Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBMBy Martin Herrenknecht
After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between
-
Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall OperationsLongwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De
Jan 7, 2020
-
Estimating Technology’s Impact on Underground Coal ProductivityBy Stanley C. Suboleski
1977 was the modern day low point for productivity in the coal industry. At that time, no one could have predicted that the industry was about to enter a productivity rise that would continue unabated
Jan 1, 1990
-
Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer SimulationBy J. A. Delgadillo
Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c
Jan 1, 2008
-
San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger ShieldBy Brett Campbell
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa
Jan 1, 2008
-
Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze WallBy Helmut Hass, Michael B. Gilbert
The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S
Jan 1, 2007
-
Recent Developments in the TBM Industry—New and Innovative TechnologiesBy Martin Herrenknecht, Karin Bäppler
The last five years have seen a remarkable increase in tunnelling projects in both soft ground and hard rock applications. Part of the increase is a result of recent Research & Development efforts to
Jan 1, 2005
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
Engineering And Construction Of The Goldstrike Roaster FacilityBy B. Burke, R. Colquhoun, K. Thomas, R. Walton, D. Fentie
The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in GroundwaterBy J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry
"Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,
Jan 1, 2016
-
More than 200 attend Cutting Edge 2016 in nation’s tunneling hotbedBy William Gleason
"Speakers and attendees of the 2016 Cutting Edge Conference could not be faulted for keeping one eye on the presentations taking place at the Hyatt Regency at LAX in Los Angeles, CA on Nov. 7 and 8 an
Dec 1, 2016
-
Union Pacific Instrumental in Developing Wyoming TronaBy Neil A. Brown
The trona deposits near Green River, in southwestern Wyoming are world class in size and quality. They contain more than 25 times the reserves of the next largest trona deposit at Lake Magadi in Kenya
Jan 1, 1995
-
SIU-Sim: A Novel Coal Preparation Plant SimulatorCoal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S
Jan 1, 2008
-
Investigation of the Source Mechanisms of Mining Induced Seismic Events at Kloof Gold Mine, South Africa - RASIM 2022By Musa D. Manzi, Raymond J. Durrheim, Richard T. Masethe
An investigation into the source mechanism of mining-induced seismic activity plays a vital role in understanding the various modes of failure observed in the underground deep-level South African mini
Apr 26, 2022
-
Detection And Control Of Calcium Sulfate Precipitation In The Lead Circuit Of The Hilton Concentrator Of Mount Isa Mines Limited, AustraliaBy P. L. M. Wong, N. W. Johnson
Surface analysis by X-Ray Photoelectron Spectroscopy (XPS) of samples taken from the galena flotation section of the Hilton Concentrator of Mount Isa Mines Limited are presented. Flotation rate and pu
Jan 1, 1995
-
Ground control monitoring system in the Leeville underground mine - SME Transactions 2009By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 2,903 t (3,200 st) of ore per day, with an average gold grade of 0.4 opt. The mine’s horizontal extent is large, 7
Jan 1, 2009
-
Studies Of Anionic Reagents For Phosphate BeneficiationBy P. Zhang
A multiyear, comprehensive study of flotation reagents used in phosphate beneficiation was conducted. The study involved the evaluation of pure fatty acid compounds, comparison of various anionic coll
Jan 1, 2009
-
Advances In Autogenous And Semiautogenous GrindingBy Vladimir G. Kochnev
Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward
Jan 1, 2008
-
Analysis Of Airflow Resistance On Longwall Faces ? IntroductionBy S. L. Bessinger
In the design and specification of a ventilation system for an underground mine, it is necessary to make reasonably accurate estimates of the pressure losses in the various airways of the mine. These
Jan 1, 1987
-
Grouting For Groundwater Control Milwaukee Inline ProjectBy Edwin F. Shorey, Richard F. Coon, Steven B. Fradkin
Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial
Jan 1, 1987