Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • SME
    Rock Tunneling For A Rail Transit System Buffalo, New York

    By Kenneth W. Torpey, James G. Ball, Richard F. Flanagan, David S. McAllister

    INTRODUCTION Under a Federal grant by the Urban Mass Transit Administration (UMTA) (80%), and sponsored by the State of New York (200), Niagara Frontier Transportation Authority is constructing a 1

    Jan 1, 1981

  • SME
    Exploring Jurassic Porphyry Coppers In The Amazon Jungle Of Ecuador

    By J. D. Lowell, L. Quevedo

    I will talk today about a porphyry copper exploration program now underway in the Amazon jungle in the southeastern part of Ecuador near the border with Peru. The project is unusual for two reasons:

    Jan 1, 2002

  • SME
    Leaching And Recovery Of Gold From Black Sand Concentrate And Electrochemical Regeneration Of Bromine

    By J. A. McKeown, B. M. Sanders, A. Dadgar, R. H. Sergent

    This paper describes the leaching of gold with Geobrom® 3400 from a very rich (6.2 kg/tonne) black sand concentrate and its subsequent recovery by ion exchange resins and solvent extraction. The disso

    Jan 1, 1990

  • SME
    Development Of A High Blow Energy Hydraulic Impactor

    By Wm. Ross Wayment, Innes P. Grantmyre

    INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor

    Jan 1, 1976

  • SME
    T& UC Tunnel Demand

    TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study

    Sep 1, 2013

  • SME
    Selective Flocculation Of Apatite/Calcite And Apatite/Silica Systems Using A New P(MAAA) Latex

    By Y. H. Zhan

    A new P(MAAA) latex was developed and used in separation of ultrafine apatite from calcite and silica by means of selective flocculation. The latex was found to flocculate selectively apatite from apa

    Jan 1, 1998

  • SME
    Building Better Haul Roads: Designing For Structural Strength

    The structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo

    Jan 1, 2011

  • SME
    Preliminary Design of the Caldecott Fourth Bore

    By Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen

    This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup

    Jan 1, 2007

  • SME
    Policy to Practice: Strategic Environmental Assessment in the Real World

    By F. M. McEvoy, E. J. Steadman, R. Murfin

    In England, the provision of aggregate is determined by the historical relationship between construction and aggregate consumption. This approach does not necessarily lead to sustainable decision-maki

    Jan 1, 2005

  • SME
    Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges

    By James D. Nickerson

    Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea

    Jan 1, 2009

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • SME
    Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings

    By K. E. Wood, K. J. DiRocco, L. A. Becker

    The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat

    Jan 1, 2005

  • SME
    Cable Shovel Health And Longevity In Formation Excavation

    By S. Frimpong

    Cable shovels are used for primary excavation in in-situ and/or pre-fragmented formations in surface mining operations. Poorly fragmented hard rock formations and random occurrence of hard boulders i

    Jan 1, 2007

  • SME
    Rain Underground Mine, 1993-2002 Mining A Low-Grade Gold Resource In Weak Rock

    By M. Kockler, S. J. Jung

    Underground operations at the Rain Mine averaged 360 tonne/day (400 ton/day) utilizing underhand drift-and-fill and longhole stoping with delayed fill between 1993 and 2002. Mining from four ore zones

    Jan 1, 2004

  • SME
    Coal 1985

    By C. Heath

    US coal consumption reached new heights in 1985, but production was constrained by excess consumer inventories. Domestic consumption of coal reached a record 742 Mt (818 million st) during the year. T

    Jan 5, 1986

  • SME
    Mine Modeling Software for Less Than $1000 – Usefulness and Limitations

    By Betty L. Gibbs

    Geologically simple deposits can be modeled quickly and easily with inexpensive gridding and mapping software. Hundreds of mines around the world use RockWorks99 and Surfer 7 for generating contour m

    Jan 1, 2000

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    Alumar: Improving Local Communities Capacities For Implementation A Sustainable Development Model. São Luis- Maranhão-Brazil.

    By D. Campos, J. M. Macedo, S. Chadwick

    The incorporation of low cost technology transfer to increase the ability of locals to acquire and maintain long term employment are key ingredients for sustainable industrial development. Alcoa’s Alu

    Jan 1, 2004

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007