Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock mechanics of the Davis Detector Cavern - SME Transactions 2012By D. R. Tesarik, T. C. Trancynger, W. G. Pariseau
The Davis detector cavern was excavated on the 4850 Level of the former Homestake Mine in the mid- 1960s to house a novel neutrino detector developed by Nobel Prize winner Dr. R. Davis. The original c
Jan 1, 2012
-
Water Treatment at Homestake’s Bulldog Mountain OperationBy Joseph L. Young, Richard A. Bohling
To keep Homestake's Bulldog Mountain silver and lead mining and milling operation in southwestern Colorado workable, natural ground water and decant water from the mine's sand backfilling op
Jan 12, 1981
-
Installing Cyclones on the Primary Grinding Circuit at Cyprus SierritaBy Leonard N. Hill
Cyprus Sierrita Corp. has 16 parallel 5.03 m-diam x 5.8 m long (16.5 ft-diam x 19 ft) primary ball mills, each operating in closed circuit with a nest of cyclones. Before the upgrade to 840 mm (33 in.
Jan 1, 1994
-
Alaska Way visit highlights Megaprojects conference in SeattleWhen defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,
Dec 1, 2013
-
Separation Rapids Rare Metals Project, Kenora, Ontario, CanadaBy Donald S. Bubar
The Separation Rapids property, located approximately 60 km (37 miles) north of Kenora, Ontario, Canada, is host to one of the largest rare metal pegmatite deposits in the world. This pegmatite was na
Jan 1, 2001
-
Bioflotation Of Malachite Using Rhodococcus Opacus: Role Of Bacterial Growth PhaseBy G. Kim
The influence of bacterial growth phase on the flotation behavior of malachite has been investigated in a well-controlled Hallimond tube system. The microflotation tests were conducted for malachite (
Feb 27, 2013
-
Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, AustriaBy Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin
PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973
Jan 1, 2005
-
Annual Review 2006 – Mining ReviewBy Staff
The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages—basic (mining), intermediate processing, manufacturing of finish
Jan 1, 2007
-
Mineral Resources and Land Use Planning Conflicts in NorwayBy K. Nielsen
The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini
Jan 1, 2005
-
The Economics of Mechanical Raise BoringBy James H. Dye, N. E. Norman
There will be about 300 raise boring machines used worldwide by late 1981, attesting to the acceptance of this drilling system by the mining and construction industries. Over the past few years, many
Jan 3, 1981
-
Part II. Hydrothermal Reduction Of Cr[6+] In Alkaline Media With CO, CH3OH, HCOO And HCHOBy Jameel Menashi
Aqueous solutions of Na2Cr04 can be reduced with CO to produce hydrous Cr203 and NaHCO3/Na2CO3. CH3OH, HCOO and HCHO in the presence of CO2 also reduce Cr 6+ and yield similar products. It is shown th
Jan 1, 1984
-
Geologic Setting And Gold Grade Patterns Of The El Sauzal High-Sulfidation Gold-Silver Deposit, Chihuahua, MexicoBy S. Weiss, E. Espinoza
The El Sauzal gold-silver deposit is a high-sulfidation, epithermal precious-metals deposit hosted by an east-dipping sequence of dacitic and rhyolitic pyroclastic and debris-flow units of probable Ol
Jan 1, 2007
-
Secondary Grouting at the Chattahoochee TunnelBy Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter
This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra
Jan 1, 2005
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Water Tunnel Beneath New York HarborBy Mohammad R. Jafari
The Camp Dresser & McKee (CDM)/Hatch Mott MacDonald (HMM) joint venture has been engaged by the New York City Economic Development Corporation (NYCEDC) to provide engineering ser-vices in connection w
Jan 1, 2008
-
Simulation of Material Transport in a SAG Mill with Different Geometric Lifter and Pulp Lifter Attributes Using DEM Mining, Metallurgy and ExplorationBy Alejandro Gutiérrez, David Ahues, Paola Merino, Felipe González
A Discrete Elements Method (DEM) study of load movement within a SAG mill 12,192 × 7620 (40′ × 25′) in normal operating conditions is performed. The purpose is to determine how the geometry of the lif
-
The Assessment Of The Effect Of Silicon Carbide Particle Size And The Type Of Gating System On Composite Microstructure Produced By Lost Foam Casting MethodBy M. H. Basiri
The application of aluminum matrix composites, due to their unique properties, is significantly growing in the variety of industries such as aerospace and automobile. In comparison to other light me
Feb 27, 2013
-
Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu
A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was
-
Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United KingdomBy Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler
National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci
Jan 1, 2007
-
Liebherr Introduces 327-T (360-st) Haul TruckLiebherr Mining Equipment Co., of Newport News, VA and Baxter Springs, KS, introduced the T282, a new two-axle, diesel-electric, AC drive haul truck with a payload capacity of 327-t (360-st). The T282
Jan 1, 1999