Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Air filtration technology for respirable dust control in room-and-pillar miningBy Y. P. Chugh
A novel dry and wet air dust filter concept was conceived and demonstrated successfully at two mines. A steel-wool and a fiberglass filter, suitable for underground use were identified through laborat
Jan 1, 2009
-
Final Tunnel Liner at Mill Creek 3 Project - Case StudyBy M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated WorksBy Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson
"PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)
Jan 1, 2016
-
Port of Miami Tunnel Update?A View From Design Builder?s EngineerBy Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Drilled Shaft Construction At Crownpoint, New MexicoBy Hassell E. Hunter
The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr
Jan 1, 1983
-
Lead concentrations associated with fire assaying can be a health problemBy Gaither H. Kitchell
Introduction Fire assaying is an ancient method of determining the amount of gold and silver in geological materials. Today's commercial, mining, school, and private fire assaying laboratories s
Jan 8, 1985
-
Elements Of Graphical Mine PlanningBy W. A. Wilkinson
In creating a surface mine design, a complicated series of events may be required to meet both mining and environmental objectives. Envisioning the mine at every step of the operation can greatly assi
Jan 1, 2002
-
The World's Largest Ore Grinder Without Gears - Introduction:By Walter Meintrup
On Nov. 4, 1981 the newly installed 1000tph wet-process iron-ore ball mill of A/S Sydvaranger completed its first four months of uninterrupted, successful full-load operation in Kirkenes/Norway. This
Jan 1, 1982
-
Plant Performance Improvements Using Grinding Circuit ?Classification System Efficiency??Classification System Efficiency (CSE)? is a simple, powerful concept which can be used to measure and improve ball mill circuit efficiency. This paper describes six plant case studies which demonstr
Jan 1, 2012
-
Non Contacting Sensor Technology For Measuring Level And DensityBy T. Hart
Nuclear gauging is used world-wide in almost every industry. From mining and ore-grading to finished product, the metallurgical industry is one of the biggest users of nuclear sensors for inventory,
Jan 1, 2011
-
APM Tunnels at Phoenix Sky Harbor International AirportBy David M. Jurich, Randy J. Essex, Alex de Aboitiz
An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t
Jan 1, 2005
-
Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)By S. Ersayin
In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im
Jan 1, 2008
-
An Empirical Analysis Of Ventilation Requirements For Deep Mechanized Stoping At The Homestake Gold MineBy LeEtta M. Shaffner, John R. Marks
INTRODUCTION In the last twelve years, underground stoping methods at the Homestake Gold Mine have evolved from open cut-and-fill with jacklegs, cribbed raises and electric slushers to ramp-based m
Jan 1, 1993
-
Multiple Criteria Approach To Model Calibration In Dem Simulation Of Compaction ProcessesBy A. Sand
A 2-dimensional computational model based on the discrete element method (DEM) is utilized for modeling of stamp-charged coke making. In this process, a large volume of coal is compacted to one single
Feb 27, 2013
-
Minerals Planning Policies in EuropeBy S. Solar, G. Tiess, K. Nielsen, H. Wagner
The paper summarises the results of a recent study of minerals planning policies of the Member States of the EU. The study has shown that contrary to the public opinion the production of industrial mi
Jan 1, 2005
-
Cresson Mine Completes Two-Year ExpansionBy William R. Yernberg
The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini
Jan 1, 2002
-
The Interplay of Face Support Pressure and Soil Permeability on Face Stability in EPB TunnelingBy Dimitrios Litsas, Michael Kavvadas, Panagiotis Sitarenios
"The paper discusses the results of 3D finite element analyses to investigate the effect of face support pressure and soil permeability on face stability conditions in EPB tunnelling. Two main types o
Jan 1, 2016
-
Ani-Metprotech Stirred Vertical Mills For Ultra Fine Grinding- Case Studies In Gold, Nickel And Lime SlakingBy K. S. Liddell
Ultra fine grinding is becoming increasingly used in the mining industry over recent years. The development of large-scale units for high volume grinding of low value materials and concentrates has op
Jan 1, 2001
-
An Approach To Successful Development Of International Mineral ProjectsBy T. L. Owen
Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o
Jan 1, 2000
-
How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out ChallengeBy Simon Strong, Tim Brown, Luis Ignacio Sanz Vivanco
"One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the pre-stressed preca
Jan 1, 2016