-coal caving (LTCC) mining technique is one of the important methods for underground thick seam extraction in China. The coal seam in LTCC panel is divided into two parts: bottom-coal and
Jan 1, 2019
-
Project Optimization and Competitiveness Enhancement Trough an Intergrated Health and Safety Management – Safety for Construction Work UndergroundBy J. Herhold, S. Plaum
"Current and future operational processes in the mining and underground construction sector are under the influence of the prevalent competition and the acute necessity of optimization approaches conc
Jan 1, 2017
-
Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By E. R. Bauer
The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove
Jan 1, 1999
-
Roof Coal Thickness Sensing For Improved Continuous Miner Operation (008c7ac7-64ea-4f98-ae9c-245e6179b26d)Extensive testing in the past ten years has shown that where a uniform natural gamma background is present in the strata bordering the seam, the thickness of the boundary coal left in place after mini
Jan 1, 1990
-
Leaching Tests On Chino "J" Dump Core SamplesBy W. A. McKinney
The U.S. Bureau of Mines, Kennecott Copper Corp., and New Mexico Institute of Mining and Technology are cooperating on a research project to improve extraction of copper from previously leached waste
Jan 1, 1970
-
Lime Substitutes For The Treatment Of Acid Mine Drainage (72bf0b1b-0332-4a1c-b1a5-bc738cf0f204)By George W. Heunisch
The properties of Neutra-Fix® and Neutra-Ment® , two new lime substitutes for the treatment of acid mine drainage (Arm), have been compared with lime and Alkament®, two products presently in use for A
Jan 1, 1984
-
Some Geological Factors In Deep Well Disposal Site EvaluationBy Neilson Rudd
Many deep well waste disposal. operations have adopted the technology of the petroleum industry but fail to make full use of the knowledge and experience upon which this technology is based. Inexperie
Jan 1, 1971
-
Benbrook Connection Tunnel Fort Worth, TexasBy C. A. Wiggins, J. M. Kennedy
The Benbrook Connection tunnel forms approximately 6,666 m (19,560 ft) of17,678 m (58,000 ft) of raw water pipeline connecting Lake Benbrook with the Rolling Hills Water Treatment Plant. This connecti
Jan 1, 1997
-
Evaluation of Uranium Contaminated SoilsBy R. G. Reddy, A. E. Torma
Bio-treatment of uranium contaminated soils from Fernald using the bacterium Thiobacillus ferrooxidans was investigated. The experimental results showed that extraction of uranium upto 99 percent from
Jan 1, 1995
-
MDC’s Hartford, Connecticut South Tunnel Project: Integrating Site Investigation Technology, Geology and Geotechnical Engineering for Effective Ground CharacterizationBy Robin Dill, Wei Song, Andrew Perham, Leo Martin
"AECOM completed a subsurface exploration program for an 18-foot diameter, approximately 4-mile long rock tunnel project in Hartford, CT. The tunnel crosses the regional geologic trend through the mid
Jan 1, 2016