Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Discussion - Design Of Pillar Systems In South Africa - Ozbay, M. U., Ryder, J. A., Jager, A. J.Contribution by F.S.A. de Frey The authors are to be congratulated on a job well done by making, in their paper, such a pool of information available to mining engineers. I would like to comment on
Jan 1, 1995
-
Technical note-A theoretical comparison of the performance of drag picks in relation to coal-strength parametersBy R. M. Göktan
A theoretical comparison is made between point-attack and wedge-shaped picks in regard to their cutting efficiencies in coals having different strength characteristics. With specific energy as a crite
Jan 1, 1992
-
The Computer Mapping and Assessment of Borehole and Sampling Data for Stable Minerals, Particularly as Applied in Coal MiningBy M. Berjak, D. M. Hawlins, R. B. MacGillivray
SYNOPSIS The paper describes a method of producing iso line plans using a mathematical technique for interpolating between boreholes, and its computer application. The iso line plans are used for ass
-
Technical Note: An Innovative Technique For Minimizing Operational Costs Of End-User Groups In A Production EnvironmentBy C. J. Alberts
The perception exists in many organizations that, once an energy management system is employed, there need not be any further adjustments to such a system. This is not true, as the field of energy man
Jan 1, 1997
-
Mineral Supply From Africa: China's Investment Inroads Into The African Mineral Resource Sector - IntroductionBy M. Ericsson
?Rare earths ?will not be bargaining instruments?? was stated in a headline in China Daily of 29 October 2010. The Chinese government is trying to fend off the persistent accusations from Japan, the U
Jan 1, 2011
-
Interaction Of Slurry Pipe Flow With A Stationary BedBy V. Matou?vek
The paper addresses pipe flows of aqueous medium-sand slurries at velocities lower than the deposition-limit velocity. Laboratory test results including measurements of particle concentration distribu
Jan 1, 2007
-
Managing The Study Risk (bcec2d80-a6d7-40d3-8d47-d5d646e10702)Project evaluation is completed through individual studies covering technical and financial aspects of the mine to market. These studies are completed at various levels of detail depending on where th
Jan 1, 2007
-
Evaluation Of Exploration Projects (01da8ac4-b154-4819-9d4f-fbf56eeb33f9)By A. Morley
It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment
Jan 1, 2007
-
Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover
Jan 1, 2007
-
Finance accounting and cost control for long-term construction contracts supported by the integrated management and information system AristotelesBy K. Böde
Hochtief AG Germany has developed a comprehensive management and information system for the construction industry named Aristoteles. This system is an efficient supporting tool to manage a variety of
Jan 1, 2003
-
A semi-empirical kinetic model for the atmospheric leaching of a Ni-Cu converter matte in copper sulphate-sulphuric acid solution - SynopsisBy R. M. Lamya
A semi-empirical kinetic model was developed for the atmospheric leaching of a Ni-Cu matte in copper sulphate-sulphuric acid solution. Kinetics of the leaching process was studied as a function of ini
Jan 1, 2009
-
Longterm trends in domestic metal prices under international conditions of differential inflation rates and unstable currency exchange ratesBy D. G. Krige
The problem of a realistic investment analysis for a new mining venture that sells its products on the international metal markets IS studied against the background factors, firstly, of different infl
Jan 1, 1979
-
The Design Of A Backfill System, With Particular Emphasis On Randfontein Estates Gold Mining Company (W) LimitedThis paper details the preliminary design work carried out before and during the implementation of an extensive backfilling programme on Cooke 3 Shaft, Randfontein Estates Gold Mining Company (Witwate
Jan 1, 1988
-
The effect of stope backfilling on the construction and operation of slimes dams in the gold-mining industryBy J. A. Wates
Stope backfilling in South African gold mines uses the coarser cyclone fraction of the gold tailings. The disposal of the overflow from the cyclones, which is finer and of higher moisture content than
Jan 1, 1988
-
The effects of mil speed and filing on the behaviour of the load in a rotary grinding millBy M. H. Moys, K. S. Liddell
The dynamics of the ball load within a wet-grinding mil are examined, using measurements of torque and load position, The test equipment provided an accurate torque measurement, and the toe and should
Jan 1, 1988
-
The rationalization of mine and preparation-plant output to enhance the exploitation of coal reserves in South AfricaBy P. E. Hand
SYNOPSIS This paper describes some of the markets for South African coal and their particular coal requirements. It describes how reserves are being used and suggests new strategies to make possible
Jan 1, 1991
-
Mine-impacted water: From waste to resourceBy A. N. Clay, N. N. Moeketsi, S. Joubert
For many years, mine-impacted water has been regarded as a problem and linked to long-term environmental liabilities. However, this water can be a renewable and a sustainable resource, provided that i
Jan 2, 2022
-
The design of circuits for electric shotfiringBy P. C. Seligmann
The theory of firing of electric detonators is developed insofar as it affects the design of blasting circuits. Practical values for the firing conditions suited to detonators of local manufacture are
Jan 1, 1979
-
The conversion of a uranium plant to the recovery of zincBy H. E. Cross
The conversion of a uranium plant to the recovery of zinc by H. E. CROSS. B.Sc. (Eng.)(Hons.) Rand (Fellow) The conversion of the Vogelstruisbult Uranium Plant into a plant for the production of elect
Jan 11, 1973
-
Theshold rates of return on new mining projects as indicated by market investment resultsBy J. D. Austin, D. G. Kringe
Rates of return realized on investments in the gold mines of the newer goldfields outside the Witwatersrand were calculated and analysed over various time intervals and on various bases. It is shown t
Jan 1, 1980