Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rethinking Capacity BuildingBy K. Konialis
In the last twenty years, the mining industry has made marked efforts to improve its reputation in regard to its social performance. These efforts have been expressed in the 9th ICMM (International Co
Jan 1, 2007
-
Reclaiming Coal Slurry Ponds to Wetlands, "A Higher or Better Use"By Jack R. Nawrot, R. E. Lounsbury
Preservation and replacement of wetland habitat has become a National priority. Lands affected by mining can provide an excellent opportunity to develop wetlands where none currently exist. This propo
Jan 1, 1991
-
Inserted Mill Liners: A Concept Of CompromiseBy Charles B. Dugger
Sacrificial linings for grinding mills have been a necessary state of the art of mineral dressing since the inception of comminution. Long recognized as the final link in energy transmission from powe
Jan 1, 1979
-
Backfill No Top Access Narrow Vein Cut And Fill Stope At Hollister Mine ? IntroductionStope width was controlled around 3.5 feet for the narrow high grade vein system at Hollister Gold Mine. Without top access, backfill material was pumped from bottom access up into stope through a ser
Jan 1, 2011
-
Chromium Electroplating And Its Applications To The Mining IndustryBy D. W. Tuckwiller
Electroplating is a widely utilized but little understood process. The fact that the average person is in contact with dozens of plated items daily without even being aware that they are electroplated
Jan 1, 1970
-
Strategic Planning In Open Pit Mine OptimizationBy A. J. Basu
Computer assisted mine planning and design applications are routinely used by many Australian mining companies, However, the design process requires human expertise to recognize and evaluate the poten
Jan 1, 1997
-
Reliability-Based Capacity Determination Of A Bucket Wheel Excavator System In Yuabaoshan Surface Coal MineBy Y. Xi, T. M. Yegulalp
An availability approach for determining the capacity of a major Bucket Wheel Excavator (BWE) system to be used in the Yuabaoshan Surface Coal Mine in China is presented in this paper. Based on previo
Jan 1, 1994
-
Changing Trends In The Exploration, Mining And Metallurgy For Gold In The 1990'sBy T. Peter Philip, Erich U. Petersen, William J. Tafuri, Donald M. Hausen, Douglas N. Halbe
Scarcely a month goes by that I or someone else at Newmont Mining or Newmont Gold isn't asked to give a talk on the topic I was asked to discuss today. Investors, financial analysts, geologists,
Jan 1, 1990
-
Titanium: A Review of 1994 ActivitiesBy J. M. Gambogi
Demand for titanium minerals and pigments increased during 1994 as the world economy expanded. Global consumption of titanium dioxide (Ti02) pigment grew an estimated 5% during 1994, the highest growt
Jan 1, 1995
-
Waste Isolation In Salt CavitiesBy Larry Sevenker
On the basis of favorable salt characteristics, primarily compressive strength and impermeability, solution-mined cavities can provide structurally stable isolation chambers for waste. Solution mining
Jan 1, 1981
-
Challenging conventional wisdom and setting new priorities concerning West Virginia mine safety performancesBy R. L. Grayson
Conventional mine safety wisdom states that "the most efficient mines are also the safest." Since the 1980s, small mines (and contractors) have been targeted as the most dangerous because of their fat
Jan 1, 2000
-
Deserado Mine Computer Monitoring And Control System EvaluationBy R. H. King
The Deserado Mine of Western Fuels- Utah Inc. installed a micro-computer based mine wide monitoring and control system for mine environment, beltway fire protection, belt operating parameters, and equ
Jan 1, 1987
-
Discussion - Lime substitutes for the treatment of acid mine drainage - by G.W. Heunisch Technical Papers, MINING ENGINEERING, Vol. 39, No. 1 January 1987, pp. 99-96By L. B. Anderson, G. A. Carmody
We wish to comment on the paper by G.W. Heunisch (MINING ENGINEERING, January 1987), which raised several important points regarding treatment of acidic waste waters. This paper confirms, in part, tes
Jan 1, 1988
-
Federal Programs Leading To Toxicological Testing Of MineralsBy Dorothy A. Canter
Three Federal programs exist for identifying significant environmental chemicals, including minerals, that should be tested for toxicological effects. Two programs are mandated by law and can lead to
Jan 1, 1991
-
Phosphate Rock – A Review of 1992 ActivitiesBy J. J. Bartels
The phosphate rock review did not arrive in time for publication in the. June issue. The world phosphate industry continued its slide in 1992 from the already depressed levels in 1991. The industry
Jan 1, 1993
-
Evaluation Of Parameters Influencing Potential Gas Flow To The Mine In The Event Of A Nearby Unconventional Shale Gas Well Casing BreachBy STEVEN J. SCHATZEL, Zoheir Khademian, KAYODE M. AJAYI
The integrity of unconventional shale gas well casings positioned in the abutment pillar of a longwall mine could be jeopardized by longwall-induced deformations. Under such scenarios, the surrounding
Mar 1, 2023
-
Selection of belt conveyor shifting equipmentBy F. G. Boehm, T. S. Golosinski
This paper identifies the components of belt conveyor shifting force as a vertical force, Pv, a lateral force, Ph, and a longitudinal force, Pl. A method for estimating these forces is proposed that r
Jan 1, 1988
-
Integrated approach to mine production and cost managementBy R. L. Grayson, Y. J. Wang
An integrated approach to the management of underground coal mine production and cost is presented. A conceptual model for objectively analyzing an underground mine to obtain lower cost and higher pro
Jan 1, 1990
-
Dynamic Programming In Mine Planning And Production SchedullingBy F. H. Muge
This paper intends to present a general methodology implemented in a software package and which can be applied, whatever the exploitation methods, mining constraints and time basis, to mine planning a
Jan 1, 1992
-
Short-Term Mine Production Scheduling For Industrial Minerals Using Multi-Objective Simulated AnnealingBy M. Kumral
The in-situ mineral characteristics of a deposit are simulated by sequential co-simulation and averaging the simulated characteristics within specified block volumes creates a three-dimensional block
Jan 1, 2002