Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Geology And Geochemistry Of The Getchell Disseminated Gold Deposit, Humboldt County, Nevada

    By Byron R. Berger

    Disseminated Au-As-Hg mineralization is localized along the Getchell Fault system at the Getchell Mine in north-central Nevada. Replacement ore bodies occur in Cambrian carbonaceous limestone and limy

    Jan 1, 1975

  • SME
    M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway

    By Isabelle Lamb, Manfred K. Lechner, Daniel N. Adams

    Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with

    Jan 1, 2001

  • SME
    Mine Fire Detection Under Zero Airflow Conditions (455f727e-189c-461a-817c-5b4e28f77c28)

    By John C. Edwards, F. Friel, John J. Opferman, Robert A. Franks

    A series of diesel fuel fire experiments were conducted in the Pittsburgh Research Center's Safety Research Coal Mine (SRCM) to determine products-of combustion (POC) spread rates along a single

    Jan 1, 1997

  • SME
    A High-Capacity Face Ventilation System - Introduction

    By Danny W. Hagood

    High methane liberation and mining depth were two major factors which prompted the development of a high- capacity face ventilation system at Jim Walter Re- sources, Inc., No. 4 Mine. No. 4 Mine, one

    Jan 1, 1980

  • SME
    Automated Quantitative Micro-Mineralogical Characterization For Environmental Applications

    Characterization of ore and waste-rock material using automated quantitative micro-mineralogical techniques (e.g., QEMSCAN® and MLA) has the potential to complement traditional acid-base accounting an

    Feb 27, 2013

  • SME
    A New Process For Selective Flotation Of Phosphate From U.S. Siliceous Ores

    By John Hanna

    The Mineral Resources Institute (MRI) has developed a unique process for selective fatty acid flotation of phosphate minerals from siliceous ores. The process takes advantage of preferential adsorptio

    Jan 1, 1992

  • SME
    South African Gold Production: How Long the Dominant Factor?

    By Edward H. Jr. Boyle, Paul R. Thomas

    Introduction It is estimated that nearly 40% of all the gold ever mined in free world countries has been produced by South African operations. There is concern that this immense productive capacity w

    Jan 11, 1984

  • SME
    Upgrading Mount Royal Tunnel to Latest Standards - RETC2021

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t

    Jun 13, 2021

  • SME
    Rail and Belt Haulage Systems

    By Christopher J. Bise

    INTRODUCTION The principal means for transporting men, supplies, and mined material in an underground or surface mine are rail systems, conveyor belt systems, or a combination of the two. Typicall

    Jan 1, 1986

  • SME
    Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite Concentrator (451168a3-7660-4e82-9e41-cf07bc59aaec)

    By R. L. Wiegel

    Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flowschemes. A critical link that has been missing from t

    Jan 1, 2002

  • SME
    Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, Colorado

    By F. L. Pirkle

    A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta

    Jan 1, 2011

  • SME
    Communication : The missing link in the minerals industry

    By Pat C. Hautala, J. R. Hoskins

    This is a new era for the minerals industry. Never before has there been more need for effective communication. So said Robert Anderson, chairman and chief executive officer of Hanna Mining Co. He was

    Jan 1, 1985

  • SME
    Cincinnati Features Aggregates and Industrial Minerals Programming

    The 2003 SME Annual Meeting and Exhibit will take place Feb. 24-26 in Cincinnati, OH. The meeting will feature a host of special symposia and programming geared toward the industrial minerals and agg

    Jan 1, 2003

  • SME
    Comparison of Different Hollow Cone Water Sprays For Continuous Miner Dust Control Applications

    By S. Mischler, J. Organiscak, S. Klima, C. Seaman

    "Researchers at the National Institute for Occupational Safety and Health’s Pittsburgh Mining Research Division (PMRD) performed comparative testing of six hollow cone water sprays from three manufact

    Jan 1, 2017

  • SME
    Treating Peat-Soil over São Paulo Metro Line 5 - Enabling 10.6m EPB Shield Advance Under Drainage Gallery Foundations

    By José Ricardo Lopes, Alaor Coelho, Marco Gomes, Alfredo Dacio Moraes Filho, Akira Koshima

    "Very low strength alluvial peat soil was found under two old drainage galleries with just 4.3m cover above a twin tunnel due to be excavated by a 10.6m diameter EPB Shield for São Paulo Metro’s Line

    Jan 1, 2016

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • SME
    Numerical Evaluation and Optimization of Grout Backfill Strategy for a Subsurface Gas Tunnel

    By Davar Abi-Zadeh, Cillian Brown, Deepak Kandra

    "Grout backfill strategy for a particular subsurface concrete tunnel (~4.9km long, 3.5m in diameter, carrying 20” gas pipeline) was based on achieving 1:100 slope of the fill in order to progressively

    Jan 1, 2016

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • SME
    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • SME
    Gyratory Crusher Model And Impact Parameters Related To Energy Consumption

    By R. Pothina

    The objective of this research was to develop a mathematical model for gyratory crushers to help in the prediction of energy consumption and to analyze dominant parameters that affect this energy cons

    Jan 1, 2007