The Institute of Lighting Engineers of South Africa
The Institute of Lighting Engineers of South Africa The Institute of Lighting Engineers of South Africa (ILESA) was constituted in May 1972 and now has over 70 members. The first Annual General Meetin
Jan 3, 1974
-
Assessment Of Current Mining Strategy For Steep Reefs At Mine A
By A. Nhasengo
Paper written on project work carried out in partial fulfilment of B. sc. Eng (Mining Engineering) The purpose of this investigation was to assess the mining strategy for steep reefs at Mine A mine
Jan 1, 2007
-
Prestasieprys vir technikonstudent
Die Suid-Afrikaanse Instituut vir Mynbou en Metallurgie het 'n paar jaar gelede 'n toekenning vir voortreflike akademiese prestasie deur vierdejaarstudente aan technikons ingestel. Disinvest
Jan 1, 1985
-
The progression of metallurgical testwork during heap leach design
The depletion of favourably located and higher-grade mineral deposits, combined with more favourable metal prices and higher capital costs, has stimulated research into heap leaching of lower grade or
Jan 1, 2009
-
Mine-wide panel stability monitoring at Anglo Platinum Union JV - Synopsis
By D. F. Malan
This paper describes the development and implementation of amine-wide continuous stability monitoring system at the Declines Section, Anglo Platinum Union JV. The Declines Section at Union JV experien
Jan 1, 2010
-
Design of optimum roof support systems in South African collieries using a probabilistic design approach ? Synopsis
When designing coal mine roof support, it is necessary to account for the uncertainties and variability that inherently exist within the rock mass and support elements. The performance of a support sy
Jan 1, 2009
-
Gold Nanotechnology at Mintek
By R. T. Tshikhudo
Nanotechnology can provide solutions to many of the world?s socio-economic challenges. The application of nanomaterials for water treatment and analysis, point-of-care diagnostics and targeted drug de
Jan 1, 2009
-
X-ray Computed Microtomography Studies of MIM and DPR parts
By L. Bam, R. Machaka, S. Chikosha, N. S. Muchavi
"Parts manufactured through power metallurgy (PM) typically contain pores that can be detrimental to the final mechanical properties. This paper explores the merits of 3D X-ray computed tomography ove
Jan 1, 2016
-
A grinding-liberation model for the size reduction of gold ores
By M. R. Khalesi
A method is proposed to estimate the gold content of the ore in the size intervals during size reduction. The method uses the population balance model to trace the gold deportment through the size fra
Jan 1, 2009
-
Reclamation And Environmental Management In Dimension Stone Mining
By I. Ashmole
From the point of view of the environmental impact created, dimension stone mining is a relatively benign industry. There are no emissions besides those of the diesel powered earthmoving equipment uti
Jan 1, 2008
-
A comparative study of two approaches to modelling and prediction in spatial statistics
By L. Cortez, Á. Magalhães, F. Durão
Methods based on regionalized variables theory, commonly known as geostatistics, have been widely used since more than three decades to predict/estimate spatial distributed data, namely mineral resour
Jan 1, 2003
-
Application of the Palla? vibrating mill in ultra fine grinding circuits - Synopsis
By K. Andres
This paper presents the vibrating mill technology and summarizes the grinding principle of ultra fine grinding. In addition, a variety of operations is described and the benefits of these different op
Jan 1, 2010
-
The Development Of Ultra-Fine Grinding At Anglo Platinum
By C. M. Rule, A. K. Anyimadu, L. Knopjes
Ongoing development work on ultra-fine grinding for various applications at the Group?s concentrators has been conducted by Anglo Platinum over the last few years. Current potential applications for
Jan 1, 2006
-
Skorpion Zinc: optimization and innovation - Synopsis
The Skorpion process comprises three processing steps-atmospheric leaching in sulfuric acid, zinc solvent extraction and electrowinning to produce special high grade zinc. The major mode of impurity t
Jan 1, 2007
-
Cave management at Finsch Mine - Synopsis
By C. A. Preece
Finsch Diamond Mine, part of De Beers Consolidated Mines (DBCM), is situated between Kimberley and Postmasburg in the Northern Cape, South Africa. The kimberlite pipe was discovered in 1960 and De Bee
Jan 1, 2007
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural Network
By M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Iron precipitation in biohydrometallurgical operations: An overview of heap bioleaching of sulphide minerals, B. Oladipo, E. Govender-Opitz, and T.V. Ojumua
By B. Oladipo, E. Govender-Opitz, T. V. Ojumu
Bioleaching, one of the several important processes of biohydrometallurgy is an accepted technique for the extraction of desired metals from sulphide ores. Although the mechanism is well understood, t
Jan 1, 2020
-
New technology for real-time in-stope safety management - Synopsis
By D. Vogt
South African underground hard rock mines are typically managed using measurements made daily, weekly or even monthly of key parameters such as face advance, readiness to blast, blast success, tempera
Jan 1, 2010
-
A finite-element method model for a ferromanganese and silicomanganese pilot furnace
By V. K. Risinggård, M. Sparta
We report on the development of a finite-element method model for a pilot furnace for the production of manganese alloys. The model is a multiphysics model that addresses material flow, electrical con
Apr 16, 2024
-
Liner Optimisation To Improve Availability Of The Ridgeway SAG Mill (ce87862d-0ddc-4fb1-a4ed-b071f2daa7ac)
Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur
Jan 1, 2007